3,559MWh Curtailed
4,014MWh Ramped Up
€1.38MEst. Cost
256 MWPeak Positive

Day-Ahead Spot: 25-254 €/MWh (avg 158)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TransnetBW positive 12 21,318
TenneT DE negative 11 20,561
Amprion negative 15 16,697
Amprion positive 13 14,865
50Hertz negative 17 11,282
TenneT DE positive 7 9,961
TransnetBW negative 3 3,472
50Hertz positive 2 49

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 530 12,724 22:September-22:September
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 283 6,795 22:September-22:September
ReserveKW Zolling 5 TenneT DE Konventionell positive 253 6,065 22:September-22:September
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 176 4,222 22:September-22:September
NEURATH_G Amprion Konventionell negative 194 3,681 22:September-22:September
Grosskraftwerk Mannheim Block 9 TransnetBW Konventionell negative 179 3,087 22:September-22:September
illwerke vkw AG TransnetBW Sonstiges positive 179 3,084 22:September-22:September
NIEDERAUSSEM_K Amprion Konventionell negative 166 2,988 22:September-22:September
WEISWEILER_G Amprion Konventionell positive 314 2,824 05:September-14:September
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 222 2,441 11:September-22:September
WEISWEILER_G Amprion Konventionell positive 240 2,400 22:September-22:September
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 339 2,375 08:September-15:September
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 334 2,339 06:September-21:September
Grosskraftwerk Mannheim Block 6 TransnetBW Konventionell positive 96 2,200 23:September-22:September
Boxberg (Standort) 50Hertz Konventionell negative 253 2,020 02:September-21:September
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 317 1,904 06:September-12:September
WALSUM_10 Amprion Konventionell negative 235 1,882 22:September-06:September
ReserveKW Zolling 5 TenneT DE Konventionell positive 226 1,695 14:September-22:September
Börse TenneT DE Sonstiges negative 226 1,695 14:September-22:September
KNAPSACK_20 Amprion Konventionell positive 249 1,678 22:September-22:September
NIEHL-31-GUD Amprion Konventionell positive 142 1,564 02:September-13:September
NIEDERAUSSEM_K Amprion Konventionell negative 159 1,554 08:September-22:September
Lippendorf 50Hertz Konventionell negative 377 1,509 05:September-09:September
UW Dörpen-West TenneT DE Erneuerbar negative 332 1,495 09:September-14:September
KNAPSACK_20 Amprion Konventionell negative 195 1,368 01:September-18:September
50H Berlin Lichterfelde 50Hertz Konventionell negative 117 1,289 22:September-17:September
WEISWEILER_G Amprion Konventionell positive 240 1,200 17:September-22:September
WEISWEILER_H Amprion Konventionell negative 231 1,154 17:September-22:September
Börse TenneT DE Sonstiges positive 283 1,132 09:September-13:September
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 127 1,080 13:September-22:September
Emsland Block C Amprion Konventionell positive 250 1,061 04:September-09:September
Jänschwalde (Standort) 50Hertz Konventionell negative 188 938 02:September-16:September
WALSUM_10 Amprion Konventionell negative 142 920 02:September-19:September
BAG NWAK-Cluster 12 Pirach-Simbach TenneT DE Erneuerbar negative 150 862 09:September-15:September
SW München KW-Pool TenneT DE Sonstiges positive 150 748 04:September-09:September
WEISWEILER_H Amprion Konventionell negative 229 744 15:September-18:September
UW Dörpen-West TenneT DE Erneuerbar negative 240 720 14:September-17:September
WEISWEILER_G Amprion Konventionell positive 240 720 14:September-17:September
Datteln_4 Amprion Konventionell negative 190 665 09:September-16:September
Lippendorf 50Hertz Konventionell negative 175 657 04:September-08:September
WEISWEILER_H Amprion Konventionell negative 129 646 22:September-06:September
50H UW Bertikow 50Hertz Erneuerbar negative 104 522 09:September-14:September
Boxberg (Standort) 50Hertz Konventionell negative 181 498 09:September-16:September
Börse TransnetBW Sonstiges positive 181 498 16:September-19:September
LAUSWARD_GUDF Amprion Konventionell positive 271 474 07:September-09:September
KNAPSACK_20 Amprion Konventionell positive 118 471 05:September-22:September
Schkopau 50Hertz Konventionell negative 121 454 05:September-09:September
NEURATH_G Amprion Konventionell negative 144 433 09:September-16:September
WEISWEILER_H Amprion Konventionell positive 161 322 08:September-10:September
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 159 318 14:September-16:September

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.41M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-09-07?

On 2026-09-07, estimated redispatch costs were approximately €1.38 million. This includes €0.36M for renewable curtailment compensation and €0.75M for conventional ramp-up costs.

Which power plants were most affected on 2026-09-07?

The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 12,724 MWh of negative redispatch.

What was the electricity spot price on 2026-09-07?

The EPEX Day-Ahead spot price for DE_LU ranged from 25 to 254 €/MWh with an average of 158 €/MWh.