Monday, March 16, 2026

2026-03-17 →
2,282MWh Curtailed
1,821MWh Ramped Up
€0.72MEst. Cost
185 MWPeak Positive

Day-Ahead Spot: 38-185 €/MWh (avg 96)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 5 1,324
TenneT DE positive 3 240
50Hertz negative 1 221
TransnetBW positive 1 132

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
SHN Cluster Heide West T411 T412 TenneT DE Erneuerbar negative 142 462 12:March-15:March
SHN Cluster Handewitt T414 T415 TenneT DE Erneuerbar negative 100 400 12:March-16:March
AVA Cluster Lehrte TenneT DE Erneuerbar negative 50 338 00:March-07:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 28 221 09:March-17:March
Niederrad 1 TenneT DE Konventionell positive 24 191 09:March-17:March
illwerke vkw AG TransnetBW Sonstiges positive 75 132 04:March-06:March
SHN Cluster Kiel Süd TenneT DE Erneuerbar negative 50 100 14:March-16:March
Frankfurt West 3 TenneT DE Konventionell positive 8 30 10:March-14:March
Börse TenneT DE Sonstiges negative 19 24 13:March-14:March
ReserveKW Plattling TenneT DE Konventionell positive 19 19 13:March-14:March

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.22M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-03-16?

On 2026-03-16, estimated redispatch costs were approximately €0.72 million. This includes €0.23M for renewable curtailment compensation and €0.23M for conventional ramp-up costs.

Which power plants were most affected on 2026-03-16?

The most affected plant was SHN Cluster Heide West T411 T412 (TenneT DE) with 462 MWh of negative redispatch.

What was the electricity spot price on 2026-03-16?

The EPEX Day-Ahead spot price for DE_LU ranged from 38 to 185 €/MWh with an average of 96 €/MWh.