2,616MWh Curtailed
2,614MWh Ramped Up
€0.77MEst. Cost
220 MWPeak Positive

Day-Ahead Spot: 64-240 €/MWh (avg 124)

TSO Breakdown

TSODirectionMeasuresTotal MWh
Amprion positive 18 30,922
TenneT DE negative 9 5,790
50Hertz negative 11 5,490
Amprion negative 14 5,118
TransnetBW positive 5 2,547
50Hertz positive 3 690
TenneT DE positive 2 428
TransnetBW negative 1 130

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
WEISWEILER_H Amprion Konventionell positive 414 5,690 01:June-15:June
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 559 5,030 13:June-22:June
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 454 4,312 22:June-07:June
HAMMUENTROP_20 Amprion Konventionell positive 334 3,671 04:June-15:June
Knapsack 1 Amprion Konventionell positive 395 2,570 00:June-10:June
UW Büttel TenneT DE Erneuerbar negative 304 2,278 04:June-16:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 333 2,000 08:June-15:June
Emsland Block C Amprion Konventionell positive 181 1,993 01:June-13:June
LAUSWARD_GUDF Amprion Konventionell positive 359 1,883 07:June-16:June
Datteln_4 Amprion Konventionell positive 376 1,502 09:June-13:June
WEISWEILER_H Amprion Konventionell negative 158 1,382 03:June-12:June
UW Dörpen-West TenneT DE Erneuerbar negative 206 1,339 04:June-11:June
Boxberg (Standort) 50Hertz Konventionell negative 222 1,332 08:June-14:June
HAMMUENTROP_20 Amprion Konventionell negative 173 1,254 04:June-12:June
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 302 1,209 10:June-14:June
Börse Amprion Konventionell positive 295 1,180 16:June-20:June
illwerke vkw AG TransnetBW Sonstiges positive 320 960 16:June-19:June
SHN Cluster Kiel Süd TenneT DE Erneuerbar negative 64 893 22:June-20:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 243 729 05:June-08:June
NIEDERAUSSEM_K Amprion Konventionell negative 217 650 13:June-16:June
Boxberg (Standort) 50Hertz Konventionell negative 200 600 05:June-08:June
WALSUM_10 Amprion Konventionell positive 165 576 07:June-10:June
WEISWEILER_G Amprion Konventionell positive 126 566 07:June-12:June
Datteln_4 Amprion Konventionell negative 166 497 07:June-15:June
50H Berlin Mitte 50Hertz Konventionell positive 122 488 16:June-20:June
Datteln_4 Amprion Konventionell negative 95 453 12:June-16:June
LAUSWARD_GUDF Amprion Konventionell positive 259 453 05:June-07:June
Hannover-Linden GuD TenneT DE Konventionell positive 75 412 10:June-16:June
Irsching 4 TenneT DE Konventionell negative 109 328 01:June-04:June
HUCKINGEN_A Amprion Konventionell positive 50 325 23:June-06:June
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 80 320 16:June-20:June
WEISWEILER_H Amprion Konventionell positive 106 318 07:June-10:June
AVA Cluster Voslapp TenneT DE Erneuerbar negative 86 300 09:June-13:June
Börse Amprion Konventionell positive 224 280 04:June-05:June
WALSUM_10 Amprion Konventionell negative 115 259 12:June-14:June
Heizkraftwerk Stuttgart-Münster GT 88 TransnetBW Konventionell positive 60 240 16:June-20:June
50H Berlin Marzahn 50Hertz Konventionell negative 74 222 05:June-08:June
Lippendorf 50Hertz Konventionell negative 72 216 05:June-08:June
UW Büttel TenneT DE Erneuerbar negative 53 214 00:June-05:June
Börse 50Hertz Sonstiges positive 21 200 00:June-15:June
SHN Cluster Lübeck TenneT DE Erneuerbar negative 13 183 22:June-20:June
UW Dörpen-West TenneT DE Erneuerbar negative 59 178 08:June-11:June
GERSTEINW_K1 (KapRes) Amprion Konventionell positive 59 178 10:June-13:June
Datteln_4 Amprion Konventionell negative 60 166 10:June-13:June
50H_WEMA_CR_PMS 50Hertz Erneuerbar negative 46 150 12:June-16:June
illwerke vkw AG TransnetBW Sonstiges negative 130 130 06:June-07:June
Kraftwerk Walheim GT D TransnetBW Konventionell positive 118 118 16:June-17:June
50H BASF Schwarzheide 50Hertz Konventionell negative 9 92 01:June-15:June
WALSUM_10 Amprion Konventionell negative 88 88 15:June-16:June
Jänschwalde (Standort) 50Hertz Konventionell negative 42 85 08:June-14:June

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.23M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-06-10?

On 2026-06-10, estimated redispatch costs were approximately €0.77 million. This includes €0.26M for renewable curtailment compensation and €0.4M for conventional ramp-up costs.

Which power plants were most affected on 2026-06-10?

The most affected plant was WEISWEILER_H (Amprion) with 5,690 MWh of positive redispatch.

What was the electricity spot price on 2026-06-10?

The EPEX Day-Ahead spot price for DE_LU ranged from 64 to 240 €/MWh with an average of 124 €/MWh.