Kühtai 1 (Uniper)
Sonstiges • TenneT DE
453Total MWh
4Measures
91 MWAvg Power
1Curtailments
3Ramp-ups
Data: 2026-03-26 to 2026-09-07
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2026-09-07 | 1 | 129 |
| 2026-06-06 | 1 | 107 |
| 2026-05-22 | 1 | 42 |
| 2026-03-26 | 1 | 175 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2026-09-07 | TenneT DE | positive | 74 | 129 | 06:September-07:September |
| 2026-06-06 | TenneT DE | positive | 107 | 107 | 01:June-02:June |
| 2026-05-22 | TenneT DE | negative | 85 | 42 | 07:May-07:May |
| 2026-03-26 | TenneT DE | positive | 100 | 175 | 07:March-08:March |
Frequently Asked Questions
What is the redispatch history of Kühtai 1 (Uniper)?
Kühtai 1 (Uniper) is a Sonstiges power plant in the TenneT DE grid zone. It has received 4 redispatch instructions totaling 453 MWh since 2026-03-26.
Why is Kühtai 1 (Uniper) frequently redispatched?
Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.