Baden-Württemberg Süd-Ost EE

ErneuerbarTransnetBW

203Total MWh
3Measures
35 MWAvg Power
3Curtailments
0Ramp-ups

Data: 2025-03-20 to 2026-04-18

Daily Redispatch Volume

DateMeasuresTotal MWh
2026-04-18 1 174
2026-04-08 1 27
2025-03-20 1 1

Recent Measures

DateTSODirAvg MWMWhTime
2026-04-18 TransnetBW negative 87 174 08:April-13:April
2026-04-08 TransnetBW negative 14 27 08:April-10:April
2025-03-20 TransnetBW negative 4 1 11:March-11:March

Frequently Asked Questions

What is the redispatch history of Baden-Württemberg Süd-Ost EE?

Baden-Württemberg Süd-Ost EE is a Erneuerbar power plant in the TransnetBW grid zone. It has received 3 redispatch instructions totaling 203 MWh since 2025-03-20.

Why is Baden-Württemberg Süd-Ost EE frequently redispatched?

Plants in the TransnetBW zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.