← 2026-04-26

Monday, April 27, 2026

2026-04-28 →
2,612MWh Curtailed
2,284MWh Ramped Up
€0.7MEst. Cost
238 MWPeak Positive

Day-Ahead Spot: -5-202 €/MWh (avg 104)

TSO Breakdown

TSODirectionMeasuresTotal MWh
50Hertz negative 43 19,833
Amprion positive 10 8,670
TenneT DE negative 3 2,313
TenneT DE positive 9 1,484
TransnetBW positive 4 268
TransnetBW negative 2 7

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
WEISWEILER_H Amprion Konventionell positive 241 2,286 05:April-15:April
50H PV Witznitz 50Hertz Erneuerbar negative 239 2,152 05:April-15:April
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 273 1,775 07:April-14:April
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 540 1,619 05:April-08:April
Emsland Block B Amprion Konventionell positive 174 1,302 01:April-09:April
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,150 08:April-14:April
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 256 1,150 06:April-11:April
LAUSWARD_GUDF Amprion Konventionell positive 377 1,131 06:April-09:April
50H_AVA_CR_STW 50Hertz Erneuerbar negative 251 1,130 06:April-11:April
Emsland Block C Amprion Konventionell positive 183 1,098 04:April-10:April
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 187 1,075 08:April-14:April
Boxberg (Standort) 50Hertz Konventionell negative 345 1,034 06:April-09:April
WEISWEILER_H Amprion Konventionell positive 187 888 03:April-08:April
Boxberg (Standort) 50Hertz Konventionell negative 167 754 03:April-08:April
50H_MNS_CR_PUL 50Hertz Erneuerbar negative 250 750 07:April-10:April
50H_TEN_CR_S1_ATF 50Hertz Erneuerbar negative 229 688 07:April-10:April
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 224 673 04:April-07:April
KMW_KW3 Amprion Konventionell positive 229 631 07:April-10:April
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 126 538 06:April-10:April
50H_WEMA_CR_GOE 50Hertz Erneuerbar negative 88 525 08:April-14:April
Jänschwalde (Standort) 50Hertz Konventionell negative 257 514 06:April-08:April
Netzreservekraftwerk VOELKLINGEN_HKV Amprion Konventionell positive 65 485 08:April-16:April
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 168 462 08:April-10:April
50H_MNS_CR_KLM 50Hertz Erneuerbar negative 138 448 07:April-10:April
50H_MNS_CR_MA_Nord 50Hertz Erneuerbar negative 141 422 07:April-10:April
50H_TEN_CR_M2_VIB 50Hertz Erneuerbar negative 165 412 07:April-10:April
50H_MNS_CR_RAG 50Hertz Erneuerbar negative 138 412 07:April-10:April
HERDECKE_H6 Amprion Konventionell positive 232 406 07:April-08:April
Jänschwalde (Standort) 50Hertz Konventionell negative 200 399 05:April-07:April
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 167 375 08:April-10:April
50H Berlin Marzahn 50Hertz Konventionell negative 124 371 05:April-08:April
KMW_KW3 Amprion Konventionell positive 241 362 06:April-08:April
Börse TenneT DE Sonstiges positive 191 335 03:April-19:April
50H PV Bartow 50Hertz Erneuerbar negative 89 312 07:April-15:April
Linden GKL GT 1 TenneT DE Konventionell positive 57 311 04:April-10:April
50H_MNS_CR_JSN 50Hertz Erneuerbar negative 122 305 07:April-10:April
50H Berlin Lichterfelde 50Hertz Konventionell negative 97 292 04:April-07:April
50H_EDIS_CR_PE 50Hertz Erneuerbar negative 96 288 07:April-10:April
50H_MNS_CR_LAU_Nord 50Hertz Erneuerbar negative 100 275 07:April-10:April
50H_MNS_CR_LAU_Sued 50Hertz Erneuerbar negative 96 265 07:April-10:April
50H Berlin Marzahn 50Hertz Konventionell negative 66 230 03:April-07:April
50H Berlin Mitte 50Hertz Konventionell negative 59 207 01:April-08:April
Linden GKL DT TenneT DE Konventionell positive 31 169 04:April-10:April
50H_MNS_CR_MA_Sued 50Hertz Erneuerbar negative 73 165 07:April-10:April
Itzehoe TenneT DE Konventionell positive 82 165 06:April-10:April
50H_EDIS_CR_ATS 50Hertz Erneuerbar negative 93 162 08:April-10:April
Itzehoe TenneT DE Konventionell positive 78 157 07:April-09:April
50H Berlin Mitte 50Hertz Konventionell negative 124 154 06:April-08:April
50H UW Bertikow 50Hertz Erneuerbar negative 17 146 06:April-15:April
50H_EDIS_CR_PZS 50Hertz Erneuerbar negative 77 116 07:April-09:April

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.21M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-04-27?

On 2026-04-27, estimated redispatch costs were approximately €0.7 million. This includes €0.26M for renewable curtailment compensation and €0.31M for conventional ramp-up costs.

Which power plants were most affected on 2026-04-27?

The most affected plant was WEISWEILER_H (Amprion) with 2,286 MWh of positive redispatch.

What was the electricity spot price on 2026-04-27?

The EPEX Day-Ahead spot price for DE_LU ranged from -5 to 202 €/MWh with an average of 104 €/MWh.