← 2026-04-07

Wednesday, April 8, 2026

2026-04-09 →
2,676MWh Curtailed
2,079MWh Ramped Up
€0.68MEst. Cost
200 MWPeak Positive

Day-Ahead Spot: -12-190 €/MWh (avg 93)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE positive 7 24,930
TenneT DE negative 10 16,564
Amprion positive 4 9,086
50Hertz negative 4 2,432
TransnetBW negative 2 1,475
TransnetBW positive 2 826

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 999 15,978 22:April-22:April
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 555 9,162 22:April-22:April
ReserveKW Staudinger 5 TenneT DE Konventionell positive 385 4,720 22:April-22:April
Emsland Block C Amprion Konventionell positive 291 3,711 23:April-20:April
Knapsack 1 Amprion Konventionell positive 361 2,889 22:April-06:April
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 250 2,250 00:April-09:April
Börse TenneT DE Sonstiges negative 388 2,232 22:April-04:April
UW Diele TenneT DE Erneuerbar negative 278 1,670 22:April-04:April
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 244 1,588 08:April-14:April
ReserveKW Staudinger 5 TenneT DE Konventionell positive 262 1,572 16:April-22:April
Börse TransnetBW Sonstiges negative 241 1,448 16:April-22:April
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,200 08:April-14:April
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,200 08:April-14:April
Niederrad 1 TenneT DE Konventionell positive 41 948 23:April-22:April
Börse TenneT DE Sonstiges positive 296 889 19:April-22:April
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 100 600 08:April-14:April
Niederrad 1 TenneT DE Konventionell positive 35 522 07:April-22:April
50H PV Witznitz 50Hertz Erneuerbar negative 71 498 08:April-15:April
illwerke vkw AG TransnetBW Sonstiges positive 225 450 17:April-19:April
illwerke vkw AG TransnetBW Sonstiges positive 89 376 22:April-20:April
Boxberg (Standort) 50Hertz Konventionell negative 32 324 05:April-22:April
Frankfurt West 3 TenneT DE Konventionell positive 25 300 05:April-17:April
Knapsack 1 Amprion Konventionell positive 135 236 20:April-22:April
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 99 222 19:April-22:April
Börse TenneT DE Sonstiges negative 29 138 23:April-04:April
UW Diele TenneT DE Erneuerbar negative 152 114 21:April-22:April
Baden-Württemberg Süd-Ost EE TransnetBW Erneuerbar negative 14 27 08:April-10:April
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 100 25 21:April-22:April
Börse 50Hertz Sonstiges negative 6 22 10:April-14:April

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.2M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-04-08?

On 2026-04-08, estimated redispatch costs were approximately €0.68 million. This includes €0.27M for renewable curtailment compensation and €0.26M for conventional ramp-up costs.

Which power plants were most affected on 2026-04-08?

The most affected plant was Börse (TenneT DE) with 15,978 MWh of positive redispatch.

What was the electricity spot price on 2026-04-08?

The EPEX Day-Ahead spot price for DE_LU ranged from -12 to 190 €/MWh with an average of 93 €/MWh.