2,262MWh Curtailed
2,304MWh Ramped Up
€0.62MEst. Cost
211 MWPeak Positive

Day-Ahead Spot: 32-236 €/MWh (avg 106)

TSO Breakdown

TSODirectionMeasuresTotal MWh
50Hertz negative 35 10,400
Amprion positive 15 5,716
TenneT DE positive 6 2,110
TransnetBW positive 2 317
Amprion negative 1 296
50Hertz positive 6 178
TenneT DE negative 1 144
TransnetBW negative 1 26

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 237 1,184 08:March-13:March
Emsland Block D Amprion Konventionell positive 419 1,047 07:March-10:March
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 275 961 08:March-12:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 231 750 03:March-10:March
Knapsack 1 Amprion Konventionell positive 359 718 08:March-10:March
Lippendorf 50Hertz Konventionell negative 234 703 07:March-10:March
Emsland Block C Amprion Konventionell positive 277 694 07:March-10:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 111 667 05:March-11:March
50H_WEMA_CR_GOE 50Hertz Erneuerbar negative 118 650 08:March-14:March
50H_AVA_CR_STW 50Hertz Erneuerbar negative 183 594 08:March-12:March
Emsland Block D Amprion Konventionell positive 196 589 08:March-11:March
50H Berlin Marzahn 50Hertz Konventionell negative 89 534 04:March-11:March
50H Berlin Mitte 50Hertz Konventionell negative 62 528 03:March-12:March
Emsland Block B Amprion Konventionell positive 116 524 03:March-07:March
Boxberg (Standort) 50Hertz Konventionell negative 250 500 07:March-09:March
STUMMHAFEN_10 Amprion Konventionell positive 166 497 09:March-12:March
Linden GKL GT 3 TenneT DE Konventionell positive 58 495 03:March-12:March
Rostock Kohlekraftwerk 50Hertz Konventionell negative 65 454 05:March-12:March
50H PV Witznitz 50Hertz Erneuerbar negative 166 415 10:March-12:March
LAUSWARD_GUDF Amprion Konventionell positive 177 399 07:March-09:March
50H Berlin Lichterfelde 50Hertz Konventionell negative 59 355 06:March-12:March
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 89 333 10:March-13:March
Lippendorf 50Hertz Konventionell negative 220 330 08:March-10:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 306 306 09:March-10:March
illwerke vkw AG TransnetBW Sonstiges positive 172 302 06:March-08:March
WALSUM_10 Amprion Konventionell positive 132 296 08:March-11:March
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 42 296 07:March-14:March
Börse Amprion Konventionell negative 42 296 07:March-14:March
50H OWP Arkona 50Hertz Erneuerbar negative 96 289 10:March-13:March
NIEHL-31-GUD Amprion Konventionell positive 255 255 09:March-10:March
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 161 242 09:March-11:March
50H Berlin Mitte 50Hertz Konventionell negative 48 227 04:March-11:March
Jänschwalde (Standort) 50Hertz Konventionell negative 111 222 08:March-10:March
50H PV Bartow 50Hertz Erneuerbar negative 66 216 09:March-12:March
50H OWP Wikinger 50Hertz Erneuerbar negative 65 212 10:March-13:March
50H_EDIS_CR_PE 50Hertz Erneuerbar negative 141 212 09:March-11:March
HAMMUENTROP_20 Amprion Konventionell positive 145 145 04:March-05:March
Börse TenneT DE Sonstiges negative 144 144 03:March-10:March
Lippendorf 50Hertz Konventionell negative 66 133 08:March-10:March
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 99 124 10:March-11:March
Linden GKL GT 1 TenneT DE Konventionell positive 29 121 07:March-12:March
GUD_HERNE_6 Amprion Konventionell positive 116 116 09:March-10:March
Hannover (GKH) 2 TenneT DE Konventionell positive 30 112 08:March-12:March
Audorf TenneT DE Konventionell positive 50 100 09:March-11:March
Linden GKL DT TenneT DE Konventionell positive 28 98 07:March-11:March
WALSUM_10 Amprion Konventionell positive 128 96 09:March-10:March
50H Hamburg Tiefstack 2 HKW SK 50Hertz Konventionell positive 85 85 09:March-10:March
50H Rostock Marienehe 50Hertz Konventionell negative 40 80 09:March-11:March
Boxberg (Standort) 50Hertz Konventionell negative 75 75 10:March-11:March
50H InfraLeuna IKW 50Hertz Konventionell negative 23 69 09:March-12:March

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.19M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-03-03?

On 2026-03-03, estimated redispatch costs were approximately €0.62 million. This includes €0.23M for renewable curtailment compensation and €0.31M for conventional ramp-up costs.

Which power plants were most affected on 2026-03-03?

The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 1,184 MWh of positive redispatch.

What was the electricity spot price on 2026-03-03?

The EPEX Day-Ahead spot price for DE_LU ranged from 32 to 236 €/MWh with an average of 106 €/MWh.