← 2026-04-16

Friday, April 17, 2026

2026-04-18 →
2,546MWh Curtailed
2,558MWh Ramped Up
€0.61MEst. Cost
154 MWPeak Positive

Day-Ahead Spot: 29-170 €/MWh (avg 109)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE positive 14 20,371
TenneT DE negative 12 19,615
50Hertz negative 32 17,703
Amprion positive 7 3,672
TransnetBW positive 6 1,060
Amprion negative 4 314
50Hertz positive 3 174

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
ReserveKW Zolling 5 TenneT DE Konventionell positive 360 8,640 22:April-22:April
Börse TenneT DE Sonstiges negative 350 8,395 22:April-22:April
ReserveKW Zolling 5 TenneT DE Konventionell positive 292 4,378 07:April-22:April
Börse TenneT DE Sonstiges positive 400 2,800 22:April-05:April
Börse TenneT DE Sonstiges negative 294 2,798 08:April-22:April
Boxberg (Standort) 50Hertz Konventionell negative 530 2,784 05:April-15:April
Börse TenneT DE Sonstiges negative 358 2,507 07:April-14:April
50H PV Witznitz 50Hertz Erneuerbar negative 269 1,880 07:April-14:April
Knapsack 1 Amprion Konventionell positive 572 1,717 06:April-09:April
Lippendorf 50Hertz Konventionell negative 552 1,656 05:April-08:April
Börse TenneT DE Sonstiges positive 268 1,610 16:April-22:April
BAG NWAK-Cluster 13 Etzenricht TenneT DE Erneuerbar negative 273 1,500 07:April-13:April
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 273 1,500 07:April-13:April
Emsland Block B Amprion Konventionell positive 188 1,457 01:April-09:April
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 250 1,375 07:April-13:April
50H_TEN_CR_S1_ATF 50Hertz Erneuerbar negative 208 1,350 07:April-14:April
50H_MNS_CR_PUL 50Hertz Erneuerbar negative 198 1,235 07:April-13:April
Jänschwalde (Standort) 50Hertz Konventionell negative 223 891 05:April-09:April
ReserveKW Staudinger 5 TenneT DE Konventionell positive 206 771 07:April-11:April
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 171 725 08:April-14:April
50H_MNS_CR_MA_Nord 50Hertz Erneuerbar negative 124 680 07:April-13:April
50H_MNS_CR_KLM 50Hertz Erneuerbar negative 106 662 07:April-13:April
50H_AVA_CR_STW 50Hertz Erneuerbar negative 218 600 08:April-14:April
50H PV Bartow 50Hertz Erneuerbar negative 92 554 08:April-14:April
50H_MNS_CR_LAU_Nord 50Hertz Erneuerbar negative 95 548 08:April-13:April
Frankfurt West 4 TenneT DE Konventionell positive 60 540 06:April-15:April
50H_MNS_CR_LAU_Sued 50Hertz Erneuerbar negative 93 532 08:April-13:April
50H Berlin Mitte 50Hertz Konventionell negative 109 435 04:April-08:April
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 121 425 08:April-11:April
Börse TransnetBW Sonstiges positive 68 424 02:April-14:April
Hannover (GKH) 2 TenneT DE Konventionell positive 52 416 07:April-15:April
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 100 400 09:April-13:April
BAG NWAK-Cluster 14 Schwandorf TenneT DE Erneuerbar negative 100 400 09:April-13:April
Börse TenneT DE Sonstiges negative 143 394 07:April-10:April
50H_MNS_CR_JSN 50Hertz Erneuerbar negative 118 353 08:April-11:April
50H_MNS_CR_MA_Sued 50Hertz Erneuerbar negative 64 336 08:April-13:April
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 163 326 07:April-09:April
50H Berlin Lichterfelde 50Hertz Konventionell negative 81 324 04:April-08:April
Linden GKL GT 1 TenneT DE Konventionell positive 62 296 05:April-09:April
Grosskraftwerk Mannheim Block 9 TransnetBW Konventionell positive 116 289 11:April-13:April
BAG NWAK-Cluster 04 Aschaffenburg TenneT DE Erneuerbar negative 50 275 07:April-13:April
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 81 262 09:April-12:April
Braunschweig HKWM GT31 TenneT DE Konventionell positive 42 250 07:April-13:April
Netzreservekraftwerk Bexbach A Amprion Konventionell negative 100 225 09:April-13:April
50H_EDIS_CR_SW 50Hertz Erneuerbar negative 50 198 08:April-12:April
WEISWEILER_G Amprion Konventionell positive 111 194 06:April-08:April
50H_TEN_CR_M1_EI 50Hertz Erneuerbar negative 30 183 08:April-14:April
illwerke vkw AG TransnetBW Sonstiges positive 50 164 07:April-15:April
Audorf TenneT DE Konventionell positive 50 162 05:April-09:April
Linden GKL DT TenneT DE Konventionell positive 39 146 05:April-09:April

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.18M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-04-17?

On 2026-04-17, estimated redispatch costs were approximately €0.61 million. This includes €0.25M for renewable curtailment compensation and €0.36M for conventional ramp-up costs.

Which power plants were most affected on 2026-04-17?

The most affected plant was ReserveKW Zolling 5 (TenneT DE) with 8,640 MWh of positive redispatch.

What was the electricity spot price on 2026-04-17?

The EPEX Day-Ahead spot price for DE_LU ranged from 29 to 170 €/MWh with an average of 109 €/MWh.