← 2026-06-07

Monday, June 8, 2026

2026-06-09 →
2,836MWh Curtailed
3,147MWh Ramped Up
€0.94MEst. Cost
216 MWPeak Positive

Day-Ahead Spot: 44-227 €/MWh (avg 123)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 11 18,834
50Hertz negative 36 16,320
Amprion positive 11 12,933
TenneT DE positive 8 8,718
Amprion negative 8 4,979
TransnetBW positive 7 1,342

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 450 4,050 07:June-16:June
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 400 3,600 07:June-16:June
Irsching 4 TenneT DE Konventionell positive 323 2,742 06:June-15:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 302 2,714 05:June-19:June
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 300 2,700 07:June-16:June
BAG NWAK-Cluster 12 Pirach-Simbach TenneT DE Erneuerbar negative 280 2,520 07:June-16:June
Emsland Block B Amprion Konventionell positive 188 2,490 07:June-20:June
50H PV Witznitz 50Hertz Erneuerbar negative 328 2,376 06:June-14:June
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 327 2,043 07:June-13:June
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 328 1,969 08:June-14:June
50H_AVA_CR_STW 50Hertz Erneuerbar negative 339 1,863 08:June-13:June
Hannover-Linden GuD TenneT DE Konventionell positive 130 1,821 05:June-19:June
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 251 1,820 05:June-13:June
BAG NWAK-Cluster 14 Schwandorf TenneT DE Erneuerbar negative 200 1,800 07:June-16:June
Börse TenneT DE Sonstiges negative 294 1,766 08:June-14:June
Emsland Block C Amprion Konventionell positive 225 1,686 02:June-10:June
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 260 1,624 08:June-15:June
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 164 1,475 07:June-16:June
Emsland Block C Amprion Konventionell positive 193 1,446 09:June-16:June
NIEDERAUSSEM_K Amprion Konventionell negative 231 1,329 06:June-16:June
NEURATH_F Amprion Konventionell negative 177 1,287 09:June-16:June
WEISWEILER_G Amprion Konventionell positive 227 1,136 09:June-14:June
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 166 1,035 07:June-13:June
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 132 987 06:June-14:June
HAMMUENTROP_20 Amprion Konventionell positive 391 978 06:June-09:June
WEISWEILER_G Amprion Konventionell negative 259 778 16:June-19:June
Boxberg (Standort) 50Hertz Konventionell negative 154 771 06:June-15:June
50H PV Bartow 50Hertz Erneuerbar negative 99 721 06:June-14:June
WALSUM_10 Amprion Konventionell positive 190 665 07:June-11:June
illwerke vkw AG TransnetBW Sonstiges positive 228 570 16:June-20:June
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 138 553 08:June-12:June
WALSUM_10 Amprion Konventionell negative 137 548 16:June-20:June
50H Berlin Marzahn 50Hertz Konventionell negative 72 506 05:June-16:June
Boxberg (Standort) 50Hertz Konventionell negative 49 492 05:June-16:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 56 464 05:June-16:June
Datteln_4 Amprion Konventionell negative 148 444 11:June-14:June
50H_EDIS_CR_PE 50Hertz Erneuerbar negative 88 440 09:June-14:June
LAUSWARD_GUDF Amprion Konventionell positive 246 430 06:June-08:June
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 106 425 10:June-14:June
HERDECKE_H6 Amprion Konventionell negative 132 395 17:June-20:June
Irsching 4 TenneT DE Konventionell negative 96 382 02:June-06:June
BAG NWAK-Cluster 04 Aschaffenburg TenneT DE Erneuerbar negative 40 360 07:June-16:June
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 175 350 07:June-12:June
Frankfurt West 4 TenneT DE Konventionell positive 69 345 08:June-13:June
Irsching 4 TenneT DE Konventionell positive 107 322 06:June-14:June
Datteln_4 Amprion Konventionell positive 102 308 08:June-11:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 304 304 06:June-07:June
Lippendorf 50Hertz Konventionell negative 60 242 05:June-15:June
Itzehoe TenneT DE Konventionell positive 78 232 07:June-10:June
Frankfurt West 4 TenneT DE Konventionell positive 56 225 05:June-09:June

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.28M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-06-08?

On 2026-06-08, estimated redispatch costs were approximately €0.94 million. This includes €0.28M for renewable curtailment compensation and €0.48M for conventional ramp-up costs.

Which power plants were most affected on 2026-06-08?

The most affected plant was BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt (TenneT DE) with 4,050 MWh of negative redispatch.

What was the electricity spot price on 2026-06-08?

The EPEX Day-Ahead spot price for DE_LU ranged from 44 to 227 €/MWh with an average of 123 €/MWh.