← 2026-03-01

Monday, March 2, 2026

2026-03-03 →
2,382MWh Curtailed
1,874MWh Ramped Up
€0.52MEst. Cost
235 MWPeak Positive

Day-Ahead Spot: 49-150 €/MWh (avg 94)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE positive 7 9,008
50Hertz positive 6 1,466
50Hertz negative 5 626
TransnetBW positive 3 498
TransnetBW negative 1 287
TenneT DE negative 2 230
Amprion positive 3 188
Amprion negative 1 161

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 424 5,092 23:March-21:March
ReserveKW Ingolstadt 4 TenneT DE Konventionell positive 132 1,320 11:March-21:March
ReserveKW Ingolstadt 3 TenneT DE Konventionell positive 139 1,250 13:March-22:March
Boxberg (Standort) 50Hertz Konventionell positive 167 666 11:March-15:March
Lippendorf 50Hertz Konventionell positive 177 532 08:March-11:March
Linden GKL DT TenneT DE Konventionell positive 62 484 12:March-20:March
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 100 324 00:March-03:March
Linden GKL GT 3 TenneT DE Konventionell positive 37 289 12:March-20:March
Börse TransnetBW Sonstiges negative 52 287 03:March-22:March
ReserveKW Ingolstadt 3 TenneT DE Konventionell positive 77 250 18:March-21:March
illwerke vkw AG TransnetBW Sonstiges positive 165 247 19:March-21:March
50H Erfurt-Ost HKW GuD 50Hertz Konventionell negative 31 219 01:March-22:March
Börse TenneT DE Sonstiges negative 171 171 10:March-11:March
Börse TransnetBW Sonstiges positive 36 169 03:March-20:March
HAMMUENTROP_20 Amprion Konventionell negative 80 161 18:March-21:March
50H Berlin Lichterfelde 50Hertz Konventionell negative 39 156 08:March-15:March
50H InfraLeuna IKW 50Hertz Konventionell negative 26 154 02:March-14:March
Schkopau 50Hertz Konventionell positive 109 109 04:March-05:March
Boxberg (Standort) 50Hertz Konventionell positive 98 98 00:March-01:March
WALSUM_10 Amprion Konventionell positive 87 87 15:March-16:March
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 66 82 19:March-21:March
50H Rostock Marienehe 50Hertz Konventionell negative 38 76 11:March-13:March
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 34 59 08:March-09:March
WALSUM_10 Amprion Konventionell positive 52 52 16:March-17:March
Jänschwalde (Standort) 50Hertz Konventionell positive 51 51 09:March-10:March
KMW_KW5 Amprion Konventionell positive 49 49 05:March-06:March
50H Halle-Trotha HKW 50Hertz Konventionell negative 21 21 09:March-10:March
50H Berlin Lichterfelde 50Hertz Konventionell positive 10 10 05:March-06:March

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.16M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-03-02?

On 2026-03-02, estimated redispatch costs were approximately €0.52 million. This includes €0.24M for renewable curtailment compensation and €0.23M for conventional ramp-up costs.

Which power plants were most affected on 2026-03-02?

The most affected plant was Börse (TenneT DE) with 5,092 MWh of positive redispatch.

What was the electricity spot price on 2026-03-02?

The EPEX Day-Ahead spot price for DE_LU ranged from 49 to 150 €/MWh with an average of 94 €/MWh.