2,322MWh Curtailed
2,081MWh Ramped Up
€0.64MEst. Cost
163 MWPeak Positive

Day-Ahead Spot: 0-163 €/MWh (avg 96)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 29 23,355
TenneT DE positive 12 20,444
TransnetBW positive 22 15,690
50Hertz negative 43 13,898
Amprion positive 6 6,019
Amprion negative 6 1,501
50Hertz positive 7 1,310
TransnetBW negative 2 339

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 820 13,128 23:June-15:June
UW Dörpen-West TenneT DE Erneuerbar negative 592 4,590 07:June-16:June
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 319 4,463 05:June-19:June
Knapsack 1 Amprion Konventionell positive 531 3,986 22:June-05:June
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 293 3,810 22:June-11:June
UW Büttel TenneT DE Erneuerbar negative 218 3,052 02:June-20:June
SHN Cluster Kiel Süd TenneT DE Erneuerbar negative 116 2,782 22:June-22:June
Börse TenneT DE Sonstiges positive 870 2,610 05:June-16:June
Hannover-Linden GuD TenneT DE Konventionell positive 168 2,516 22:June-13:June
UW Büttel TenneT DE Erneuerbar negative 357 1,962 09:June-15:June
Pumpspeicherwerk Wehr RZ TNG TransnetBW Sonstiges positive 406 1,625 09:June-13:June
50H_EDIS_CR_NHG_Nord 50Hertz Erneuerbar negative 328 1,396 11:June-15:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 252 1,258 08:June-19:June
SHN Cluster Heide West T411 T412 TenneT DE Erneuerbar negative 163 1,141 09:June-16:June
SHN Cluster Handewitt T414 T415 TenneT DE Erneuerbar negative 113 1,100 10:June-20:June
Börse Amprion Konventionell positive 700 1,050 19:June-21:June
illwerke vkw AG TransnetBW Sonstiges positive 400 1,000 09:June-13:June
illwerke vkw AG TransnetBW Sonstiges positive 172 988 03:June-17:June
SHN Cluster Kiel Süd TenneT DE Erneuerbar negative 165 950 10:June-16:June
UW Diele TenneT DE Erneuerbar negative 230 920 09:June-16:June
UW Diele TenneT DE Erneuerbar negative 400 900 11:June-14:June
50H_EDIS_CR_EH 50Hertz Erneuerbar negative 137 854 09:June-15:June
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 197 838 10:June-15:June
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 115 802 11:June-20:June
Schkopau 50Hertz Konventionell positive 146 801 23:June-05:June
Irsching 4 TenneT DE Konventionell negative 213 800 16:June-19:June
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 236 767 11:June-16:June
SHN Cluster Kiel Süd TenneT DE Erneuerbar negative 66 761 03:June-18:June
50H Berlin Marzahn 50Hertz Konventionell negative 68 746 23:June-14:June
50H_MNS_CR_ADB 50Hertz Erneuerbar negative 294 734 11:June-13:June
SHN Cluster Lübeck TenneT DE Erneuerbar negative 28 667 22:June-22:June
SW München KW-Pool TenneT DE Sonstiges positive 159 635 15:June-19:June
AMP_WESTNETZ_TRIER_CR_WIND Amprion Erneuerbar negative 204 613 10:June-13:June
50H_TEN_CR_S2_WD 50Hertz Erneuerbar negative 147 588 11:June-15:June
UW Diele TenneT DE Erneuerbar negative 110 578 09:June-15:June
50H OWP Baltic 1+2 50Hertz Erneuerbar negative 229 572 11:June-14:June
50H_MNS_CR_RAG 50Hertz Erneuerbar negative 216 539 11:June-13:June
UW Büttel TenneT DE Erneuerbar negative 265 530 20:June-22:June
50H OWP Arkona 50Hertz Erneuerbar negative 117 526 11:June-16:June
Hannover-Linden GuD TenneT DE Konventionell positive 114 514 02:June-06:June
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 98 512 09:June-15:June
50H PV Witznitz 50Hertz Erneuerbar negative 155 505 09:June-16:June
illwerke vkw AG TransnetBW Sonstiges positive 175 482 23:June-08:June
GUD_HERNE_6 Amprion Konventionell positive 191 478 15:June-18:June
50H PV Bartow 50Hertz Erneuerbar negative 102 458 11:June-16:June
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 220 440 20:June-22:June
50H_WEMA_CR_PMS 50Hertz Erneuerbar negative 96 410 10:June-15:June
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 94 400 12:June-16:June
NIEDERAUSSEM_K Amprion Konventionell negative 176 396 07:June-09:June
Irsching 4 TenneT DE Konventionell negative 105 367 02:June-06:June

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.19M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-06-09?

On 2026-06-09, estimated redispatch costs were approximately €0.64 million. This includes €0.23M for renewable curtailment compensation and €0.26M for conventional ramp-up costs.

Which power plants were most affected on 2026-06-09?

The most affected plant was Börse (TenneT DE) with 13,128 MWh of positive redispatch.

What was the electricity spot price on 2026-06-09?

The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 163 €/MWh with an average of 96 €/MWh.