1,948MWh Curtailed
2,269MWh Ramped Up
€0.69MEst. Cost
251 MWPeak Positive

Day-Ahead Spot: -3-272 €/MWh (avg 98)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE positive 17 28,800
TenneT DE negative 21 18,579
50Hertz negative 36 15,433
Amprion positive 15 12,514
TransnetBW positive 10 1,967
50Hertz positive 1 60
TransnetBW negative 1 20

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 757 12,496 22:May-21:May
Börse TenneT DE Sonstiges positive 929 6,968 14:May-22:May
ReserveKW Staudinger 5 TenneT DE Konventionell positive 366 4,668 22:May-22:May
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 556 3,893 15:May-22:May
SHN Cluster Kiel Süd TenneT DE Erneuerbar negative 130 3,119 22:May-22:May
LAUSWARD_GUDF Amprion Konventionell positive 290 2,462 06:May-22:May
Börse TenneT DE Sonstiges negative 209 2,140 22:May-22:May
Emsland Block B Amprion Konventionell positive 216 2,109 12:May-22:May
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 282 1,975 07:May-14:May
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 231 1,903 06:May-15:May
Netzreservekraftwerk KMW 2 DT Amprion Konventionell positive 137 1,819 07:May-20:May
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 250 1,750 07:May-14:May
UW Büttel TenneT DE Erneuerbar negative 252 1,511 15:May-22:May
Emsland Block C Amprion Konventionell positive 185 1,435 22:May-20:May
Jänschwalde (Standort) 50Hertz Konventionell negative 199 1,396 15:May-22:May
Rostock Kohlekraftwerk 50Hertz Konventionell negative 212 1,270 16:May-22:May
UW Büttel TenneT DE Erneuerbar negative 209 1,256 22:May-04:May
UW Emden-Ost TenneT DE Erneuerbar negative 491 1,104 11:May-13:May
HAMMUENTROP_20 Amprion Konventionell positive 208 1,092 22:May-19:May
Hannover-Linden GuD TenneT DE Konventionell positive 110 960 13:May-22:May
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 185 926 04:May-16:May
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 132 925 07:May-14:May
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 275 825 06:May-09:May
Hannover-Linden GuD TenneT DE Konventionell positive 81 811 08:May-22:May
SHN Cluster Lübeck TenneT DE Erneuerbar negative 32 765 22:May-22:May
Emsland Block C Amprion Konventionell positive 299 748 19:May-22:May
BAG NWAK-Cluster 12 Pirach-Simbach TenneT DE Erneuerbar negative 100 700 07:May-14:May
NIEHL-II Amprion Konventionell positive 116 699 11:May-17:May
Hannover-Linden GuD TenneT DE Konventionell positive 132 694 04:May-09:May
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 251 628 05:May-08:May
Emsland Block B Amprion Konventionell positive 250 625 22:May-00:May
GUD_HERNE_6 Amprion Konventionell positive 182 590 07:May-16:May
illwerke vkw AG TransnetBW Sonstiges positive 377 565 12:May-13:May
50H OWP Arkona 50Hertz Erneuerbar negative 86 562 07:May-15:May
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 248 496 06:May-08:May
Frankfurt West 4 TenneT DE Konventionell positive 70 492 15:May-22:May
BAG NWAK-Cluster 06 Raitersaich TenneT DE Erneuerbar negative 100 475 08:May-13:May
BAG NWAK-Cluster 05 Kriegenbrunn-Ludersheim TenneT DE Erneuerbar negative 100 475 08:May-13:May
BAG NWAK-Cluster 04 Aschaffenburg TenneT DE Erneuerbar negative 100 475 08:May-13:May
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 100 475 08:May-13:May
Heizkraftwerk Stuttgart-Münster GT 87 TransnetBW Konventionell positive 49 468 04:May-22:May
Irsching 4 TenneT DE Konventionell negative 145 435 17:May-20:May
50H PV Witznitz 50Hertz Erneuerbar negative 153 420 07:May-13:May
50H_AVA_CR_STW 50Hertz Erneuerbar negative 130 389 06:May-09:May
illwerke vkw AG TransnetBW Sonstiges positive 96 336 08:May-22:May
HAMMUENTROP_20 Amprion Konventionell positive 189 331 14:May-16:May
ReserveKW Staudinger 5 TenneT DE Konventionell positive 87 328 17:May-21:May
50H OWP Wikinger 50Hertz Erneuerbar negative 115 316 06:May-15:May
Kraftwerk Walheim GT D TransnetBW Konventionell positive 100 300 18:May-21:May
HUCKINGEN_B Amprion Konventionell positive 100 300 18:May-21:May

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.21M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-05-26?

On 2026-05-26, estimated redispatch costs were approximately €0.69 million. This includes €0.19M for renewable curtailment compensation and €0.29M for conventional ramp-up costs.

Which power plants were most affected on 2026-05-26?

The most affected plant was Börse (TenneT DE) with 12,496 MWh of positive redispatch.

What was the electricity spot price on 2026-05-26?

The EPEX Day-Ahead spot price for DE_LU ranged from -3 to 272 €/MWh with an average of 98 €/MWh.