1,081MWh Curtailed
997MWh Ramped Up
€0.4MEst. Cost
150 MWPeak Positive
Day-Ahead Spot: -50-152 €/MWh (avg 45)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 8 | 7,369 |
| Amprion | positive | 3 | 3,086 |
| 50Hertz | negative | 3 | 2,788 |
| TenneT DE | positive | 1 | 1,323 |
| TransnetBW | negative | 1 | 244 |
| TransnetBW | positive | 1 | 30 |
| 50Hertz | positive | 1 | 2 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | 50Hertz | Sonstiges | negative | 354 | 2,480 | 09:June-16:June |
| Knapsack 1 | Amprion | Konventionell | positive | 384 | 2,301 | 16:June-22:June |
| SHN Cluster Kiel Süd | TenneT DE | negative | 103 | 1,576 | 03:June-22:June | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,500 | 07:June-15:June | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,500 | 07:June-15:June | |
| Börse | TenneT DE | Sonstiges | positive | 588 | 1,323 | 16:June-19:June |
| SHN Cluster Kiel Süd | TenneT DE | negative | 87 | 1,136 | 22:June-13:June | |
| UW Büttel | TenneT DE | negative | 400 | 800 | 15:June-17:June | |
| LAUSWARD_GUDF | Amprion | Konventionell | positive | 258 | 710 | 15:June-18:June |
| SHN Cluster Lübeck | TenneT DE | negative | 22 | 337 | 03:June-22:June | |
| UW Büttel | TenneT DE | negative | 121 | 332 | 15:June-18:June | |
| Börse | TransnetBW | Sonstiges | negative | 57 | 244 | 22:June-12:June |
| Börse | 50Hertz | Sonstiges | negative | 200 | 200 | 12:June-13:June |
| SHN Cluster Lübeck | TenneT DE | negative | 15 | 188 | 22:June-13:June | |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 62 | 108 | 16:June-18:June |
| Knapsack 1 | Amprion | Konventionell | positive | 150 | 75 | 22:June-22:June |
| Heizkraftwerk_Pforzheim | TransnetBW | Konventionell | positive | 30 | 30 | 17:June-18:June |
| Börse | 50Hertz | Sonstiges | positive | 10 | 2 | 23:June-23:June |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.12M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-06-07?
On 2026-06-07, estimated redispatch costs were approximately €0.4 million. This includes €0.11M for renewable curtailment compensation and €0.07M for conventional ramp-up costs.
Which power plants were most affected on 2026-06-07?
The most affected plant was Börse (50Hertz) with 2,480 MWh of negative redispatch.
What was the electricity spot price on 2026-06-07?
The EPEX Day-Ahead spot price for DE_LU ranged from -50 to 152 €/MWh with an average of 45 €/MWh.