1,870MWh Curtailed
1,986MWh Ramped Up
€0.64MEst. Cost
162 MWPeak Positive
Day-Ahead Spot: -2-171 €/MWh (avg 84)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 16 | 15,956 |
| Amprion | positive | 10 | 6,769 |
| TenneT DE | positive | 8 | 5,033 |
| 50Hertz | negative | 15 | 4,710 |
| TransnetBW | positive | 8 | 1,413 |
| Amprion | negative | 1 | 127 |
| TransnetBW | negative | 1 | 60 |
| 50Hertz | positive | 1 | 22 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 288 | 3,738 | 22:May-11:May |
| Börse | TenneT DE | Sonstiges | negative | 278 | 3,615 | 22:May-11:May |
| Knapsack 1 | Amprion | Konventionell | positive | 405 | 3,242 | 00:May-17:May |
| UW Büttel | TenneT DE | negative | 316 | 3,076 | 05:May-21:May | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 250 | 2,250 | 07:May-16:May | |
| SHN Cluster Kiel Süd | TenneT DE | negative | 86 | 1,921 | 22:May-22:May | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,800 | 07:May-16:May | |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 171 | 1,027 | 04:May-19:May |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 900 | 07:May-16:May | |
| Knapsack 1 | Amprion | Konventionell | positive | 193 | 821 | 02:May-07:May |
| GUD_HERNE_6 | Amprion | Konventionell | positive | 332 | 748 | 06:May-08:May |
| Emsland Block B | Amprion | Konventionell | positive | 147 | 734 | 16:May-21:May |
| 50H_AVA_CR_STW | 50Hertz | negative | 255 | 638 | 07:May-09:May | |
| 50H_AVA_CR_WOL | 50Hertz | negative | 255 | 638 | 07:May-09:May | |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 248 | 558 | 14:May-17:May |
| 50H_WEMA_CR_PMS | 50Hertz | negative | 70 | 556 | 08:May-16:May | |
| UW Büttel | TenneT DE | negative | 404 | 505 | 06:May-08:May | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 500 | 500 | 12:May-13:May |
| BAG NWAK-Cluster 12 Pirach-Simbach | TenneT DE | negative | 50 | 450 | 07:May-16:May | |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | negative | 197 | 442 | 16:May-18:May |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 131 | 425 | 15:May-18:May |
| 50H PV Witznitz | 50Hertz | negative | 171 | 384 | 06:May-08:May | |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 89 | 355 | 15:May-19:May |
| SHN Cluster Lübeck | TenneT DE | negative | 15 | 335 | 22:May-22:May | |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 167 | 334 | 05:May-07:May |
| 50H_EDIS_CR_HND | 50Hertz | negative | 46 | 314 | 08:May-14:May | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 248 | 310 | 06:May-08:May |
| UW Büttel | TenneT DE | negative | 300 | 300 | 12:May-13:May | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 350 | 262 | 09:May-10:May |
| 50H PV Witznitz | 50Hertz | negative | 350 | 262 | 09:May-10:May | |
| Emsland Block C | Amprion | Konventionell | positive | 91 | 182 | 16:May-18:May |
| Braunschweig GT | TenneT DE | Konventionell | positive | 38 | 172 | 15:May-19:May |
| Kraftwerk Walheim GT D | TransnetBW | Konventionell | positive | 85 | 170 | 16:May-18:May |
| 50H_MNS_CR_LV_OST | 50Hertz | negative | 93 | 162 | 07:May-08:May | |
| KMW_KW5 | Amprion | Konventionell | positive | 78 | 156 | 16:May-18:May |
| Frankfurt West 4 | TenneT DE | Konventionell | positive | 68 | 152 | 05:May-07:May |
| Netzreservekraftwerk GTKW-DA-POOL | Amprion | Konventionell | positive | 64 | 128 | 16:May-18:May |
| HAMMUENTROP_20 | Amprion | Konventionell | negative | 127 | 127 | 19:May-20:May |
| HUCKINGEN_B | Amprion | Konventionell | positive | 75 | 112 | 16:May-18:May |
| 50H_EDIS_CR_PAS | 50Hertz | negative | 50 | 100 | 15:May-17:May | |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 80 | 100 | 06:May-08:May |
| UW Dörpen-West | TenneT DE | negative | 100 | 100 | 12:May-13:May | |
| SW München KW-Pool | TenneT DE | Sonstiges | positive | 48 | 97 | 16:May-18:May |
| 50H PV Bartow | 50Hertz | negative | 65 | 97 | 06:May-08:May | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 63 | 94 | 15:May-16:May |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 30 | 91 | 00:May-06:May |
| Knapsack 1 | Amprion | Konventionell | positive | 88 | 88 | 16:May-17:May |
| Kiel (Küstenkraftwerk gesamt) | TenneT DE | Konventionell | negative | 67 | 67 | 18:May-19:May |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 62 | 62 | 16:May-17:May |
| Börse | TransnetBW | Sonstiges | negative | 120 | 60 | 15:May-16:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.19M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-27?
On 2026-05-27, estimated redispatch costs were approximately €0.64 million. This includes €0.19M for renewable curtailment compensation and €0.23M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-27?
The most affected plant was ReserveKW Staudinger 5 (TenneT DE) with 3,738 MWh of positive redispatch.
What was the electricity spot price on 2026-05-27?
The EPEX Day-Ahead spot price for DE_LU ranged from -2 to 171 €/MWh with an average of 84 €/MWh.