← 2026-03-22

Monday, March 23, 2026

2026-03-24 →
2,897MWh Curtailed
3,023MWh Ramped Up
€0.87MEst. Cost
277 MWPeak Positive

Day-Ahead Spot: 32-296 €/MWh (avg 138)

TSO Breakdown

TSODirectionMeasuresTotal MWh
Amprion positive 13 19,802
50Hertz negative 19 8,840
TenneT DE negative 9 7,396
TenneT DE positive 10 4,798
Amprion negative 9 4,182
TransnetBW positive 2 668
TransnetBW negative 5 489
50Hertz positive 3 225

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Emsland Block D Amprion Konventionell positive 389 4,469 23:March-19:March
HAMMUENTROP_20 Amprion Konventionell positive 268 4,292 23:March-22:March
Emsland Block D Amprion Konventionell positive 331 3,308 05:March-15:March
HAMMUENTROP_20 Amprion Konventionell positive 228 1,999 07:March-15:March
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 300 1,950 08:March-15:March
Boxberg (Standort) 50Hertz Konventionell negative 191 1,768 06:March-15:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 259 1,750 08:March-15:March
Irsching 5 TenneT DE Konventionell positive 225 1,688 23:March-06:March
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 250 1,625 08:March-15:March
KMW_KW3 Amprion Konventionell positive 230 1,613 23:March-06:March
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 200 1,300 08:March-15:March
WEISWEILER_VGTG3 Amprion Konventionell positive 182 1,183 14:March-21:March
WEISWEILER_H Amprion Konventionell negative 189 1,135 09:March-15:March
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 214 1,070 07:March-12:March
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 162 1,050 08:March-15:March
Jänschwalde (Standort) 50Hertz Konventionell negative 241 1,026 06:March-13:March
NIEDERAUSSEM_K Amprion Konventionell negative 232 930 09:March-13:March
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 150 900 09:March-15:March
Emsland Block D Amprion Konventionell positive 174 698 07:March-11:March
GUD_HERNE_6 Amprion Konventionell positive 336 672 08:March-10:March
LAUSWARD_GUDF Amprion Konventionell positive 302 603 07:March-09:March
NIEDERAUSSEM_H Amprion Konventionell negative 100 602 09:March-15:March
illwerke vkw AG TransnetBW Sonstiges positive 111 582 06:March-13:March
Lippendorf 50Hertz Konventionell negative 153 575 05:March-09:March
WEISWEILER_G Amprion Konventionell negative 147 550 09:March-13:March
Boxberg (Standort) 50Hertz Konventionell negative 273 546 08:March-10:March
WEISWEILER_G Amprion Konventionell negative 121 512 09:March-14:March
50H Berlin Mitte 50Hertz Konventionell negative 128 510 05:March-09:March
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 82 492 15:March-21:March
ReserveKW Plattling TenneT DE Konventionell positive 49 490 23:March-09:March
Linden GKL GT 1 TenneT DE Konventionell positive 61 488 06:March-14:March
ReserveKW Plattling TenneT DE Konventionell positive 42 416 13:March-23:March
Börse TenneT DE Sonstiges negative 42 416 13:March-23:March
Schkopau 50Hertz Konventionell negative 162 406 06:March-09:March
Lippendorf 50Hertz Konventionell negative 195 390 07:March-09:March
Börse TransnetBW Sonstiges negative 183 367 10:March-23:March
50H PV Bartow 50Hertz Erneuerbar negative 86 346 11:March-15:March
Frankfurt West 4 TenneT DE Konventionell positive 58 345 09:March-15:March
50H PV Witznitz 50Hertz Erneuerbar negative 271 338 09:March-11:March
Rostock Kohlekraftwerk 50Hertz Konventionell negative 123 307 07:March-09:March
50H Berlin Marzahn 50Hertz Konventionell negative 61 303 06:March-14:March
WALSUM_10 Amprion Konventionell negative 190 286 12:March-14:March
KMW_KW3 Amprion Konventionell positive 220 276 21:March-23:March
Schkopau 50Hertz Konventionell negative 106 212 07:March-09:March
Audorf TenneT DE Konventionell positive 50 188 07:March-11:March
Börse Amprion Konventionell positive 28 170 15:March-21:March
Jänschwalde (Standort) 50Hertz Konventionell negative 56 153 11:March-15:March
50H Hamburg Tiefstack 2 HKW SK 50Hertz Konventionell positive 91 136 08:March-10:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 102 102 10:March-11:March
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 47 94 23:March-01:March

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.26M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-03-23?

On 2026-03-23, estimated redispatch costs were approximately €0.87 million. This includes €0.29M for renewable curtailment compensation and €0.51M for conventional ramp-up costs.

Which power plants were most affected on 2026-03-23?

The most affected plant was Emsland Block D (Amprion) with 4,469 MWh of positive redispatch.

What was the electricity spot price on 2026-03-23?

The EPEX Day-Ahead spot price for DE_LU ranged from 32 to 296 €/MWh with an average of 138 €/MWh.