2,972MWh Curtailed
2,868MWh Ramped Up
€0.9MEst. Cost
183 MWPeak Positive
Day-Ahead Spot: 98-359 €/MWh (avg 156)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| Amprion | negative | 21 | 18,283 |
| Amprion | positive | 6 | 9,687 |
| TransnetBW | positive | 15 | 9,398 |
| TenneT DE | negative | 4 | 6,214 |
| TenneT DE | positive | 4 | 1,409 |
| 50Hertz | negative | 3 | 682 |
| TransnetBW | negative | 2 | 240 |
| 50Hertz | positive | 1 | 35 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 377 | 5,272 | 23:January-23:January |
| Netzreservekraftwerk Weiher C | Amprion | Konventionell | positive | 323 | 3,960 | 10:January-22:January |
| Netzreservekraftwerk Weiher C | Amprion | Konventionell | positive | 277 | 3,670 | 23:January-20:January |
| NEURATH_F | Amprion | Konventionell | negative | 343 | 3,085 | 23:January-08:January |
| KNAPSACK_20 | Amprion | Konventionell | negative | 328 | 1,970 | 17:January-23:January |
| NIEHL-31-GUD | Amprion | Konventionell | negative | 212 | 1,962 | 23:January-08:January |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 | TransnetBW | Konventionell | positive | 197 | 1,924 | 23:January-16:January |
| Grosskraftwerk Mannheim Block 8 | TransnetBW | Konventionell | positive | 178 | 1,784 | 13:January-23:January |
| WALSUM_10 | Amprion | Konventionell | negative | 117 | 1,632 | 23:January-15:January |
| HAMMUENTROP_20 | Amprion | Konventionell | negative | 164 | 1,600 | 23:January-12:January |
| HAMMUENTROP_10 | Amprion | Konventionell | negative | 159 | 1,466 | 23:January-14:January |
| Irsching 5 | TenneT DE | Konventionell | positive | 217 | 1,248 | 23:January-05:January |
| WEISWEILER_G | Amprion | Konventionell | negative | 176 | 1,233 | 23:January-06:January |
| Grosskraftwerk Mannheim Block 8 | TransnetBW | Konventionell | positive | 152 | 1,220 | 23:January-23:January |
| Netzreservekraftwerk Weiher C | Amprion | Konventionell | positive | 300 | 1,201 | 19:January-23:January |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 | TransnetBW | Konventionell | positive | 209 | 1,045 | 18:January-23:January |
| NIEHL-31-GUD | Amprion | Konventionell | negative | 154 | 1,002 | 05:January-20:January |
| Knapsack 1 | Amprion | Konventionell | negative | 245 | 980 | 19:January-23:January |
| NIEHL-31-GUD | Amprion | Konventionell | negative | 238 | 953 | 19:January-23:January |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 | TransnetBW | Konventionell | positive | 135 | 942 | 12:January-22:January |
| Irsching 5 | TenneT DE | Konventionell | negative | 218 | 925 | 09:January-14:January |
| NEURATH_F | Amprion | Konventionell | negative | 215 | 645 | 19:January-22:January |
| Kraftwerk Walheim GT D | TransnetBW | Konventionell | positive | 110 | 632 | 05:January-17:January |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 139 | 628 | 09:January-14:January |
| Lippendorf | 50Hertz | Konventionell | negative | 300 | 600 | 11:January-13:January |
| NIEHL-II | Amprion | Konventionell | negative | 117 | 469 | 19:January-23:January |
| HAMMUENTROP_10 | Amprion | Konventionell | negative | 124 | 434 | 16:January-23:January |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 129 | 356 | 06:January-14:January |
| Emsland Block D | Amprion | Konventionell | negative | 321 | 321 | 21:January-22:January |
| Börse | Amprion | Konventionell | positive | 75 | 319 | 06:January-18:January |
| NEURATH_F | Amprion | Konventionell | positive | 90 | 270 | 19:January-22:January |
| Netzreservekraftwerk GTKW-DA-POOL | Amprion | Konventionell | positive | 89 | 267 | 06:January-09:January |
| Kraftwerk Walheim GT D | TransnetBW | Konventionell | positive | 125 | 250 | 11:January-13:January |
| NIEHL-II | Amprion | Konventionell | negative | 91 | 182 | 13:January-22:January |
| Börse | TransnetBW | Sonstiges | negative | 58 | 174 | 23:January-13:January |
| Heizkraftwerk Altbach/Deizisau GT C | TransnetBW | Konventionell | positive | 85 | 170 | 11:January-13:January |
| Heizkraftwerk Altbach/Deizisau GT B | TransnetBW | Konventionell | positive | 50 | 150 | 06:January-16:January |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 | TransnetBW | Konventionell | positive | 70 | 140 | 21:January-23:January |
| SW München KW-Pool | TenneT DE | Sonstiges | positive | 33 | 115 | 10:January-13:January |
| Reservekraftwerk Marbach GT 3 | TransnetBW | Konventionell | positive | 72 | 108 | 05:January-07:January |
| Knapsack 1 | Amprion | Konventionell | negative | 75 | 94 | 23:January-00:January |
| GUD_HERNE_6 | Amprion | Konventionell | negative | 78 | 78 | 13:January-22:January |
| NIEHL-31-GUD | Amprion | Konventionell | negative | 72 | 72 | 17:January-18:January |
| Börse | TransnetBW | Sonstiges | negative | 44 | 66 | 16:January-22:January |
| Emsland Block C | Amprion | Konventionell | negative | 223 | 56 | 19:January-19:January |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 14 | 52 | 13:January-17:January |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 20 | 50 | 10:January-13:January |
| 50H InfraLeuna IKW | 50Hertz | Konventionell | positive | 35 | 35 | 21:January-22:January |
| 50H UW Bertikow | 50Hertz | negative | 30 | 30 | 10:January-11:January | |
| GUD_HERNE_6 | Amprion | Konventionell | negative | 15 | 30 | 21:January-23:January |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.27M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-01-20?
On 2026-01-20, estimated redispatch costs were approximately €0.9 million. This includes €0.3M for renewable curtailment compensation and €0.53M for conventional ramp-up costs.
Which power plants were most affected on 2026-01-20?
The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 5,272 MWh of negative redispatch.
What was the electricity spot price on 2026-01-20?
The EPEX Day-Ahead spot price for DE_LU ranged from 98 to 359 €/MWh with an average of 156 €/MWh.