2,045MWh Curtailed
2,491MWh Ramped Up
€0.74MEst. Cost
214 MWPeak Positive
Day-Ahead Spot: 0-261 €/MWh (avg 102)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 13 | 21,387 |
| 50Hertz | negative | 27 | 10,089 |
| Amprion | positive | 7 | 2,756 |
| TenneT DE | positive | 7 | 2,293 |
| TransnetBW | positive | 3 | 413 |
| 50Hertz | positive | 4 | 216 |
| Amprion | negative | 3 | 125 |
| TransnetBW | negative | 2 | 72 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| UW Büttel | TenneT DE | negative | 583 | 4,374 | 22:May-06:May | |
| BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt | TenneT DE | negative | 350 | 3,150 | 07:May-16:May | |
| SHN Cluster Kiel Süd | TenneT DE | negative | 125 | 3,002 | 22:May-22:May | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 250 | 2,250 | 07:May-16:May | |
| 50H PV Witznitz | 50Hertz | negative | 296 | 1,848 | 07:May-14:May | |
| BAG NWAK-Cluster 12 Pirach-Simbach | TenneT DE | negative | 200 | 1,800 | 07:May-16:May | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,800 | 07:May-16:May | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 200 | 1,800 | 07:May-16:May | |
| 50H_AVA_CR_WOL | 50Hertz | negative | 247 | 1,603 | 07:May-13:May | |
| 50H_AVA_CR_STW | 50Hertz | negative | 228 | 1,425 | 07:May-13:May | |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 166 | 1,206 | 22:May-05:May |
| BAG NWAK-Cluster 14 Schwandorf | TenneT DE | negative | 100 | 900 | 07:May-16:May | |
| 50H_TEN_CR_S1_ATF | 50Hertz | negative | 226 | 846 | 08:May-12:May | |
| 50H_MNS_CR_MA_Nord | 50Hertz | negative | 170 | 806 | 08:May-12:May | |
| 50H_MNS_CR_KLM | 50Hertz | negative | 188 | 750 | 08:May-12:May | |
| SHN Cluster Lübeck | TenneT DE | negative | 31 | 746 | 22:May-22:May | |
| 50H_MNS_CR_LAU_Nord | 50Hertz | negative | 146 | 692 | 08:May-13:May | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 169 | 676 | 03:May-07:May |
| WEISWEILER_G | Amprion | Konventionell | positive | 116 | 638 | 08:May-14:May |
| 50H_AVA_CR_FOE | 50Hertz | negative | 107 | 510 | 09:May-13:May | |
| WEISWEILER_G | Amprion | Konventionell | positive | 165 | 452 | 10:May-12:May |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 200 | 450 | 08:May-10:May |
| BAG NWAK-Cluster 04 Aschaffenburg | TenneT DE | negative | 50 | 450 | 07:May-16:May | |
| 50H_EDIS_CR_WU | 50Hertz | negative | 100 | 450 | 09:May-13:May | |
| Frankfurt West 4 | TenneT DE | Konventionell | positive | 70 | 419 | 08:May-14:May |
| UW Dörpen-West | TenneT DE | negative | 200 | 400 | 06:May-08:May | |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 200 | 400 | 06:May-08:May |
| NIEHL-II | Amprion | Konventionell | positive | 180 | 360 | 04:May-06:May |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 205 | 307 | 05:May-07:May |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 80 | 259 | 07:May-14:May |
| Braunschweig GT | TenneT DE | Konventionell | positive | 41 | 247 | 22:May-04:May |
| Braunschweig GT | TenneT DE | Konventionell | positive | 39 | 216 | 08:May-13:May |
| 50H PV Bartow | 50Hertz | negative | 86 | 172 | 08:May-14:May | |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 25 | 149 | 02:May-16:May |
| 50H_TEN_CR_M1_EI | 50Hertz | negative | 53 | 134 | 08:May-11:May | |
| 50H OWP Baltic Eagle | 50Hertz | negative | 20 | 124 | 07:May-14:May | |
| 50H_AVA_CR_WK | 50Hertz | negative | 91 | 114 | 09:May-10:May | |
| 50H InfraLeuna IKW | 50Hertz | Konventionell | positive | 35 | 105 | 23:May-02:May |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 100 | 100 | 07:May-08:May |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 100 | 100 | 07:May-08:May |
| 50H UW Bertikow | 50Hertz | negative | 16 | 98 | 07:May-14:May | |
| CHEMIEPARK_MARL_KRAFTWERKE | Amprion | Konventionell | negative | 26 | 96 | 02:May-16:May |
| Braunschweig HKWM GT31 | TenneT DE | Konventionell | positive | 42 | 95 | 22:May-01:May |
| 50H_WEMA_CR_PMS | 50Hertz | negative | 47 | 94 | 10:May-12:May | |
| Börse | TransnetBW | Sonstiges | positive | 42 | 94 | 22:May-04:May |
| Börse | 50Hertz | Sonstiges | positive | 21 | 90 | 22:May-18:May |
| 50H OWP Arcadis Ost 1 | 50Hertz | negative | 13 | 68 | 07:May-13:May | |
| Börse | TransnetBW | Sonstiges | positive | 80 | 60 | 03:May-04:May |
| Robert Frank 4 GT (KapRes) | TenneT DE | Konventionell | positive | 28 | 56 | 12:May-14:May |
| Braunschweig HKWM DT42 | TenneT DE | Konventionell | positive | 9 | 55 | 08:May-14:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.22M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-29?
On 2026-05-29, estimated redispatch costs were approximately €0.74 million. This includes €0.2M for renewable curtailment compensation and €0.33M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-29?
The most affected plant was UW Büttel (TenneT DE) with 4,374 MWh of negative redispatch.
What was the electricity spot price on 2026-05-29?
The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 261 €/MWh with an average of 102 €/MWh.