2,281MWh Curtailed
1,826MWh Ramped Up
€0.54MEst. Cost
173 MWPeak Positive
Day-Ahead Spot: -26-155 €/MWh (avg 75)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 23 | 42,826 |
| Amprion | positive | 35 | 41,371 |
| TenneT DE | positive | 17 | 28,220 |
| TransnetBW | positive | 18 | 16,845 |
| 50Hertz | negative | 25 | 15,755 |
| Amprion | negative | 8 | 1,889 |
| TransnetBW | negative | 2 | 574 |
| 50Hertz | positive | 4 | 184 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | positive | 997 | 14,953 | 22:April-16:April |
| UW Büttel | TenneT DE | negative | 880 | 9,682 | 11:April-22:April | |
| UW Diele | TenneT DE | negative | 649 | 7,298 | 06:April-22:April | |
| UW Büttel | TenneT DE | negative | 1184 | 6,810 | 22:April-03:April | |
| Knapsack 1 | Amprion | Konventionell | positive | 579 | 6,220 | 04:April-22:April |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 399 | 4,888 | 22:April-22:April |
| AVA Cluster Voslapp | TenneT DE | negative | 325 | 3,980 | 09:April-22:April | |
| AVA Cluster Voslapp | TenneT DE | negative | 297 | 3,717 | 22:April-10:April | |
| KMW_KW3 | Amprion | Konventionell | positive | 221 | 3,652 | 22:April-14:April |
| Emsland Block B | Amprion | Konventionell | positive | 199 | 3,490 | 00:April-22:April |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 262 | 3,400 | 22:April-11:April |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 356 | 3,205 | 13:April-22:April |
| Börse | TenneT DE | Sonstiges | negative | 314 | 2,905 | 22:April-22:April |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 284 | 2,844 | 22:April-08:April |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 | TransnetBW | Konventionell | positive | 315 | 2,837 | 22:April-07:April |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 389 | 2,724 | 15:April-22:April |
| NIEHL-II | Amprion | Konventionell | positive | 243 | 2,676 | 11:April-22:April |
| Irsching 4 | TenneT DE | Konventionell | positive | 379 | 2,464 | 22:April-04:April |
| Knapsack 1 | Amprion | Konventionell | positive | 432 | 2,373 | 01:April-06:April |
| Knapsack 1 | Amprion | Konventionell | positive | 487 | 2,192 | 22:April-02:April |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 | TransnetBW | Konventionell | positive | 346 | 2,164 | 15:April-22:April |
| KMW_KW3 | Amprion | Konventionell | positive | 308 | 2,159 | 15:April-22:April |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 401 | 2,104 | 22:April-03:April |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 334 | 2,086 | 22:April-04:April |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 334 | 2,002 | 15:April-22:April |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 317 | 1,899 | 04:April-22:April |
| GERSTEINW_F (KapRes) | Amprion | Konventionell | positive | 165 | 1,856 | 10:April-22:April |
| GUD_HERNE_6 | Amprion | Konventionell | positive | 254 | 1,780 | 15:April-22:April |
| Irsching 5 | TenneT DE | Konventionell | positive | 228 | 1,767 | 00:April-07:April |
| GERSTEINW_G (KapRes) | Amprion | Konventionell | positive | 164 | 1,679 | 11:April-22:April |
| Emsland Block C | Amprion | Konventionell | positive | 134 | 1,505 | 02:April-21:April |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 117 | 1,404 | 22:April-10:April |
| GUD_HERNE_6 | Amprion | Konventionell | positive | 228 | 1,312 | 16:April-22:April |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 250 | 1,252 | 22:April-03:April |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,200 | 09:April-15:April | |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 275 | 1,170 | 22:April-02:April |
| STUMMHAFEN_10 | Amprion | Konventionell | positive | 218 | 1,090 | 22:April-03:April |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 207 | 1,085 | 22:April-03:April |
| UW Emden-Ost | TenneT DE | negative | 298 | 1,041 | 18:April-22:April | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 169 | 1,016 | 09:April-15:April | |
| Niederrad 1 | TenneT DE | Konventionell | positive | 40 | 967 | 22:April-22:April |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 94 | 941 | 00:April-22:April |
| NIEDERAUSSEM_K | Amprion | Konventionell | negative | 312 | 938 | 22:April-01:April |
| Linden GKL GT 1 | TenneT DE | Konventionell | positive | 65 | 925 | 01:April-22:April |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 303 | 910 | 19:April-22:April |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 142 | 855 | 15:April-22:April |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 119 | 775 | 15:April-22:April |
| NIEDERAUSSEM_G | Amprion | Konventionell | positive | 172 | 774 | 22:April-02:April |
| Grosskraftwerk Mannheim Block 9 | TransnetBW | Konventionell | positive | 183 | 733 | 22:April-02:April |
| NIEHL-II | Amprion | Konventionell | positive | 161 | 723 | 22:April-02:April |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.16M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-04-09?
On 2026-04-09, estimated redispatch costs were approximately €0.54 million. This includes €0.23M for renewable curtailment compensation and €0.19M for conventional ramp-up costs.
Which power plants were most affected on 2026-04-09?
The most affected plant was Börse (TenneT DE) with 14,953 MWh of positive redispatch.
What was the electricity spot price on 2026-04-09?
The EPEX Day-Ahead spot price for DE_LU ranged from -26 to 155 €/MWh with an average of 75 €/MWh.