← 2026-06-24

Thursday, June 25, 2026

2026-06-26 →
2,566MWh Curtailed
3,297MWh Ramped Up
€1.06MEst. Cost
365 MWPeak Positive

Day-Ahead Spot: 23-363 €/MWh (avg 131)

TSO Breakdown

TSODirectionMeasuresTotal MWh
50Hertz negative 25 11,241
TenneT DE negative 13 9,603
Amprion positive 6 2,385
TenneT DE positive 5 2,326
Amprion negative 7 2,106
TransnetBW positive 5 917
50Hertz positive 7 686
TransnetBW negative 1 224

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 300 2,325 07:June-15:June
BAG NWAK-Cluster 14 Schwandorf TenneT DE Erneuerbar negative 300 1,725 09:June-15:June
Boxberg (Standort) 50Hertz Konventionell negative 529 1,586 06:June-09:June
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,550 07:June-15:June
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 200 1,550 07:June-15:June
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 226 1,471 07:June-13:June
50H_AVA_CR_STW 50Hertz Erneuerbar negative 215 1,452 07:June-13:June
50H PV Witznitz 50Hertz Erneuerbar negative 203 1,368 07:June-14:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 336 1,342 05:June-09:June
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 300 1,200 08:June-12:June
50H_TEN_CR_M2_VIB 50Hertz Erneuerbar negative 263 988 09:June-13:June
Emsland Block C Amprion Konventionell positive 248 931 06:June-10:June
illwerke vkw AG TransnetBW Sonstiges positive 183 687 05:June-16:June
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 149 672 07:June-12:June
Datteln_4 Amprion Konventionell negative 260 650 14:June-16:June
Irsching 4 TenneT DE Konventionell negative 269 605 14:June-17:June
Hannover-Linden GuD TenneT DE Konventionell positive 76 552 07:June-15:June
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 132 530 07:June-11:June
50H_MNS_CR_LAU_Nord 50Hertz Erneuerbar negative 140 525 09:June-13:June
Hannover-Linden GuD TenneT DE Konventionell positive 83 522 06:June-13:June
50H_MNS_CR_KLM 50Hertz Erneuerbar negative 94 495 08:June-13:June
Schkopau 50Hertz Konventionell positive 157 470 17:June-20:June
WEISWEILER_G Amprion Konventionell positive 150 450 08:June-11:June
HAMMUENTROP_20 Amprion Konventionell positive 356 446 07:June-09:June
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 122 397 07:June-11:June
NEURATH_F Amprion Konventionell negative 175 350 13:June-15:June
NEURATH_G Amprion Konventionell negative 175 350 13:June-15:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 86 342 07:June-17:June
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 55 274 06:June-14:June
GUD_HERNE_6 Amprion Konventionell negative 250 250 15:June-16:June
Börse TransnetBW Sonstiges negative 90 224 06:June-16:June
AVA Cluster Helmstedt TenneT DE Erneuerbar negative 41 213 08:June-14:June
BAG NWAK-Cluster 04 Aschaffenburg TenneT DE Erneuerbar negative 50 200 08:June-12:June
NIEDERAUSSEM_K Amprion Konventionell negative 94 188 13:June-15:June
NIEHL-31-GUD Amprion Konventionell negative 90 180 14:June-16:June
50H OWP Wikinger 50Hertz Erneuerbar negative 58 174 08:June-11:June
WEISWEILER_G Amprion Konventionell positive 99 173 06:June-08:June
Jänschwalde (Standort) 50Hertz Konventionell negative 53 158 07:June-17:June
WALSUM_10 Amprion Konventionell negative 138 138 15:June-16:June
50H Berlin Marzahn 50Hertz Konventionell negative 46 137 06:June-09:June
50H OWP Arkona 50Hertz Erneuerbar negative 43 129 08:June-11:June
Heizkraftwerk Stuttgart-Münster GT 88 TransnetBW Konventionell positive 60 120 06:June-08:June
NIEHL-31-GUD Amprion Konventionell positive 111 111 08:June-09:June
Boxberg (Standort) 50Hertz Konventionell negative 37 111 14:June-17:June
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 30 105 10:June-13:June
Schkopau 50Hertz Konventionell positive 101 101 06:June-07:June
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 100 100 12:June-13:June
50H UW Bertikow 50Hertz Erneuerbar negative 24 94 08:June-12:June
50H_EDIS_CR_HND 50Hertz Erneuerbar negative 20 80 09:June-13:June
illwerke vkw AG TransnetBW Sonstiges positive 61 61 19:June-20:June

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.32M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-06-25?

On 2026-06-25, estimated redispatch costs were approximately €1.06 million. This includes €0.26M for renewable curtailment compensation and €0.53M for conventional ramp-up costs.

Which power plants were most affected on 2026-06-25?

The most affected plant was BAG NWAK-Cluster 15 Pleinting (TenneT DE) with 2,325 MWh of negative redispatch.

What was the electricity spot price on 2026-06-25?

The EPEX Day-Ahead spot price for DE_LU ranged from 23 to 363 €/MWh with an average of 131 €/MWh.