1,826MWh Curtailed
1,886MWh Ramped Up
€0.63MEst. Cost
177 MWPeak Positive
Day-Ahead Spot: -35-185 €/MWh (avg 82)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 13 | 16,065 |
| TenneT DE | positive | 4 | 8,730 |
| 50Hertz | negative | 5 | 1,924 |
| 50Hertz | positive | 2 | 244 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 373 | 4,755 | 22:May-22:May |
| SHN Cluster Kiel Süd | TenneT DE | negative | 131 | 3,154 | 22:May-22:May | |
| Börse | TenneT DE | Sonstiges | negative | 315 | 2,914 | 22:May-22:May |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 321 | 2,250 | 07:May-14:May | |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 262 | 1,572 | 16:May-22:May |
| Börse | TenneT DE | Sonstiges | negative | 262 | 1,572 | 16:May-22:May |
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 201 | 1,408 | 22:May-05:May |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,400 | 07:May-14:May | |
| 50H PV Witznitz | 50Hertz | negative | 329 | 1,234 | 10:May-13:May | |
| UW Büttel | TenneT DE | negative | 275 | 1,100 | 10:May-14:May | |
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 142 | 995 | 15:May-22:May |
| Börse | TenneT DE | Sonstiges | negative | 142 | 995 | 15:May-22:May |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 121 | 850 | 07:May-14:May | |
| SHN Cluster Lübeck | TenneT DE | negative | 31 | 753 | 22:May-22:May | |
| BAG NWAK-Cluster 12 Pirach-Simbach | TenneT DE | negative | 100 | 700 | 07:May-14:May | |
| 50H OWP Arcadis Ost 1 | 50Hertz | negative | 130 | 521 | 10:May-14:May | |
| Börse | 50Hertz | Sonstiges | positive | 22 | 212 | 22:May-22:May |
| UW Diele | TenneT DE | negative | 47 | 187 | 10:May-14:May | |
| UW Emden-Ost | TenneT DE | negative | 42 | 125 | 10:May-13:May | |
| 50H UW Bertikow | 50Hertz | negative | 22 | 78 | 10:May-14:May | |
| 50H OWP Baltic Eagle | 50Hertz | negative | 263 | 66 | 13:May-14:May | |
| UW Dörpen-West | TenneT DE | negative | 21 | 64 | 10:May-13:May | |
| Börse | 50Hertz | Sonstiges | positive | 12 | 32 | 15:May-21:May |
| 50H_EDIS_CR_HND | 50Hertz | negative | 10 | 25 | 09:May-11:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.19M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-25?
On 2026-05-25, estimated redispatch costs were approximately €0.63 million. This includes €0.18M for renewable curtailment compensation and €0.21M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-25?
The most affected plant was ReserveKW Staudinger 5 (TenneT DE) with 4,755 MWh of positive redispatch.
What was the electricity spot price on 2026-05-25?
The EPEX Day-Ahead spot price for DE_LU ranged from -35 to 185 €/MWh with an average of 82 €/MWh.