2,603MWh Curtailed
1,749MWh Ramped Up
€0.58MEst. Cost
168 MWPeak Positive

Day-Ahead Spot: -13-185 €/MWh (avg 85)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 9 10,584
TenneT DE positive 1 1,024
50Hertz negative 9 685
50Hertz positive 2 37

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 400 2,400 09:March-15:March
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 350 2,100 09:March-15:March
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 310 1,858 09:March-15:March
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 300 1,800 09:March-15:March
BAG NWAK-Cluster 14 Schwandorf TenneT DE Erneuerbar negative 200 1,200 09:March-15:March
Niederrad 1 TenneT DE Konventionell positive 43 1,024 23:March-23:March
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 36 572 23:March-23:March
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 151 568 08:March-12:March
UW Dörpen-West TenneT DE Erneuerbar negative 34 263 07:March-14:March
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 242 242 13:March-14:March
UW Büttel TenneT DE Erneuerbar negative 149 149 13:March-14:March
50H PV Witznitz 50Hertz Erneuerbar negative 36 36 14:March-15:March
50H BASF Schwarzheide 50Hertz Konventionell negative 15 30 00:March-02:March
Börse 50Hertz Sonstiges positive 15 30 00:March-02:March
50H UW Schönewalde 50Hertz Erneuerbar negative 20 20 14:March-15:March
Börse 50Hertz Sonstiges negative 44 11 07:March-07:March
Boxberg (Standort) 50Hertz Konventionell negative 31 8 06:March-07:March
50H OWP Arkona 50Hertz Erneuerbar negative 8 8 14:March-15:March
Börse 50Hertz Sonstiges positive 26 7 05:March-05:March
50H UW Putlitz 50Hertz Erneuerbar negative 3 3 14:March-15:March
Börse 50Hertz Sonstiges negative 5 1 10:March-10:March

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.17M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-03-22?

On 2026-03-22, estimated redispatch costs were approximately €0.58 million. This includes €0.26M for renewable curtailment compensation and €0.2M for conventional ramp-up costs.

Which power plants were most affected on 2026-03-22?

The most affected plant was BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt (TenneT DE) with 2,400 MWh of negative redispatch.

What was the electricity spot price on 2026-03-22?

The EPEX Day-Ahead spot price for DE_LU ranged from -13 to 185 €/MWh with an average of 85 €/MWh.