2,331MWh Curtailed
2,297MWh Ramped Up
€0.65MEst. Cost
203 MWPeak Positive
Day-Ahead Spot: 0-248 €/MWh (avg 106)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 16 | 11,036 |
| Amprion | positive | 7 | 4,736 |
| 50Hertz | negative | 24 | 4,471 |
| TenneT DE | positive | 4 | 2,890 |
| Amprion | negative | 7 | 1,716 |
| TransnetBW | positive | 3 | 304 |
| TransnetBW | negative | 3 | 222 |
| 50Hertz | positive | 2 | 35 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| SHN Cluster Kiel Süd | TenneT DE | negative | 104 | 2,452 | 22:May-22:May | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 358 | 2,151 | 23:May-05:May |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,400 | 07:May-14:May | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,400 | 07:May-14:May | |
| LAUSWARD_GUDF | Amprion | Konventionell | positive | 282 | 1,341 | 05:May-17:May |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 176 | 1,229 | 01:May-08:May |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 301 | 1,204 | 05:May-09:May |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 148 | 1,076 | 22:May-05:May |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 224 | 840 | 05:May-09:May |
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 118 | 822 | 22:May-05:May |
| Knapsack 1 | Amprion | Konventionell | positive | 386 | 772 | 06:May-08:May |
| Börse | TenneT DE | Sonstiges | negative | 112 | 755 | 22:May-05:May |
| 50H PV Witznitz | 50Hertz | negative | 248 | 745 | 06:May-09:May | |
| BAG NWAK-Cluster 12 Pirach-Simbach | TenneT DE | negative | 100 | 700 | 07:May-14:May | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 700 | 07:May-14:May | |
| Börse | TenneT DE | Sonstiges | negative | 144 | 650 | 17:May-22:May |
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 144 | 650 | 17:May-22:May |
| 50H PV Witznitz | 50Hertz | negative | 200 | 600 | 10:May-13:May | |
| LAUSWARD_GUDF | Amprion | Konventionell | negative | 121 | 486 | 01:May-05:May |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 202 | 404 | 06:May-08:May |
| SHN Cluster Lübeck | TenneT DE | negative | 17 | 395 | 22:May-22:May | |
| HAMMUENTROP_20 | Amprion | Konventionell | negative | 113 | 368 | 22:May-02:May |
| HAMMUENTROP_20 | Amprion | Konventionell | negative | 114 | 341 | 02:May-05:May |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | positive | 195 | 341 | 07:May-08:May |
| GUD_HERNE_6 | Amprion | Konventionell | negative | 82 | 309 | 02:May-06:May |
| Marbach GT 4 (bnBm) | TransnetBW | Konventionell | positive | 216 | 270 | 06:May-08:May |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 133 | 266 | 06:May-08:May |
| GUD_HERNE_6 | Amprion | Konventionell | positive | 210 | 262 | 06:May-08:May |
| SHN Cluster Kiel Süd | TenneT DE | negative | 34 | 241 | 15:May-22:May | |
| Lippendorf | 50Hertz | Konventionell | negative | 184 | 230 | 05:May-07:May |
| 50H OWP Baltic Eagle | 50Hertz | negative | 117 | 206 | 07:May-08:May | |
| Börse | TransnetBW | Sonstiges | negative | 80 | 181 | 07:May-16:May |
| 50H PV Bartow | 50Hertz | negative | 103 | 180 | 07:May-08:May | |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 76 | 152 | 06:May-08:May |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 120 | 120 | 07:May-08:May |
| 50H OWP Arkona | 50Hertz | negative | 68 | 118 | 07:May-08:May | |
| WALSUM_10 | Amprion | Konventionell | negative | 107 | 107 | 16:May-17:May |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 100 | 100 | 07:May-08:May |
| 50H OWP Wikinger | 50Hertz | negative | 71 | 89 | 07:May-08:May | |
| NIEDERAUSSEM_K | Amprion | Konventionell | negative | 45 | 79 | 06:May-08:May |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 60 | 75 | 06:May-08:May |
| 50H OWP Arcadis Ost 1 | 50Hertz | negative | 59 | 74 | 07:May-08:May | |
| Leitzach Pool | TenneT DE | Sonstiges | negative | 53 | 66 | 06:May-08:May |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 35 | 44 | 05:May-07:May |
| Kühtai 1 (Uniper) | TenneT DE | Sonstiges | negative | 85 | 42 | 07:May-07:May |
| Börse | TransnetBW | Sonstiges | positive | 45 | 34 | 05:May-05:May |
| 50H Hamburg Wedel1 | 50Hertz | Konventionell | positive | 29 | 29 | 07:May-08:May |
| 50H Halle-Dieselstr HKW-BlockC | 50Hertz | Konventionell | negative | 14 | 29 | 06:May-08:May |
| HKW Aalen | TransnetBW | Konventionell | negative | 38 | 28 | 07:May-07:May |
| 50H OWP Wikinger | 50Hertz | negative | 56 | 28 | 07:May-08:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.2M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-22?
On 2026-05-22, estimated redispatch costs were approximately €0.65 million. This includes €0.23M for renewable curtailment compensation and €0.31M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-22?
The most affected plant was SHN Cluster Kiel Süd (TenneT DE) with 2,452 MWh of negative redispatch.
What was the electricity spot price on 2026-05-22?
The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 248 €/MWh with an average of 106 €/MWh.