2,667MWh Curtailed
2,793MWh Ramped Up
€0.79MEst. Cost
295 MWPeak Positive
Day-Ahead Spot: 55-269 €/MWh (avg 118)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 15 | 11,023 |
| TransnetBW | positive | 9 | 6,412 |
| Amprion | negative | 5 | 4,141 |
| TenneT DE | positive | 5 | 3,976 |
| Amprion | positive | 4 | 1,907 |
| 50Hertz | negative | 2 | 201 |
| TransnetBW | negative | 1 | 150 |
| 50Hertz | positive | 1 | 32 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| UW Büttel | TenneT DE | negative | 630 | 3,151 | 01:April-06:April | |
| WALSUM_10 | Amprion | Konventionell | negative | 276 | 3,107 | 03:April-14:April |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 346 | 3,026 | 02:April-10:April |
| Börse | TenneT DE | Sonstiges | negative | 405 | 2,428 | 22:April-04:April |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 405 | 2,428 | 22:April-04:April |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 | TransnetBW | Konventionell | positive | 239 | 2,387 | 01:April-11:April |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 288 | 1,438 | 01:April-06:April |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 249 | 1,246 | 01:April-06:April |
| Emsland Block C | Amprion | Konventionell | positive | 194 | 1,068 | 04:April-10:April |
| Niederrad 1 | TenneT DE | Konventionell | positive | 30 | 720 | 22:April-22:April |
| WALSUM_10 | Amprion | Konventionell | positive | 162 | 650 | 05:April-09:April |
| UW Diele | TenneT DE | negative | 162 | 650 | 05:April-09:April | |
| Gebersdorf 1 | TenneT DE | Konventionell | positive | 90 | 540 | 03:April-09:April |
| WEISWEILER_H | Amprion | Konventionell | negative | 201 | 452 | 02:April-05:April |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 114 | 400 | 01:April-04:April |
| AVA Cluster Alfstedt | TenneT DE | negative | 188 | 375 | 01:April-03:April | |
| UW Diele | TenneT DE | negative | 58 | 332 | 05:April-11:April | |
| Grosskraftwerk Mannheim Block 9 | TransnetBW | Konventionell | positive | 110 | 329 | 01:April-04:April |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 161 | 322 | 00:April-03:April |
| STUMMHAFEN_10 | Amprion | Konventionell | negative | 265 | 265 | 03:April-04:April |
| Datteln_4 | Amprion | Konventionell | negative | 86 | 257 | 06:April-09:April |
| AVA Cluster Lehrte | TenneT DE | negative | 79 | 238 | 01:April-04:April | |
| Börse | TenneT DE | Sonstiges | positive | 385 | 192 | 02:April-02:April |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 44 | 175 | 14:April-18:April |
| Börse | TransnetBW | Sonstiges | negative | 67 | 150 | 00:April-14:April |
| UW Diele | TenneT DE | negative | 58 | 144 | 07:April-10:April | |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 27 | 144 | 08:April-14:April |
| Börse | TransnetBW | Sonstiges | positive | 85 | 127 | 00:April-05:April |
| UW Diele | TenneT DE | negative | 252 | 126 | 01:April-01:April | |
| Irsching 4 | TenneT DE | Konventionell | negative | 30 | 120 | 18:April-22:April |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 33 | 108 | 04:April-08:April |
| 50H Berlin Lichterfelde | 50Hertz | Konventionell | negative | 34 | 101 | 11:April-14:April |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 33 | 100 | 11:April-14:April |
| Frankfurt West 3 | TenneT DE | Konventionell | positive | 12 | 96 | 07:April-15:April |
| Hannover (GKH) 2 | TenneT DE | Konventionell | negative | 10 | 85 | 22:April-06:April |
| Leitzach Pool | TenneT DE | Sonstiges | negative | 20 | 80 | 22:April-02:April |
| CHEMIEPARK_MARL_KRAFTWERKE | Amprion | Konventionell | negative | 20 | 60 | 11:April-14:April |
| UW Garrel-Ost alpha | TenneT DE | negative | 73 | 54 | 09:April-10:April | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 73 | 54 | 09:April-10:April |
| Börse | Amprion | Konventionell | positive | 180 | 45 | 00:April-00:April |
| UW Büttel | TenneT DE | negative | 32 | 40 | 04:April-05:April | |
| Börse | 50Hertz | Sonstiges | positive | 12 | 32 | 01:April-09:April |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.24M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-04-10?
On 2026-04-10, estimated redispatch costs were approximately €0.79 million. This includes €0.27M for renewable curtailment compensation and €0.41M for conventional ramp-up costs.
Which power plants were most affected on 2026-04-10?
The most affected plant was UW Büttel (TenneT DE) with 3,151 MWh of negative redispatch.
What was the electricity spot price on 2026-04-10?
The EPEX Day-Ahead spot price for DE_LU ranged from 55 to 269 €/MWh with an average of 118 €/MWh.