← 2026-04-14

Wednesday, April 15, 2026

2026-04-16 →
2,790MWh Curtailed
2,464MWh Ramped Up
€0.65MEst. Cost
164 MWPeak Positive

Day-Ahead Spot: 22-252 €/MWh (avg 119)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TransnetBW positive 6 7,414
Amprion negative 9 3,199
TenneT DE positive 3 2,766
TenneT DE negative 3 1,481
50Hertz negative 4 1,453
TransnetBW negative 1 27
50Hertz positive 1 10

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 263 3,158 22:April-10:April
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 234 2,810 22:April-10:April
Frankfurt West 4 TenneT DE Konventionell positive 62 1,485 22:April-22:April
Frankfurt West 4 TenneT DE Konventionell positive 65 1,099 05:April-22:April
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 181 950 09:April-14:April
NIEDERAUSSEM_G Amprion Konventionell negative 193 772 22:April-02:April
Knapsack 1 Amprion Konventionell negative 138 688 22:April-03:April
UW Diele TenneT DE Erneuerbar negative 297 669 10:April-12:April
Irsching 4 TenneT DE Konventionell negative 60 660 22:April-22:April
Pumpspeicherwerk Wehr RZ TNG TransnetBW Sonstiges positive 245 490 10:April-12:April
Boxberg (Standort) 50Hertz Konventionell negative 67 452 07:April-16:April
NIEDERAUSSEM_H Amprion Konventionell negative 141 422 22:April-01:April
Knapsack 1 Amprion Konventionell negative 241 422 20:April-22:April
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 94 399 10:April-14:April
NIEHL-II Amprion Konventionell negative 59 325 22:April-07:April
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 160 280 20:April-22:April
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 185 278 20:April-22:April
KMW_KW3 Amprion Konventionell negative 121 242 22:April-00:April
NEURATH_F Amprion Konventionell negative 98 220 12:April-14:April
SW München KW-Pool TenneT DE Sonstiges positive 122 182 22:April-00:April
UW Emden-Ost TenneT DE Erneuerbar negative 76 152 10:April-12:April
KMW_KW3 Amprion Konventionell negative 111 83 21:April-22:April
50H_EDIS_CR_HND 50Hertz Erneuerbar negative 50 50 10:April-11:April
Börse TransnetBW Sonstiges negative 36 27 07:April-22:April
NIEDERAUSSEM_G Amprion Konventionell negative 100 25 21:April-22:April
Börse 50Hertz Sonstiges positive 39 10 06:April-07:April
Börse 50Hertz Sonstiges negative 4 1 11:April-12:April

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.2M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-04-15?

On 2026-04-15, estimated redispatch costs were approximately €0.65 million. This includes €0.28M for renewable curtailment compensation and €0.37M for conventional ramp-up costs.

Which power plants were most affected on 2026-04-15?

The most affected plant was Reservekraftwerk Heilbronn Block 7 (TransnetBW) with 3,158 MWh of positive redispatch.

What was the electricity spot price on 2026-04-15?

The EPEX Day-Ahead spot price for DE_LU ranged from 22 to 252 €/MWh with an average of 119 €/MWh.