← 2026-01-18

Monday, January 19, 2026

2026-01-20 →
3,192MWh Curtailed
3,294MWh Ramped Up
€1.05MEst. Cost
205 MWPeak Positive

Day-Ahead Spot: 98-218 €/MWh (avg 141)

TSO Breakdown

TSODirectionMeasuresTotal MWh
Amprion positive 7 13,786
Amprion negative 9 13,144
TransnetBW positive 12 7,822
50Hertz negative 21 5,444
TenneT DE negative 3 954
50Hertz positive 1 26
TransnetBW negative 1 11

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse Amprion Konventionell negative 377 9,059 23:January-23:January
Netzreservekraftwerk BERGKAMEN_A Amprion Konventionell positive 376 9,026 23:January-23:January
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 388 2,428 14:January-20:January
Netzreservekraftwerk HERNE_4 Amprion Konventionell positive 201 2,014 11:January-21:January
Börse Amprion Konventionell negative 201 2,014 11:January-21:January
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 220 1,980 05:January-14:January
HAMMUENTROP_20 Amprion Konventionell negative 160 1,443 05:January-14:January
Netzreservekraftwerk HERNE_4 Amprion Konventionell positive 232 1,161 07:January-12:January
illwerke vkw AG TransnetBW Sonstiges positive 377 1,130 09:January-12:January
50H Berlin Mitte 50Hertz Konventionell negative 77 923 07:January-19:January
Netzreservekraftwerk HERNE_4 Amprion Konventionell positive 98 835 05:January-14:January
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 169 675 09:January-13:January
Netzreservekraftwerk HERNE_4 Amprion Konventionell positive 150 600 15:January-19:January
Boxberg (Standort) 50Hertz Konventionell negative 147 588 09:January-13:January
Schkopau 50Hertz Konventionell negative 169 548 09:January-14:January
Irsching 5 TenneT DE Konventionell negative 153 498 08:January-11:January
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 163 490 09:January-12:January
50H Berlin Lichterfelde 50Hertz Konventionell negative 74 442 05:January-11:January
Irsching 5 TenneT DE Konventionell negative 124 402 09:January-12:January
50H Berlin Lichterfelde 50Hertz Konventionell negative 66 398 07:January-13:January
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 103 385 11:January-14:January
Kraftwerk Walheim GT D TransnetBW Konventionell positive 120 301 10:January-13:January
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 86 300 08:January-12:January
50H UW Bertikow 50Hertz Erneuerbar negative 107 294 10:January-13:January
Reservekraftwerk Marbach GT 3 TransnetBW Konventionell positive 85 255 09:January-12:January
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 125 218 10:January-12:January
Datteln_4 Amprion Konventionell negative 168 210 19:January-20:January
Jänschwalde (Standort) 50Hertz Konventionell negative 100 200 05:January-07:January
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 98 196 05:January-07:January
Heizkraftwerk Altbach/Deizisau GT E TransnetBW Konventionell positive 65 195 09:January-12:January
50H Berlin Lichterfelde 50Hertz Konventionell negative 67 185 12:January-14:January
Heizkraftwerk Altbach/Deizisau GT C TransnetBW Konventionell positive 72 179 10:January-13:January
Jänschwalde (Standort) 50Hertz Konventionell negative 45 169 07:January-11:January
50H Berlin Marzahn 50Hertz Konventionell negative 30 148 12:January-17:January
HAMMUENTROP_20 Amprion Konventionell negative 78 118 14:January-19:January
Emsland Block C Amprion Konventionell positive 110 110 10:January-11:January
Schkopau 50Hertz Konventionell negative 50 100 05:January-07:January
Börse Amprion Konventionell negative 100 100 14:January-19:January
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 92 92 12:January-13:January
Börse TransnetBW Sonstiges positive 29 87 05:January-15:January
HAMMUENTROP_10 Amprion Konventionell negative 85 85 14:January-15:January
STUMMHAFEN_10 Amprion Konventionell negative 85 85 14:January-15:January
50H OWP Wikinger 50Hertz Erneuerbar negative 63 79 10:January-12:January
50H Leipzig Süd GuD 50Hertz Konventionell negative 30 60 09:January-11:January
50H PV Witznitz 50Hertz Erneuerbar negative 59 59 11:January-12:January
Eltmann TenneT DE Konventionell negative 27 54 09:January-11:January
50H Berlin Mitte 50Hertz Konventionell negative 50 50 13:January-14:January
50H Halle-Trotha HKW 50Hertz Konventionell negative 23 46 09:January-11:January
50H Leipzig Nord GuD 50Hertz Konventionell negative 21 42 09:January-11:January
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 10 40 12:January-16:January

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.32M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-01-19?

On 2026-01-19, estimated redispatch costs were approximately €1.05 million. This includes €0.32M for renewable curtailment compensation and €0.56M for conventional ramp-up costs.

Which power plants were most affected on 2026-01-19?

The most affected plant was Börse (Amprion) with 9,059 MWh of negative redispatch.

What was the electricity spot price on 2026-01-19?

The EPEX Day-Ahead spot price for DE_LU ranged from 98 to 218 €/MWh with an average of 141 €/MWh.