1,979MWh Curtailed
1,976MWh Ramped Up
€0.65MEst. Cost
168 MWPeak Positive
Day-Ahead Spot: -2-176 €/MWh (avg 86)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 7 | 7,365 |
| Amprion | positive | 2 | 2,396 |
| TenneT DE | positive | 3 | 2,133 |
| 50Hertz | negative | 6 | 369 |
| TransnetBW | positive | 1 | 292 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Knapsack 1 | Amprion | Konventionell | positive | 382 | 2,388 | 00:May-06:May |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 250 | 2,000 | 08:May-16:May | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 250 | 2,000 | 08:May-16:May | |
| Börse | TenneT DE | Sonstiges | positive | 634 | 1,742 | 06:May-16:May |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,600 | 08:May-16:May | |
| SHN Cluster Kiel Süd | TenneT DE | negative | 91 | 1,454 | 22:May-17:May | |
| SW München KW-Pool | TenneT DE | Sonstiges | positive | 94 | 305 | 02:May-05:May |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 292 | 292 | 19:May-20:May |
| 50H_EDIS_CR_PAS | 50Hertz | negative | 125 | 188 | 00:May-01:May | |
| SHN Cluster Lübeck | TenneT DE | negative | 11 | 181 | 22:May-17:May | |
| UW Büttel | TenneT DE | negative | 200 | 100 | 06:May-06:May | |
| Börse | TenneT DE | Sonstiges | positive | 115 | 86 | 01:May-02:May |
| 50H_EDIS_CR_LV_WU | 50Hertz | negative | 75 | 75 | 09:May-10:May | |
| Börse | 50Hertz | Sonstiges | negative | 10 | 47 | 09:May-14:May |
| CROC Cluster Görries | 50Hertz | Sonstiges | negative | 40 | 40 | 09:May-10:May |
| Börse | TenneT DE | Sonstiges | negative | 60 | 30 | 02:May-02:May |
| 50H_WEMA_CR_GOE | 50Hertz | negative | 40 | 10 | 08:May-09:May | |
| 50H Hamburg MMB BHKW PtH | 50Hertz | Konventionell | negative | 9 | 9 | 04:May-05:May |
| Börse | Amprion | Konventionell | positive | 30 | 8 | 19:May-19:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.2M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-30?
On 2026-05-30, estimated redispatch costs were approximately €0.65 million. This includes €0.2M for renewable curtailment compensation and €0.23M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-30?
The most affected plant was Knapsack 1 (Amprion) with 2,388 MWh of positive redispatch.
What was the electricity spot price on 2026-05-30?
The EPEX Day-Ahead spot price for DE_LU ranged from -2 to 176 €/MWh with an average of 86 €/MWh.