← 2026-03-03

Wednesday, March 4, 2026

2026-03-05 →
2,610MWh Curtailed
3,151MWh Ramped Up
€0.86MEst. Cost
405 MWPeak Positive

Day-Ahead Spot: 40-283 €/MWh (avg 133)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE positive 12 16,002
TenneT DE negative 3 10,136
50Hertz negative 30 9,920
Amprion positive 10 5,468
TransnetBW positive 4 630
50Hertz positive 6 349
Amprion negative 2 321
TransnetBW negative 1 0

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
ReserveKW Zolling 5 TenneT DE Konventionell positive 379 9,088 23:March-23:March
Börse TenneT DE Sonstiges negative 338 6,091 23:March-23:March
ReserveKW Zolling 5 TenneT DE Konventionell positive 355 5,952 03:March-23:March
Börse TenneT DE Sonstiges negative 354 3,987 03:March-23:March
Emsland Block B Amprion Konventionell positive 214 1,444 05:March-12:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 436 1,309 08:March-11:March
Emsland Block D Amprion Konventionell positive 302 908 08:March-11:March
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 128 797 09:March-15:March
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 211 738 09:March-13:March
WALSUM_10 Amprion Konventionell positive 169 633 09:March-13:March
KMW_KW3 Amprion Konventionell positive 310 621 08:March-10:March
Lippendorf 50Hertz Konventionell negative 300 600 07:March-09:March
50H OWP Wikinger 50Hertz Erneuerbar negative 139 554 10:March-14:March
Jänschwalde (Standort) 50Hertz Konventionell negative 184 551 08:March-11:March
50H PV Bartow 50Hertz Erneuerbar negative 129 548 09:March-14:March
Schkopau 50Hertz Konventionell negative 274 548 08:March-10:March
Boxberg (Standort) 50Hertz Konventionell negative 252 503 09:March-11:March
Emsland Block D Amprion Konventionell positive 292 438 07:March-09:March
illwerke vkw AG TransnetBW Sonstiges positive 204 409 07:March-09:March
GUD_HERNE_6 Amprion Konventionell positive 324 405 09:March-10:March
50H Berlin Marzahn 50Hertz Konventionell negative 80 402 06:March-11:March
50H_AVA_CR_STW 50Hertz Erneuerbar negative 154 384 09:March-12:March
Braunschweig HKWM GT31 TenneT DE Konventionell positive 55 355 08:March-15:March
50H Berlin Lichterfelde 50Hertz Konventionell negative 58 348 06:March-12:March
Boxberg (Standort) 50Hertz Konventionell negative 135 338 06:March-10:March
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 95 310 10:March-14:March
50H Berlin Mitte 50Hertz Konventionell negative 53 305 05:March-11:March
NIEHL-31-GUD Amprion Konventionell positive 152 304 09:March-11:March
50H Berlin Mitte 50Hertz Konventionell negative 75 300 07:March-11:March
Börse Amprion Konventionell negative 42 296 07:March-14:March
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 42 296 07:March-14:March
STUMMHAFEN_10 Amprion Konventionell positive 280 280 10:March-11:March
Linden GKL GT 1 TenneT DE Konventionell positive 62 247 07:March-11:March
Rostock Kohlekraftwerk 50Hertz Konventionell negative 98 220 07:March-10:March
50H PV Witznitz 50Hertz Erneuerbar negative 119 208 09:March-12:March
50H OWP Arkona 50Hertz Erneuerbar negative 67 202 10:March-13:March
Jänschwalde (Standort) 50Hertz Konventionell negative 51 179 06:March-11:March
Reservekraftwerk Marbach GT 3 TransnetBW Konventionell positive 85 170 07:March-09:March
50H UW Bertikow 50Hertz Erneuerbar negative 28 167 07:March-15:March
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 119 149 10:March-11:March
KMW_KW5 Amprion Konventionell positive 69 139 08:March-10:March
50H Berlin Reuter West 50Hertz Konventionell positive 46 115 06:March-09:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 47 106 08:March-14:March
50H Hamburg Tiefstack 2 HKW SK 50Hertz Konventionell positive 92 92 10:March-11:March
Linden GKL DT TenneT DE Konventionell positive 25 86 07:March-11:March
50H InfraLeuna IKW 50Hertz Konventionell negative 23 69 09:March-12:March
50H PV Witznitz 50Hertz Erneuerbar negative 20 61 10:March-13:March
Börse TenneT DE Sonstiges negative 228 57 11:March-11:March
50H Berlin Marzahn 50Hertz Konventionell negative 28 55 06:March-09:March
Linden GKL GT 3 TenneT DE Konventionell positive 21 52 08:March-11:March

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.26M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-03-04?

On 2026-03-04, estimated redispatch costs were approximately €0.86 million. This includes €0.26M for renewable curtailment compensation and €0.51M for conventional ramp-up costs.

Which power plants were most affected on 2026-03-04?

The most affected plant was ReserveKW Zolling 5 (TenneT DE) with 9,088 MWh of positive redispatch.

What was the electricity spot price on 2026-03-04?

The EPEX Day-Ahead spot price for DE_LU ranged from 40 to 283 €/MWh with an average of 133 €/MWh.