← 2026-03-19

Friday, March 20, 2026

2026-03-21 →
2,981MWh Curtailed
2,847MWh Ramped Up
€0.88MEst. Cost
207 MWPeak Positive

Day-Ahead Spot: 50-261 €/MWh (avg 150)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 6 5,381
TenneT DE positive 6 3,988
50Hertz negative 6 960
Amprion positive 1 288
Amprion negative 1 50

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges negative 212 2,435 23:March-23:March
Irsching 5 TenneT DE Konventionell positive 242 2,295 23:March-08:March
Niederrad 1 TenneT DE Konventionell positive 31 744 23:March-23:March
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 150 712 09:March-14:March
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 150 712 09:March-14:March
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 150 712 09:March-14:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 45 678 08:March-23:March
Niederrad 1 TenneT DE Konventionell positive 40 597 08:March-23:March
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 31 558 23:March-23:March
HAMMUENTROP_10 Amprion Konventionell positive 164 288 07:March-09:March
Börse TenneT DE Sonstiges negative 201 251 21:March-23:March
Irsching 5 TenneT DE Konventionell positive 201 251 21:March-23:March
Schkopau 50Hertz Konventionell negative 174 174 08:March-09:March
Frankfurt West 3 TenneT DE Konventionell positive 7 81 08:March-19:March
50H Berlin Marzahn 50Hertz Konventionell negative 30 60 08:March-10:March
STUMMHAFEN_10 Amprion Konventionell negative 33 50 07:March-09:March
Jänschwalde (Standort) 50Hertz Konventionell negative 48 24 08:March-09:March
Eltmann TenneT DE Konventionell positive 26 20 09:March-10:March
Börse 50Hertz Sonstiges negative 28 14 21:March-22:March
Börse 50Hertz Sonstiges negative 42 10 23:March-23:March

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.26M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-03-20?

On 2026-03-20, estimated redispatch costs were approximately €0.88 million. This includes €0.3M for renewable curtailment compensation and €0.51M for conventional ramp-up costs.

Which power plants were most affected on 2026-03-20?

The most affected plant was Börse (TenneT DE) with 2,435 MWh of negative redispatch.

What was the electricity spot price on 2026-03-20?

The EPEX Day-Ahead spot price for DE_LU ranged from 50 to 261 €/MWh with an average of 150 €/MWh.