← 2026-05-28

Friday, May 29, 2026

2026-05-30 →
2,045MWh Curtailed
2,491MWh Ramped Up
€0.74MEst. Cost
214 MWPeak Positive

Day-Ahead Spot: 0-261 €/MWh (avg 102)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 13 21,387
50Hertz negative 27 10,089
Amprion positive 7 2,756
TenneT DE positive 7 2,293
TransnetBW positive 3 413
50Hertz positive 4 216
Amprion negative 3 125
TransnetBW negative 2 72

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
UW Büttel TenneT DE Erneuerbar negative 583 4,374 22:May-06:May
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 350 3,150 07:May-16:May
SHN Cluster Kiel Süd TenneT DE Erneuerbar negative 125 3,002 22:May-22:May
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 250 2,250 07:May-16:May
50H PV Witznitz 50Hertz Erneuerbar negative 296 1,848 07:May-14:May
BAG NWAK-Cluster 12 Pirach-Simbach TenneT DE Erneuerbar negative 200 1,800 07:May-16:May
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,800 07:May-16:May
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 200 1,800 07:May-16:May
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 247 1,603 07:May-13:May
50H_AVA_CR_STW 50Hertz Erneuerbar negative 228 1,425 07:May-13:May
Hannover-Linden GuD TenneT DE Konventionell positive 166 1,206 22:May-05:May
BAG NWAK-Cluster 14 Schwandorf TenneT DE Erneuerbar negative 100 900 07:May-16:May
50H_TEN_CR_S1_ATF 50Hertz Erneuerbar negative 226 846 08:May-12:May
50H_MNS_CR_MA_Nord 50Hertz Erneuerbar negative 170 806 08:May-12:May
50H_MNS_CR_KLM 50Hertz Erneuerbar negative 188 750 08:May-12:May
SHN Cluster Lübeck TenneT DE Erneuerbar negative 31 746 22:May-22:May
50H_MNS_CR_LAU_Nord 50Hertz Erneuerbar negative 146 692 08:May-13:May
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 169 676 03:May-07:May
WEISWEILER_G Amprion Konventionell positive 116 638 08:May-14:May
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 107 510 09:May-13:May
WEISWEILER_G Amprion Konventionell positive 165 452 10:May-12:May
NIEHL-31-GUD Amprion Konventionell positive 200 450 08:May-10:May
BAG NWAK-Cluster 04 Aschaffenburg TenneT DE Erneuerbar negative 50 450 07:May-16:May
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 100 450 09:May-13:May
Frankfurt West 4 TenneT DE Konventionell positive 70 419 08:May-14:May
UW Dörpen-West TenneT DE Erneuerbar negative 200 400 06:May-08:May
NIEHL-31-GUD Amprion Konventionell positive 200 400 06:May-08:May
NIEHL-II Amprion Konventionell positive 180 360 04:May-06:May
HAMMUENTROP_20 Amprion Konventionell positive 205 307 05:May-07:May
illwerke vkw AG TransnetBW Sonstiges positive 80 259 07:May-14:May
Braunschweig GT TenneT DE Konventionell positive 41 247 22:May-04:May
Braunschweig GT TenneT DE Konventionell positive 39 216 08:May-13:May
50H PV Bartow 50Hertz Erneuerbar negative 86 172 08:May-14:May
BIBLIS_GT (bnBm) Amprion Konventionell positive 25 149 02:May-16:May
50H_TEN_CR_M1_EI 50Hertz Erneuerbar negative 53 134 08:May-11:May
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 20 124 07:May-14:May
50H_AVA_CR_WK 50Hertz Erneuerbar negative 91 114 09:May-10:May
50H InfraLeuna IKW 50Hertz Konventionell positive 35 105 23:May-02:May
Boxberg (Standort) 50Hertz Konventionell negative 100 100 07:May-08:May
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 100 100 07:May-08:May
50H UW Bertikow 50Hertz Erneuerbar negative 16 98 07:May-14:May
CHEMIEPARK_MARL_KRAFTWERKE Amprion Konventionell negative 26 96 02:May-16:May
Braunschweig HKWM GT31 TenneT DE Konventionell positive 42 95 22:May-01:May
50H_WEMA_CR_PMS 50Hertz Erneuerbar negative 47 94 10:May-12:May
Börse TransnetBW Sonstiges positive 42 94 22:May-04:May
Börse 50Hertz Sonstiges positive 21 90 22:May-18:May
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 13 68 07:May-13:May
Börse TransnetBW Sonstiges positive 80 60 03:May-04:May
Robert Frank 4 GT (KapRes) TenneT DE Konventionell positive 28 56 12:May-14:May
Braunschweig HKWM DT42 TenneT DE Konventionell positive 9 55 08:May-14:May

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.22M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-05-29?

On 2026-05-29, estimated redispatch costs were approximately €0.74 million. This includes €0.2M for renewable curtailment compensation and €0.33M for conventional ramp-up costs.

Which power plants were most affected on 2026-05-29?

The most affected plant was UW Büttel (TenneT DE) with 4,374 MWh of negative redispatch.

What was the electricity spot price on 2026-05-29?

The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 261 €/MWh with an average of 102 €/MWh.