Braunschweig HKWM DT42
Konventionell • TenneT DE
138Total MWh
5Measures
10 MWAvg Power
0Curtailments
5Ramp-ups
Data: 2025-07-22 to 2026-04-26
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2026-04-26 | 1 | 24 |
| 2026-04-25 | 2 | 50 |
| 2025-07-23 | 1 | 36 |
| 2025-07-22 | 1 | 28 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2026-04-26 | TenneT DE | positive | 11 | 24 | 07:April-09:April |
| 2026-04-25 | TenneT DE | positive | 11 | 25 | 07:April-09:April |
| 2026-04-25 | TenneT DE | positive | 11 | 25 | 07:April-09:April |
| 2025-07-23 | TenneT DE | positive | 9 | 36 | 09:July-13:July |
| 2025-07-22 | TenneT DE | positive | 7 | 28 | 10:July-14:July |
Frequently Asked Questions
What is the redispatch history of Braunschweig HKWM DT42?
Braunschweig HKWM DT42 is a Konventionell power plant in the TenneT DE grid zone. It has received 5 redispatch instructions totaling 138 MWh since 2025-07-22.
Why is Braunschweig HKWM DT42 frequently redispatched?
Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.