2,340MWh Curtailed
2,384MWh Ramped Up
€0.69MEst. Cost
140 MWPeak Positive
Day-Ahead Spot: 69-155 €/MWh (avg 101)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TransnetBW | positive | 19 | 34,802 |
| TenneT DE | positive | 3 | 24,887 |
| TenneT DE | negative | 7 | 18,610 |
| 50Hertz | negative | 12 | 7,487 |
| Amprion | positive | 6 | 4,765 |
| Amprion | negative | 5 | 3,887 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | positive | 630 | 12,590 | 03:January-23:January |
| Börse | TenneT DE | Sonstiges | positive | 1016 | 12,190 | 23:January-11:January |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 732 | 10,610 | 23:January-13:January |
| Heizkraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 468 | 6,545 | 23:January-13:January |
| UW Dörpen-West | TenneT DE | negative | 953 | 5,716 | 23:January-05:January | |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 | TransnetBW | Konventionell | positive | 225 | 5,410 | 23:January-23:January |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 | TransnetBW | Konventionell | positive | 218 | 3,492 | 07:January-23:January |
| UW Büttel | TenneT DE | negative | 523 | 3,140 | 23:January-05:January | |
| AVA Cluster Voslapp | TenneT DE | negative | 196 | 2,884 | 23:January-14:January | |
| UW Büttel | TenneT DE | negative | 263 | 2,764 | 06:January-23:January | |
| 50H Berlin Mitte | 50Hertz | Konventionell | negative | 143 | 2,143 | 23:January-14:January |
| Emsland Block D | Amprion | Konventionell | positive | 236 | 1,769 | 23:January-06:January |
| UW Dörpen-West | TenneT DE | negative | 166 | 1,573 | 05:January-23:January | |
| Datteln_4 | Amprion | Konventionell | negative | 187 | 1,544 | 23:January-15:January |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 147 | 1,504 | 23:January-10:January |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 74 | 1,398 | 23:January-23:January |
| Kiel (Küstenkraftwerk gesamt) | TenneT DE | Konventionell | negative | 102 | 1,326 | 23:January-12:January |
| Kiel (Küstenkraftwerk gesamt) | TenneT DE | Konventionell | negative | 105 | 1,206 | 03:January-22:January |
| Emsland Block D | Amprion | Konventionell | positive | 245 | 1,102 | 18:January-23:January |
| 50H Berlin Lichterfelde | 50Hertz | Konventionell | negative | 73 | 1,028 | 23:January-16:January |
| NEURATH_F | Amprion | Konventionell | negative | 200 | 1,000 | 00:January-05:January |
| Emsland Block C | Amprion | Konventionell | positive | 190 | 950 | 04:January-09:January |
| Grosskraftwerk Mannheim Block 8 | TransnetBW | Konventionell | positive | 295 | 884 | 20:January-23:January |
| Grosskraftwerk Mannheim Block 9 | TransnetBW | Konventionell | positive | 103 | 824 | 23:January-07:January |
| Reservekraftwerk Marbach GT 3 | TransnetBW | Konventionell | positive | 74 | 810 | 23:January-10:January |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 96 | 794 | 06:January-21:January |
| 50H Berlin Mitte | 50Hertz | Konventionell | negative | 72 | 740 | 00:January-23:January |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 204 | 713 | 19:January-23:January |
| Emsland Block B | Amprion | Konventionell | positive | 130 | 684 | 05:January-11:January |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 | TransnetBW | Konventionell | positive | 152 | 607 | 19:January-23:January |
| Grosskraftwerk Mannheim Block 9 | TransnetBW | Konventionell | positive | 135 | 572 | 04:January-23:January |
| Emsland Block D | Amprion | Konventionell | negative | 142 | 568 | 01:January-16:January |
| 50H Erfurt-Ost HKW GuD | 50Hertz | Konventionell | negative | 33 | 534 | 23:January-19:January |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 131 | 525 | 05:January-09:January |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 | TransnetBW | Konventionell | positive | 112 | 505 | 09:January-23:January |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 133 | 499 | 06:January-21:January |
| KMW_KW3 | Amprion | Konventionell | negative | 77 | 422 | 03:January-10:January |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 111 | 415 | 07:January-23:January |
| NEURATH_F | Amprion | Konventionell | negative | 101 | 353 | 19:January-22:January |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 82 | 246 | 07:January-10:January |
| Heizkraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 77 | 232 | 04:January-10:January |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 109 | 218 | 21:January-23:January |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 170 | 213 | 05:January-09:January |
| Emsland Block C | Amprion | Konventionell | positive | 210 | 210 | 09:January-10:January |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 86 | 194 | 04:January-09:January |
| Grosskraftwerk Mannheim Block 9 | TransnetBW | Konventionell | positive | 83 | 166 | 21:January-23:January |
| 50H Hamburg Wedel1 | 50Hertz | Konventionell | negative | 15 | 165 | 23:January-11:January |
| 50H Halle-Trotha HKW | 50Hertz | Konventionell | negative | 23 | 138 | 01:January-23:January |
| Hohenwarte 2 (Standort) | 50Hertz | Sonstiges | negative | 120 | 120 | 09:January-10:January |
| SW München KW-Pool | TenneT DE | Sonstiges | positive | 71 | 107 | 05:January-07:January |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.21M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-01-15?
On 2026-01-15, estimated redispatch costs were approximately €0.69 million. This includes €0.23M for renewable curtailment compensation and €0.31M for conventional ramp-up costs.
Which power plants were most affected on 2026-01-15?
The most affected plant was Börse (TenneT DE) with 12,590 MWh of positive redispatch.
What was the electricity spot price on 2026-01-15?
The EPEX Day-Ahead spot price for DE_LU ranged from 69 to 155 €/MWh with an average of 101 €/MWh.