← 2026-01-15

Friday, January 16, 2026

2026-01-17 →
2,092MWh Curtailed
2,776MWh Ramped Up
€0.83MEst. Cost
163 MWPeak Positive

Day-Ahead Spot: 67-210 €/MWh (avg 111)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 21 43,864
Amprion positive 19 14,336
TransnetBW positive 14 12,595
50Hertz negative 18 7,991
Amprion negative 3 3,016
TenneT DE positive 3 271
TransnetBW negative 2 102

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
UW Büttel TenneT DE Erneuerbar negative 1456 14,561 05:January-15:January
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 436 4,578 04:January-15:January
UW Dörpen-West TenneT DE Erneuerbar negative 688 4,125 05:January-11:January
Reservekraftwerk Altbach/Deizisau Block 1 TransnetBW Konventionell positive 288 3,745 01:January-14:January
SHN Cluster Heide West T411 T412 TenneT DE Erneuerbar negative 336 3,275 05:January-15:January
Knapsack 1 Amprion Konventionell positive 257 2,182 05:January-13:January
Netzreservekraftwerk Weiher C Amprion Konventionell positive 226 2,150 05:January-15:January
Heizkraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 337 2,024 09:January-15:January
AVA Cluster Ohlensehlen TenneT DE Erneuerbar negative 224 2,019 05:January-14:January
AVA Cluster Elsen TenneT DE Erneuerbar negative 177 1,951 04:January-15:January
WEISWEILER_G Amprion Konventionell positive 237 1,892 04:January-12:January
AVA Cluster Wechold TenneT DE Erneuerbar negative 202 1,871 04:January-14:January
AVA Cluster Twistetal TenneT DE Erneuerbar negative 158 1,739 04:January-15:January
HAMMUENTROP_10 Amprion Konventionell negative 131 1,703 09:January-23:January
Knapsack 1 Amprion Konventionell positive 187 1,638 04:January-12:January
SHN Cluster Husum Nord TenneT DE Erneuerbar negative 320 1,598 09:January-14:January
Rostock Kohlekraftwerk 50Hertz Konventionell negative 188 1,506 05:January-13:January
illwerke vkw AG TransnetBW Sonstiges positive 264 1,449 06:January-14:January
Jänschwalde (Standort) 50Hertz Konventionell negative 229 1,374 05:January-11:January
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 223 1,339 04:January-10:January
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 220 1,320 23:January-05:January
Heizkraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 165 1,318 02:January-13:January
SHN Cluster Heide West T413 TenneT DE Erneuerbar negative 148 1,260 05:January-14:January
Emsland Block B Amprion Konventionell positive 168 1,259 02:January-10:January
SHN Cluster Handewitt T414 T415 TenneT DE Erneuerbar negative 253 1,203 09:January-14:January
AVA Cluster Sottrum T411 T413 TenneT DE Erneuerbar negative 160 1,200 06:January-14:January
Grosskraftwerk Mannheim Block 8 TransnetBW Konventionell positive 202 960 10:January-14:January
Schkopau 50Hertz Konventionell negative 228 910 06:January-10:January
SHN Cluster Klixbüll TenneT DE Erneuerbar negative 189 900 09:January-14:January
WEISWEILER_G Amprion Konventionell positive 167 879 05:January-11:January
Netzreservekraftwerk Weiher C Amprion Konventionell positive 250 750 15:January-18:January
UW Diele TenneT DE Erneuerbar negative 248 745 02:January-05:January
AVA Cluster Lüneburg T413 TenneT DE Erneuerbar negative 90 719 06:January-14:January
UW Emden-Ost TenneT DE Erneuerbar negative 251 690 10:January-13:January
WEISWEILER_H Amprion Konventionell positive 227 681 06:January-09:January
HAMMUENTROP_10 Amprion Konventionell negative 110 658 23:January-05:January
HAMMUENTROP_20 Amprion Konventionell negative 109 655 23:January-05:January
Emsland Block B Amprion Konventionell positive 125 623 06:January-11:January
50H UW Bertikow 50Hertz Erneuerbar negative 200 600 06:January-09:January
NIEDERAUSSEM_G Amprion Konventionell positive 190 569 04:January-07:January
Notfall-RD mit AVA TenneT DE Erneuerbar negative 49 539 04:January-15:January
UW Diele TenneT DE Erneuerbar negative 241 482 05:January-07:January
Grosskraftwerk Mannheim Block 9 TransnetBW Konventionell positive 70 436 00:January-07:January
Emsland Block D Amprion Konventionell positive 197 394 04:January-06:January
Kraftwerk Walheim GT D TransnetBW Konventionell positive 120 360 07:January-10:January
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 174 349 11:January-13:January
NIEDERAUSSEM_G Amprion Konventionell positive 171 342 11:January-13:January
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 190 332 11:January-13:January
WEISWEILER_H Amprion Konventionell positive 91 320 04:January-10:January
Jänschwalde (Standort) 50Hertz Konventionell negative 311 311 11:January-12:January

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.25M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-01-16?

On 2026-01-16, estimated redispatch costs were approximately €0.83 million. This includes €0.21M for renewable curtailment compensation and €0.39M for conventional ramp-up costs.

Which power plants were most affected on 2026-01-16?

The most affected plant was UW Büttel (TenneT DE) with 14,561 MWh of negative redispatch.

What was the electricity spot price on 2026-01-16?

The EPEX Day-Ahead spot price for DE_LU ranged from 67 to 210 €/MWh with an average of 111 €/MWh.