2,603MWh Curtailed
1,749MWh Ramped Up
€0.58MEst. Cost
168 MWPeak Positive
Day-Ahead Spot: -13-185 €/MWh (avg 85)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 9 | 10,584 |
| TenneT DE | positive | 1 | 1,024 |
| 50Hertz | negative | 9 | 685 |
| 50Hertz | positive | 2 | 37 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt | TenneT DE | negative | 400 | 2,400 | 09:March-15:March | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 350 | 2,100 | 09:March-15:March | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 310 | 1,858 | 09:March-15:March | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 300 | 1,800 | 09:March-15:March | |
| BAG NWAK-Cluster 14 Schwandorf | TenneT DE | negative | 200 | 1,200 | 09:March-15:March | |
| Niederrad 1 | TenneT DE | Konventionell | positive | 43 | 1,024 | 23:March-23:March |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 36 | 572 | 23:March-23:March |
| 50H_EDIS_CR_WU | 50Hertz | negative | 151 | 568 | 08:March-12:March | |
| UW Dörpen-West | TenneT DE | negative | 34 | 263 | 07:March-14:March | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 242 | 242 | 13:March-14:March | |
| UW Büttel | TenneT DE | negative | 149 | 149 | 13:March-14:March | |
| 50H PV Witznitz | 50Hertz | negative | 36 | 36 | 14:March-15:March | |
| 50H BASF Schwarzheide | 50Hertz | Konventionell | negative | 15 | 30 | 00:March-02:March |
| Börse | 50Hertz | Sonstiges | positive | 15 | 30 | 00:March-02:March |
| 50H UW Schönewalde | 50Hertz | negative | 20 | 20 | 14:March-15:March | |
| Börse | 50Hertz | Sonstiges | negative | 44 | 11 | 07:March-07:March |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 31 | 8 | 06:March-07:March |
| 50H OWP Arkona | 50Hertz | negative | 8 | 8 | 14:March-15:March | |
| Börse | 50Hertz | Sonstiges | positive | 26 | 7 | 05:March-05:March |
| 50H UW Putlitz | 50Hertz | negative | 3 | 3 | 14:March-15:March | |
| Börse | 50Hertz | Sonstiges | negative | 5 | 1 | 10:March-10:March |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.17M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-03-22?
On 2026-03-22, estimated redispatch costs were approximately €0.58 million. This includes €0.26M for renewable curtailment compensation and €0.2M for conventional ramp-up costs.
Which power plants were most affected on 2026-03-22?
The most affected plant was BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt (TenneT DE) with 2,400 MWh of negative redispatch.
What was the electricity spot price on 2026-03-22?
The EPEX Day-Ahead spot price for DE_LU ranged from -13 to 185 €/MWh with an average of 85 €/MWh.