1,979MWh Curtailed
1,976MWh Ramped Up
€0.65MEst. Cost
168 MWPeak Positive

Day-Ahead Spot: -2-176 €/MWh (avg 86)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 7 7,365
Amprion positive 2 2,396
TenneT DE positive 3 2,133
50Hertz negative 6 369
TransnetBW positive 1 292

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Knapsack 1 Amprion Konventionell positive 382 2,388 00:May-06:May
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 250 2,000 08:May-16:May
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 250 2,000 08:May-16:May
Börse TenneT DE Sonstiges positive 634 1,742 06:May-16:May
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,600 08:May-16:May
SHN Cluster Kiel Süd TenneT DE Erneuerbar negative 91 1,454 22:May-17:May
SW München KW-Pool TenneT DE Sonstiges positive 94 305 02:May-05:May
illwerke vkw AG TransnetBW Sonstiges positive 292 292 19:May-20:May
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 125 188 00:May-01:May
SHN Cluster Lübeck TenneT DE Erneuerbar negative 11 181 22:May-17:May
UW Büttel TenneT DE Erneuerbar negative 200 100 06:May-06:May
Börse TenneT DE Sonstiges positive 115 86 01:May-02:May
50H_EDIS_CR_LV_WU 50Hertz Erneuerbar negative 75 75 09:May-10:May
Börse 50Hertz Sonstiges negative 10 47 09:May-14:May
CROC Cluster Görries 50Hertz Sonstiges negative 40 40 09:May-10:May
Börse TenneT DE Sonstiges negative 60 30 02:May-02:May
50H_WEMA_CR_GOE 50Hertz Erneuerbar negative 40 10 08:May-09:May
50H Hamburg MMB BHKW PtH 50Hertz Konventionell negative 9 9 04:May-05:May
Börse Amprion Konventionell positive 30 8 19:May-19:May

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.2M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-05-30?

On 2026-05-30, estimated redispatch costs were approximately €0.65 million. This includes €0.2M for renewable curtailment compensation and €0.23M for conventional ramp-up costs.

Which power plants were most affected on 2026-05-30?

The most affected plant was Knapsack 1 (Amprion) with 2,388 MWh of positive redispatch.

What was the electricity spot price on 2026-05-30?

The EPEX Day-Ahead spot price for DE_LU ranged from -2 to 176 €/MWh with an average of 86 €/MWh.