← 2026-03-16

Tuesday, March 17, 2026

2026-03-18 →
2,597MWh Curtailed
2,706MWh Ramped Up
€0.78MEst. Cost
219 MWPeak Positive

Day-Ahead Spot: 87-232 €/MWh (avg 126)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE positive 9 3,268
TransnetBW positive 5 1,564
50Hertz negative 10 1,433
TransnetBW negative 2 827
Amprion positive 4 614
TenneT DE negative 2 319
50Hertz positive 1 2

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 399 1,197 06:March-23:March
Niederrad 1 TenneT DE Konventionell positive 39 934 23:March-23:March
Börse TransnetBW Sonstiges negative 85 782 05:March-15:March
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 85 782 05:March-15:March
illwerke vkw AG TransnetBW Sonstiges positive 316 632 08:March-10:March
Irsching 5 TenneT DE Konventionell positive 172 431 07:March-10:March
Lippendorf 50Hertz Konventionell negative 300 300 08:March-09:March
Lippendorf 50Hertz Konventionell negative 180 270 07:March-09:March
Emsland Block D Amprion Konventionell positive 245 245 20:March-21:March
50H Berlin Marzahn 50Hertz Konventionell negative 78 234 07:March-10:March
SW München KW-Pool TenneT DE Sonstiges positive 85 212 19:March-21:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 200 200 09:March-10:March
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 20 189 08:March-18:March
LAUSWARD_GUDF Amprion Konventionell positive 75 150 07:March-09:March
ReserveKW Plattling TenneT DE Konventionell positive 26 130 13:March-18:March
Börse TenneT DE Sonstiges negative 26 130 13:March-18:March
LAUSWARD_GUDF Amprion Konventionell positive 128 128 09:March-10:March
Lippendorf 50Hertz Konventionell negative 30 120 23:March-03:March
SW München KW-Pool TenneT DE Sonstiges positive 76 114 07:March-09:March
Frankfurt West 3 TenneT DE Konventionell positive 10 99 08:March-18:March
Niederrad 1 TenneT DE Konventionell positive 16 99 09:March-15:March
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 61 91 07:March-09:March
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 91 91 08:March-09:March
Schkopau 50Hertz Konventionell negative 86 86 08:March-09:March
50H Erfurt-Ost HKW GuD 50Hertz Konventionell negative 28 83 07:March-10:March
Boxberg (Standort) 50Hertz Konventionell negative 56 56 08:March-09:March
Eltmann TenneT DE Konventionell positive 26 52 08:March-10:March
50H InfraLeuna IKW 50Hertz Konventionell negative 23 46 08:March-10:March
Börse TransnetBW Sonstiges negative 30 45 08:March-21:March
50H Berlin Lichterfelde 50Hertz Konventionell negative 19 38 08:March-10:March
Börse TransnetBW Sonstiges positive 21 36 08:March-20:March
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 45 22 08:March-08:March
50H Berlin Lichterfelde 50Hertz Konventionell positive 2 2 19:March-20:March

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.23M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-03-17?

On 2026-03-17, estimated redispatch costs were approximately €0.78 million. This includes €0.26M for renewable curtailment compensation and €0.42M for conventional ramp-up costs.

Which power plants were most affected on 2026-03-17?

The most affected plant was Börse (TenneT DE) with 1,197 MWh of positive redispatch.

What was the electricity spot price on 2026-03-17?

The EPEX Day-Ahead spot price for DE_LU ranged from 87 to 232 €/MWh with an average of 126 €/MWh.