← 2026-04-25

Sunday, April 26, 2026

2026-04-27 →
1,869MWh Curtailed
424MWh Ramped Up
€0.45MEst. Cost
216 MWPeak Positive

Day-Ahead Spot: -135-185 €/MWh (avg 51)

TSO Breakdown

TSODirectionMeasuresTotal MWh
Amprion positive 12 13,728
50Hertz negative 45 7,423
TenneT DE negative 6 7,032
TenneT DE positive 9 1,949
TransnetBW positive 2 1,194
Amprion negative 6 663
50Hertz positive 1 270
TransnetBW negative 1 107

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Knapsack 1 Amprion Konventionell positive 505 4,291 01:April-09:April
Börse TenneT DE Sonstiges negative 385 4,142 05:April-15:April
WEISWEILER_H Amprion Konventionell positive 517 3,748 14:April-22:April
WEISWEILER_H Amprion Konventionell positive 303 2,350 22:April-05:April
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 175 1,400 06:April-14:April
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 150 1,200 06:April-14:April
ReserveKW Staudinger 5 TenneT DE Konventionell positive 206 1,132 00:April-06:April
illwerke vkw AG TransnetBW Sonstiges positive 181 1,085 03:April-21:April
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 243 912 06:April-09:April
50H PV Witznitz 50Hertz Erneuerbar negative 181 859 05:April-09:April
KMW_KW3 Amprion Konventionell positive 173 778 02:April-07:April
GUD_HERNE_6 Amprion Konventionell positive 228 684 02:April-05:April
Emsland Block C Amprion Konventionell positive 115 575 02:April-07:April
NIEDERAUSSEM_G Amprion Konventionell positive 171 556 03:April-07:April
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 172 516 05:April-08:April
50H_EDIS_CR_LV_WEST 50Hertz Erneuerbar negative 113 509 06:April-15:April
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 139 488 06:April-09:April
NIEDERAUSSEM_G Amprion Konventionell positive 200 450 14:April-16:April
50H UW Bertikow 50Hertz Erneuerbar negative 87 434 05:April-10:April
50H_AVA_CR_STW 50Hertz Erneuerbar negative 212 425 07:April-09:April
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 93 348 04:April-08:April
50H OWP Arkona 50Hertz Erneuerbar negative 164 328 05:April-07:April
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 82 308 06:April-09:April
Börse Amprion Konventionell negative 75 283 00:April-14:April
Linden GKL GT 1 TenneT DE Konventionell positive 56 280 04:April-09:April
50H_MNS_CR_JSN 50Hertz Erneuerbar negative 86 278 06:April-09:April
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 156 272 08:April-09:April
50H Hamburg Tiefstack 2 HKW SK 50Hertz Konventionell positive 90 270 05:April-08:April
50H OWP Wikinger 50Hertz Erneuerbar negative 93 232 05:April-07:April
50H_WEMA_CR_GOE 50Hertz Erneuerbar negative 112 225 07:April-09:April
50H OWP Arkona 50Hertz Erneuerbar negative 106 211 02:April-04:April
Knapsack 1 Amprion Konventionell negative 153 191 06:April-07:April
Linden GKL DT TenneT DE Konventionell positive 35 176 04:April-09:April
GERSTEINW_F (KapRes) Amprion Konventionell positive 117 176 05:April-07:April
50H PV Bartow 50Hertz Erneuerbar negative 80 160 05:April-07:April
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 88 153 03:April-06:April
Hannover (GKH) 2 TenneT DE Konventionell negative 50 150 02:April-05:April
NIEDERAUSSEM_G Amprion Konventionell negative 76 134 04:April-05:April
50H_WEMA_CR_GUE 50Hertz Erneuerbar negative 67 118 08:April-09:April
illwerke vkw AG TransnetBW Sonstiges positive 109 109 08:April-09:April
50H UW Schönewalde 50Hertz Erneuerbar negative 54 108 03:April-06:April
Heizkraftwerk_Pforzheim TransnetBW Konventionell negative 21 107 01:April-06:April
Audorf TenneT DE Konventionell positive 50 100 06:April-08:April
Braunschweig HKWM GT31 TenneT DE Konventionell positive 42 94 06:April-08:April
Braunschweig HKWN GT TenneT DE Konventionell positive 20 84 04:April-09:April
50H_EDIS_CR_LHG 50Hertz Erneuerbar negative 52 78 07:April-09:April
50H_EDIS_CR_BW 50Hertz Erneuerbar negative 50 75 07:April-09:April
Leitzach Pool TenneT DE Sonstiges negative 72 72 07:April-08:April
Huntorf TenneT DE Konventionell negative 68 68 07:April-08:April
Börse Amprion Konventionell positive 104 52 03:April-05:April

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.14M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-04-26?

On 2026-04-26, estimated redispatch costs were approximately €0.45 million. This includes €0.19M for renewable curtailment compensation and €0.03M for conventional ramp-up costs.

Which power plants were most affected on 2026-04-26?

The most affected plant was Knapsack 1 (Amprion) with 4,291 MWh of positive redispatch.

What was the electricity spot price on 2026-04-26?

The EPEX Day-Ahead spot price for DE_LU ranged from -135 to 185 €/MWh with an average of 51 €/MWh.