1,870MWh Curtailed
1,986MWh Ramped Up
€0.64MEst. Cost
162 MWPeak Positive

Day-Ahead Spot: -2-171 €/MWh (avg 84)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 16 15,956
Amprion positive 10 6,769
TenneT DE positive 8 5,033
50Hertz negative 15 4,710
TransnetBW positive 8 1,413
Amprion negative 1 127
TransnetBW negative 1 60
50Hertz positive 1 22

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
ReserveKW Staudinger 5 TenneT DE Konventionell positive 288 3,738 22:May-11:May
Börse TenneT DE Sonstiges negative 278 3,615 22:May-11:May
Knapsack 1 Amprion Konventionell positive 405 3,242 00:May-17:May
UW Büttel TenneT DE Erneuerbar negative 316 3,076 05:May-21:May
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 250 2,250 07:May-16:May
SHN Cluster Kiel Süd TenneT DE Erneuerbar negative 86 1,921 22:May-22:May
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,800 07:May-16:May
Jänschwalde (Standort) 50Hertz Konventionell negative 171 1,027 04:May-19:May
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 100 900 07:May-16:May
Knapsack 1 Amprion Konventionell positive 193 821 02:May-07:May
GUD_HERNE_6 Amprion Konventionell positive 332 748 06:May-08:May
Emsland Block B Amprion Konventionell positive 147 734 16:May-21:May
50H_AVA_CR_STW 50Hertz Erneuerbar negative 255 638 07:May-09:May
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 255 638 07:May-09:May
HAMMUENTROP_20 Amprion Konventionell positive 248 558 14:May-17:May
50H_WEMA_CR_PMS 50Hertz Erneuerbar negative 70 556 08:May-16:May
UW Büttel TenneT DE Erneuerbar negative 404 505 06:May-08:May
illwerke vkw AG TransnetBW Sonstiges positive 500 500 12:May-13:May
BAG NWAK-Cluster 12 Pirach-Simbach TenneT DE Erneuerbar negative 50 450 07:May-16:May
ReserveKW Staudinger 5 TenneT DE Konventionell negative 197 442 16:May-18:May
ReserveKW Staudinger 5 TenneT DE Konventionell positive 131 425 15:May-18:May
50H PV Witznitz 50Hertz Erneuerbar negative 171 384 06:May-08:May
Hannover-Linden GuD TenneT DE Konventionell positive 89 355 15:May-19:May
SHN Cluster Lübeck TenneT DE Erneuerbar negative 15 335 22:May-22:May
Boxberg (Standort) 50Hertz Konventionell negative 167 334 05:May-07:May
50H_EDIS_CR_HND 50Hertz Erneuerbar negative 46 314 08:May-14:May
illwerke vkw AG TransnetBW Sonstiges positive 248 310 06:May-08:May
UW Büttel TenneT DE Erneuerbar negative 300 300 12:May-13:May
illwerke vkw AG TransnetBW Sonstiges positive 350 262 09:May-10:May
50H PV Witznitz 50Hertz Erneuerbar negative 350 262 09:May-10:May
Emsland Block C Amprion Konventionell positive 91 182 16:May-18:May
Braunschweig GT TenneT DE Konventionell positive 38 172 15:May-19:May
Kraftwerk Walheim GT D TransnetBW Konventionell positive 85 170 16:May-18:May
50H_MNS_CR_LV_OST 50Hertz Erneuerbar negative 93 162 07:May-08:May
KMW_KW5 Amprion Konventionell positive 78 156 16:May-18:May
Frankfurt West 4 TenneT DE Konventionell positive 68 152 05:May-07:May
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 64 128 16:May-18:May
HAMMUENTROP_20 Amprion Konventionell negative 127 127 19:May-20:May
HUCKINGEN_B Amprion Konventionell positive 75 112 16:May-18:May
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 50 100 15:May-17:May
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 80 100 06:May-08:May
UW Dörpen-West TenneT DE Erneuerbar negative 100 100 12:May-13:May
SW München KW-Pool TenneT DE Sonstiges positive 48 97 16:May-18:May
50H PV Bartow 50Hertz Erneuerbar negative 65 97 06:May-08:May
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 63 94 15:May-16:May
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 30 91 00:May-06:May
Knapsack 1 Amprion Konventionell positive 88 88 16:May-17:May
Kiel (Küstenkraftwerk gesamt) TenneT DE Konventionell negative 67 67 18:May-19:May
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 62 62 16:May-17:May
Börse TransnetBW Sonstiges negative 120 60 15:May-16:May

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.19M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-05-27?

On 2026-05-27, estimated redispatch costs were approximately €0.64 million. This includes €0.19M for renewable curtailment compensation and €0.23M for conventional ramp-up costs.

Which power plants were most affected on 2026-05-27?

The most affected plant was ReserveKW Staudinger 5 (TenneT DE) with 3,738 MWh of positive redispatch.

What was the electricity spot price on 2026-05-27?

The EPEX Day-Ahead spot price for DE_LU ranged from -2 to 171 €/MWh with an average of 84 €/MWh.