← 2026-06-12

Saturday, June 13, 2026

2026-06-14 →
666MWh Curtailed
655MWh Ramped Up
€0.37MEst. Cost
124 MWPeak Positive

Day-Ahead Spot: -53-110 €/MWh (avg 25)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 33 60,788
Amprion positive 33 49,608
TenneT DE positive 6 19,222
TransnetBW positive 12 9,544
50Hertz negative 15 5,802
50Hertz positive 6 1,741
Amprion negative 1 22

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
UW Büttel TenneT DE Erneuerbar negative 702 11,926 05:June-22:June
Börse TenneT DE Sonstiges positive 1020 11,480 22:June-22:June
Börse TenneT DE Sonstiges positive 922 6,684 03:June-22:June
UW Dörpen-West TenneT DE Erneuerbar negative 430 6,564 04:June-22:June
WALSUM_10 Amprion Konventionell positive 465 6,044 22:June-22:June
UW Dörpen-West TenneT DE Erneuerbar negative 937 5,620 22:June-04:June
UW Emden-Ost TenneT DE Erneuerbar negative 393 4,817 09:June-22:June
Knapsack 1 Amprion Konventionell positive 301 4,368 22:June-22:June
UW Büttel TenneT DE Erneuerbar negative 696 4,174 22:June-04:June
WEISWEILER_H Amprion Konventionell positive 435 3,587 13:June-22:June
AVA Cluster Voslapp TenneT DE Erneuerbar negative 145 3,300 22:June-22:June
SHN Cluster Kiel Süd TenneT DE Erneuerbar negative 142 3,265 22:June-22:June
GUD_HERNE_6 Amprion Konventionell positive 423 2,958 15:June-22:June
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 121 2,900 22:June-22:June
UW Diele TenneT DE Erneuerbar negative 472 2,833 22:June-04:June
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 561 2,805 17:June-22:June
WEISWEILER_H Amprion Konventionell positive 350 2,802 22:June-06:June
KNAPSACK_20 Amprion Konventionell positive 277 2,627 22:June-22:June
WALSUM_10 Amprion Konventionell positive 462 2,544 16:June-22:June
WALSUM_10 Amprion Konventionell positive 190 2,328 23:June-22:June
Netzreservekraftwerk BERGKAMEN_A Amprion Konventionell positive 280 2,240 22:June-06:June
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 176 2,072 22:June-22:June
Knapsack 1 Amprion Konventionell positive 420 1,993 17:June-22:June
NEURATH_F Amprion Konventionell positive 215 1,993 22:June-18:June
NIEHL-II Amprion Konventionell positive 199 1,986 22:June-22:June
SHN Cluster Heide West T411 T412 TenneT DE Erneuerbar negative 278 1,737 15:June-22:June
UW Diele TenneT DE Erneuerbar negative 143 1,641 05:June-19:June
UW Dörpen-West TenneT DE Erneuerbar negative 310 1,473 01:June-06:June
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,400 08:June-15:June
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,400 08:June-15:June
NIEHL-II Amprion Konventionell positive 155 1,392 13:June-22:June
KNAPSACK_20 Amprion Konventionell positive 264 1,384 16:June-22:June
AVA Cluster Lehrte TenneT DE Erneuerbar negative 239 1,374 14:June-19:June
illwerke vkw AG TransnetBW Sonstiges positive 276 1,310 16:June-22:June
AVA Cluster Voslapp TenneT DE Erneuerbar negative 193 1,206 15:June-22:June
NIEDERAUSSEM_G Amprion Konventionell positive 156 1,134 02:June-22:June
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 186 1,119 16:June-22:June
Boxberg (Standort) 50Hertz Konventionell negative 263 1,052 18:June-22:June
illwerke vkw AG TransnetBW Sonstiges positive 259 1,035 02:June-06:June
Knapsack 1 Amprion Konventionell positive 206 1,032 16:June-22:June
Emsland Block C Amprion Konventionell positive 190 950 01:June-06:June
Schwarze Pumpe (Standort) 50Hertz Konventionell positive 237 949 01:June-05:June
NIEDERAUSSEM_G Amprion Konventionell positive 136 921 02:June-20:June
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 153 920 04:June-22:June
UW Emden-Ost TenneT DE Erneuerbar negative 256 895 22:June-04:June
AVA Cluster Twistetal TenneT DE Erneuerbar negative 170 891 16:June-22:June
AVA Cluster Elsen TenneT DE Erneuerbar negative 174 870 17:June-22:June
SHN Cluster Lübeck TenneT DE Erneuerbar negative 36 814 22:June-22:June
Grosskraftwerk Mannheim Block 6 TransnetBW Konventionell positive 100 800 22:June-06:June
Emsland Block C Amprion Konventionell positive 168 755 02:June-07:June

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.11M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-06-13?

On 2026-06-13, estimated redispatch costs were approximately €0.37 million. This includes €0.07M for renewable curtailment compensation and €0.04M for conventional ramp-up costs.

Which power plants were most affected on 2026-06-13?

The most affected plant was UW Büttel (TenneT DE) with 11,926 MWh of negative redispatch.

What was the electricity spot price on 2026-06-13?

The EPEX Day-Ahead spot price for DE_LU ranged from -53 to 110 €/MWh with an average of 25 €/MWh.