← 2026-03-18

Thursday, March 19, 2026

2026-03-20 →
2,877MWh Curtailed
2,427MWh Ramped Up
€0.75MEst. Cost
225 MWPeak Positive

Day-Ahead Spot: 0-241 €/MWh (avg 115)

TSO Breakdown

TSODirectionMeasuresTotal MWh
50Hertz negative 27 6,053
TenneT DE positive 11 2,640
Amprion positive 4 1,827
TenneT DE negative 3 1,698
Amprion negative 3 304
50Hertz positive 1 100
TransnetBW negative 1 79
TransnetBW positive 1 33

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Emsland Block D Amprion Konventionell positive 619 1,083 07:March-09:March
50H_AVA_CR_STW 50Hertz Erneuerbar negative 243 730 08:March-11:March
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 150 712 09:March-14:March
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 150 712 09:March-14:March
Jänschwalde (Standort) 50Hertz Konventionell negative 353 707 07:March-09:March
Niederrad 1 TenneT DE Konventionell positive 42 635 08:March-23:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 200 600 06:March-09:March
50H PV Witznitz 50Hertz Erneuerbar negative 166 541 08:March-11:March
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 189 520 08:March-10:March
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 165 494 08:March-11:March
Boxberg (Standort) 50Hertz Konventionell negative 240 480 07:March-09:March
Linden GKL GT 1 TenneT DE Konventionell positive 60 450 03:March-11:March
STUMMHAFEN_10 Amprion Konventionell positive 175 394 08:March-11:March
Jänschwalde (Standort) 50Hertz Konventionell negative 43 389 14:March-23:March
50H_AVA_CR_FOE 50Hertz Erneuerbar negative 129 354 08:March-10:March
50H PV Witznitz 50Hertz Erneuerbar negative 56 335 08:March-14:March
Linden GKL GT 3 TenneT DE Konventionell positive 55 330 05:March-11:March
50H Berlin Marzahn 50Hertz Konventionell negative 62 311 05:March-10:March
50H Berlin Mitte 50Hertz Konventionell negative 74 294 05:March-09:March
Linden GKL DT TenneT DE Konventionell positive 47 292 04:March-11:March
Börse TenneT DE Sonstiges negative 136 273 09:March-11:March
NIEHL-II Amprion Konventionell positive 166 208 07:March-09:March
50H PV Bartow 50Hertz Erneuerbar negative 83 165 09:March-11:March
NEURATH_G Amprion Konventionell negative 67 151 07:March-10:March
WALSUM_10 Amprion Konventionell positive 81 142 08:March-09:March
NEURATH_F Amprion Konventionell negative 53 119 07:March-10:March
SW München KW-Pool TenneT DE Sonstiges positive 49 111 05:March-08:March
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 70 104 08:March-10:March
50H_EDIS_CR_PE 50Hertz Erneuerbar negative 100 100 09:March-10:March
50H_MNS_CR_JSN 50Hertz Erneuerbar negative 100 100 09:March-10:March
50H Berlin Reuter West 50Hertz Konventionell positive 25 100 05:March-09:March
50H_MNS_CR_KLM 50Hertz Erneuerbar negative 100 100 09:March-10:March
Frankfurt West 3 TenneT DE Konventionell positive 7 89 08:March-21:March
Börse TransnetBW Sonstiges negative 32 79 03:March-07:March
Braunschweig HKWN GT TenneT DE Konventionell positive 20 61 07:March-10:March
50H Neubrandenburg GuD 50Hertz Konventionell negative 18 53 07:March-10:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 50 50 09:March-10:March
50H InfraLeuna IKW 50Hertz Konventionell negative 23 46 08:March-10:March
50H Erfurt-Ost HKW GuD 50Hertz Konventionell negative 15 46 07:March-10:March
Braunschweig DT TenneT DE Konventionell positive 11 37 08:March-11:March
Braunschweig GT TenneT DE Konventionell positive 18 36 09:March-11:March
STUMMHAFEN_10 Amprion Konventionell negative 137 34 07:March-08:March
Börse TransnetBW Sonstiges positive 13 33 06:March-10:March
50H Berlin Lichterfelde 50Hertz Konventionell negative 10 30 06:March-09:March
Boxberg (Standort) 50Hertz Konventionell negative 30 30 09:March-10:March
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 25 25 09:March-10:March
50H UW Bertikow 50Hertz Erneuerbar negative 14 14 09:March-10:March
50H OWP Wikinger 50Hertz Erneuerbar negative 12 12 09:March-10:March
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 11 11 09:March-10:March
Börse 50Hertz Sonstiges negative 18 5 15:March-16:March

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.23M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-03-19?

On 2026-03-19, estimated redispatch costs were approximately €0.75 million. This includes €0.29M for renewable curtailment compensation and €0.35M for conventional ramp-up costs.

Which power plants were most affected on 2026-03-19?

The most affected plant was Emsland Block D (Amprion) with 1,083 MWh of positive redispatch.

What was the electricity spot price on 2026-03-19?

The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 241 €/MWh with an average of 115 €/MWh.