2,677MWh Curtailed
2,438MWh Ramped Up
€0.61MEst. Cost
165 MWPeak Positive

Day-Ahead Spot: 34-206 €/MWh (avg 112)

TSO Breakdown

TSODirectionMeasuresTotal MWh
Amprion positive 6 9,330
Amprion negative 15 6,157
TenneT DE positive 2 1,599
50Hertz negative 9 1,343
TenneT DE negative 5 1,236
TransnetBW negative 3 846
TransnetBW positive 4 802
50Hertz positive 2 130

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 374 6,353 22:April-15:April
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 361 2,165 16:April-22:April
Börse TenneT DE Sonstiges positive 303 1,516 03:April-20:April
HAMMUENTROP_20 Amprion Konventionell negative 149 1,154 22:April-05:April
WALSUM_10 Amprion Konventionell negative 162 1,094 00:April-10:April
HAMMUENTROP_20 Amprion Konventionell negative 146 876 01:April-07:April
Datteln_4 Amprion Konventionell negative 118 858 22:April-06:April
Irsching 4 TenneT DE Konventionell negative 190 712 04:April-07:April
Börse TransnetBW Sonstiges negative 97 533 22:April-15:April
Börse Amprion Konventionell positive 284 496 05:April-06:April
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 177 442 05:April-07:April
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 107 400 10:April-14:April
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 63 315 10:April-15:April
Datteln_4 Amprion Konventionell negative 100 300 19:April-22:April
LAUSWARD_GUDF Amprion Konventionell negative 100 300 19:April-22:April
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 42 274 06:April-13:April
50H Berlin Mitte 50Hertz Konventionell negative 84 274 07:April-16:April
Börse Amprion Konventionell negative 42 274 06:April-13:April
NEURATH_F Amprion Konventionell negative 91 272 07:April-10:April
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell negative 57 269 04:April-08:April
Irsching 5 TenneT DE Konventionell negative 66 264 04:April-08:April
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 98 246 05:April-07:April
NIEHL-II Amprion Konventionell negative 121 242 16:April-18:April
Börse Amprion Konventionell negative 92 208 17:April-20:April
NIEDERAUSSEM_K Amprion Konventionell negative 88 176 07:April-09:April
Börse TenneT DE Sonstiges negative 171 171 11:April-12:April
HERDECKE_H6 Amprion Konventionell negative 84 168 16:April-18:April
WEISWEILER_G Amprion Konventionell negative 50 150 19:April-22:April
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 127 127 09:April-10:April
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 70 105 05:April-06:April
Börse 50Hertz Sonstiges positive 28 92 07:April-16:April
Frankfurt West 3 TenneT DE Konventionell positive 17 83 06:April-11:April
50H Hamburg Tiefstack 2 HKW SK 50Hertz Konventionell negative 30 82 07:April-16:April
Irsching 4 TenneT DE Konventionell negative 20 75 00:April-04:April
50H Berlin Lichterfelde 50Hertz Konventionell negative 38 67 08:April-10:April
Börse Amprion Konventionell negative 87 65 07:April-07:April
Börse TransnetBW Sonstiges negative 35 44 02:April-09:April
50H Berlin Mitte 50Hertz Konventionell negative 19 38 06:April-08:April
Ahrensfelde B (KapRes) 50Hertz Konventionell positive 19 38 06:April-08:April
NIEHL-II Amprion Konventionell positive 48 36 08:April-08:April
Boxberg (Standort) 50Hertz Konventionell negative 40 30 09:April-10:April
CHEMIEPARK_MARL_KRAFTWERKE Amprion Konventionell negative 20 20 19:April-20:April
Irsching 4 TenneT DE Konventionell negative 60 15 22:April-22:April
50H BASF Schwarzheide 50Hertz Konventionell negative 5 10 07:April-09:April
Börse TransnetBW Sonstiges positive 16 8 08:April-08:April
Börse Amprion Konventionell positive 6 6 18:April-19:April

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.18M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-04-16?

On 2026-04-16, estimated redispatch costs were approximately €0.61 million. This includes €0.27M for renewable curtailment compensation and €0.35M for conventional ramp-up costs.

Which power plants were most affected on 2026-04-16?

The most affected plant was Netzreservekraftwerk Bexbach A (Amprion) with 6,353 MWh of positive redispatch.

What was the electricity spot price on 2026-04-16?

The EPEX Day-Ahead spot price for DE_LU ranged from 34 to 206 €/MWh with an average of 112 €/MWh.