2,676MWh Curtailed
2,079MWh Ramped Up
€0.68MEst. Cost
200 MWPeak Positive
Day-Ahead Spot: -12-190 €/MWh (avg 93)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | positive | 7 | 24,930 |
| TenneT DE | negative | 10 | 16,564 |
| Amprion | positive | 4 | 9,086 |
| 50Hertz | negative | 4 | 2,432 |
| TransnetBW | negative | 2 | 1,475 |
| TransnetBW | positive | 2 | 826 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | positive | 999 | 15,978 | 22:April-22:April |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 555 | 9,162 | 22:April-22:April |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 385 | 4,720 | 22:April-22:April |
| Emsland Block C | Amprion | Konventionell | positive | 291 | 3,711 | 23:April-20:April |
| Knapsack 1 | Amprion | Konventionell | positive | 361 | 2,889 | 22:April-06:April |
| Netzreservekraftwerk Bexbach A | Amprion | Konventionell | positive | 250 | 2,250 | 00:April-09:April |
| Börse | TenneT DE | Sonstiges | negative | 388 | 2,232 | 22:April-04:April |
| UW Diele | TenneT DE | negative | 278 | 1,670 | 22:April-04:April | |
| 50H_EDIS_CR_WU | 50Hertz | negative | 244 | 1,588 | 08:April-14:April | |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 262 | 1,572 | 16:April-22:April |
| Börse | TransnetBW | Sonstiges | negative | 241 | 1,448 | 16:April-22:April |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,200 | 08:April-14:April | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,200 | 08:April-14:April | |
| Niederrad 1 | TenneT DE | Konventionell | positive | 41 | 948 | 23:April-22:April |
| Börse | TenneT DE | Sonstiges | positive | 296 | 889 | 19:April-22:April |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 600 | 08:April-14:April | |
| Niederrad 1 | TenneT DE | Konventionell | positive | 35 | 522 | 07:April-22:April |
| 50H PV Witznitz | 50Hertz | negative | 71 | 498 | 08:April-15:April | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 225 | 450 | 17:April-19:April |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 89 | 376 | 22:April-20:April |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 32 | 324 | 05:April-22:April |
| Frankfurt West 3 | TenneT DE | Konventionell | positive | 25 | 300 | 05:April-17:April |
| Knapsack 1 | Amprion | Konventionell | positive | 135 | 236 | 20:April-22:April |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 99 | 222 | 19:April-22:April |
| Börse | TenneT DE | Sonstiges | negative | 29 | 138 | 23:April-04:April |
| UW Diele | TenneT DE | negative | 152 | 114 | 21:April-22:April | |
| Baden-Württemberg Süd-Ost EE | TransnetBW | negative | 14 | 27 | 08:April-10:April | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 100 | 25 | 21:April-22:April |
| Börse | 50Hertz | Sonstiges | negative | 6 | 22 | 10:April-14:April |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.2M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-04-08?
On 2026-04-08, estimated redispatch costs were approximately €0.68 million. This includes €0.27M for renewable curtailment compensation and €0.26M for conventional ramp-up costs.
Which power plants were most affected on 2026-04-08?
The most affected plant was Börse (TenneT DE) with 15,978 MWh of positive redispatch.
What was the electricity spot price on 2026-04-08?
The EPEX Day-Ahead spot price for DE_LU ranged from -12 to 190 €/MWh with an average of 93 €/MWh.