← 2026-03-17

Wednesday, March 18, 2026

2026-03-19 →
2,643MWh Curtailed
1,956MWh Ramped Up
€0.66MEst. Cost
180 MWPeak Positive

Day-Ahead Spot: -3-193 €/MWh (avg 90)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 12 5,094
50Hertz negative 15 2,020
TransnetBW positive 4 1,997
TransnetBW negative 2 1,938
TenneT DE positive 10 1,176
50Hertz positive 5 264
Amprion positive 1 135

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TransnetBW Sonstiges negative 244 1,889 05:March-13:March
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 244 1,889 05:March-13:March
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 300 1,650 09:March-15:March
50H PV Witznitz 50Hertz Erneuerbar negative 205 1,232 09:March-15:March
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,100 09:March-15:March
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 100 550 09:March-15:March
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 40 486 03:March-23:March
ReserveKW Plattling TenneT DE Konventionell positive 30 296 23:March-09:March
50H PV Bartow 50Hertz Erneuerbar negative 71 285 09:March-13:March
UW Diele TenneT DE Erneuerbar negative 49 272 09:March-14:March
Frankfurt West 4 TenneT DE Konventionell positive 60 240 09:March-13:March
Börse TenneT DE Sonstiges negative 28 230 13:March-23:March
Börse TenneT DE Sonstiges negative 30 222 23:March-07:March
ReserveKW Plattling TenneT DE Konventionell positive 28 220 13:March-23:March
UW Büttel TenneT DE Erneuerbar negative 205 205 05:March-06:March
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 59 162 04:March-16:March
Börse TenneT DE Sonstiges negative 90 135 04:March-06:March
GUD_HERNE_6 Amprion Konventionell positive 68 135 03:March-05:March
Frankfurt West 3 TenneT DE Konventionell positive 12 123 06:March-21:March
Schkopau 50Hertz Konventionell positive 104 104 04:March-05:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 44 88 07:March-09:March
Linden GKL GT 3 TenneT DE Konventionell positive 42 85 04:March-06:March
Linden GKL GT 1 TenneT DE Konventionell positive 42 85 04:March-06:March
Börse TenneT DE Sonstiges negative 142 71 12:March-12:March
50H PV Bartow 50Hertz Erneuerbar negative 28 70 12:March-15:March
illwerke vkw AG TransnetBW Sonstiges positive 32 65 05:March-07:March
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 22 56 12:March-15:March
50H InfraLeuna IKW 50Hertz Konventionell positive 28 55 05:March-07:March
50H Berlin Mitte 50Hertz Konventionell positive 51 51 05:March-06:March
50H Berlin Reuter West 50Hertz Konventionell positive 25 50 05:March-07:March
Boxberg (Standort) 50Hertz Konventionell negative 50 50 15:March-16:March
Börse TransnetBW Sonstiges negative 22 48 04:March-14:March
50H OWP Arkona 50Hertz Erneuerbar negative 16 48 12:March-15:March
Niederrad 1 TenneT DE Konventionell positive 14 41 05:March-10:March
50H UW Schönewalde 50Hertz Erneuerbar negative 16 40 12:March-15:March
Börse TransnetBW Sonstiges positive 31 39 03:March-07:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 70 35 06:March-06:March
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 10 32 12:March-15:March
Erzhausen 1 TenneT DE Sonstiges positive 57 28 12:March-12:March
Erzhausen 2 TenneT DE Sonstiges positive 57 28 12:March-12:March
Erzhausen 4 TenneT DE Sonstiges positive 57 28 12:March-12:March
50H Berlin Marzahn 50Hertz Konventionell negative 25 25 07:March-08:March
50H Hamburg Wedel1 50Hertz Konventionell negative 10 21 05:March-10:March
50H UW Bertikow 50Hertz Erneuerbar negative 11 14 12:March-14:March
50H Erfurt-Ost HKW GuD 50Hertz Konventionell negative 7 14 13:March-15:March
50H OWP Wikinger 50Hertz Erneuerbar negative 4 10 12:March-15:March
Hannover (GKH) 2 TenneT DE Konventionell negative 10 10 14:March-15:March
illwerke vkw AG TransnetBW Sonstiges positive 16 4 08:March-09:March
50H Berlin Marzahn 50Hertz Konventionell positive 4 4 05:March-06:March

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.2M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-03-18?

On 2026-03-18, estimated redispatch costs were approximately €0.66 million. This includes €0.26M for renewable curtailment compensation and €0.23M for conventional ramp-up costs.

Which power plants were most affected on 2026-03-18?

The most affected plant was Börse (TransnetBW) with 1,889 MWh of negative redispatch.

What was the electricity spot price on 2026-03-18?

The EPEX Day-Ahead spot price for DE_LU ranged from -3 to 193 €/MWh with an average of 90 €/MWh.