Kühtai 1 (Uniper)

SonstigesTenneT DE

175Total MWh
1Measures
100 MWAvg Power
0Curtailments
1Ramp-ups

Data: 2026-03-26 to 2026-03-26

Daily Redispatch Volume

DateMeasuresTotal MWh
2026-03-26 1 175

Recent Measures

DateTSODirAvg MWMWhTime
2026-03-26 TenneT DE positive 100 175 07:March-08:March

Frequently Asked Questions

What is the redispatch history of Kühtai 1 (Uniper)?

Kühtai 1 (Uniper) is a Sonstiges power plant in the TenneT DE grid zone. It has received 1 redispatch instructions totaling 175 MWh since 2026-03-26.

Why is Kühtai 1 (Uniper) frequently redispatched?

Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.