3,597MWh Curtailed
4,924MWh Ramped Up
€1.74MEst. Cost
391 MWPeak Positive
Day-Ahead Spot: 114-391 €/MWh (avg 198)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| Amprion | positive | 24 | 27,302 |
| 50Hertz | negative | 37 | 21,497 |
| TenneT DE | negative | 15 | 19,447 |
| TransnetBW | positive | 17 | 14,694 |
| TransnetBW | negative | 2 | 4,146 |
| Amprion | negative | 10 | 3,659 |
| TenneT DE | positive | 10 | 1,592 |
| 50Hertz | positive | 1 | 9 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| WEISWEILER_H | Amprion | Konventionell | positive | 382 | 8,986 | 22:September-22:September |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 345 | 4,491 | 03:September-16:September |
| Irsching 4 | TenneT DE | Konventionell | negative | 312 | 3,663 | 04:September-16:September |
| BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt | TenneT DE | negative | 600 | 3,600 | 08:September-14:September | |
| Börse | TransnetBW | Sonstiges | negative | 144 | 3,446 | 22:September-22:September |
| Lippendorf | 50Hertz | Konventionell | negative | 211 | 2,850 | 00:September-16:September |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 301 | 2,484 | 06:September-15:September |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 175 | 2,449 | 01:September-15:September |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 97 | 2,326 | 22:September-22:September |
| WEISWEILER_G | Amprion | Konventionell | positive | 256 | 2,114 | 07:September-15:September |
| WEISWEILER_H | Amprion | Konventionell | positive | 275 | 1,994 | 07:September-14:September |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 220 | 1,872 | 06:September-15:September |
| LAUSWARD_GUDF | Amprion | Konventionell | positive | 290 | 1,812 | 08:September-14:September |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 300 | 1,800 | 08:September-14:September | |
| 50H_EDIS_CR_SOW_Sued | 50Hertz | negative | 217 | 1,519 | 06:September-13:September | |
| Irsching 5 | TenneT DE | Konventionell | negative | 242 | 1,513 | 09:September-15:September |
| BAG NWAK-Cluster 02 Oberhaid-Redwitz | TenneT DE | negative | 300 | 1,425 | 09:September-14:September | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 300 | 1,425 | 09:September-14:September | |
| BAG NWAK-Cluster 01 Mechlenreuth | TenneT DE | negative | 300 | 1,425 | 09:September-14:September | |
| Emsland Block B | Amprion | Konventionell | positive | 192 | 1,347 | 09:September-16:September |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 214 | 1,340 | 07:September-14:September |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 137 | 1,331 | 04:September-18:September |
| 50H_AVA_CR_WOL | 50Hertz | negative | 221 | 1,324 | 08:September-14:September | |
| 50H PV Witznitz | 50Hertz | negative | 197 | 1,280 | 07:September-14:September | |
| 50H OWP Arkona | 50Hertz | negative | 249 | 1,244 | 08:September-13:September | |
| Grosskraftwerk Mannheim Block 6 | TransnetBW | Konventionell | positive | 107 | 1,235 | 10:September-22:September |
| 50H OWP Baltic Eagle | 50Hertz | negative | 203 | 1,216 | 08:September-14:September | |
| UW Büttel | TenneT DE | negative | 186 | 1,116 | 00:September-06:September | |
| Emsland Block B | Amprion | Konventionell | positive | 186 | 1,116 | 00:September-06:September |
| LAUSWARD_GUDF | Amprion | Konventionell | negative | 155 | 1,010 | 22:September-05:September |
| BAG NWAK-Cluster 05 Kriegenbrunn-Ludersheim | TenneT DE | negative | 200 | 950 | 09:September-14:September | |
| BAG NWAK-Cluster 06 Raitersaich | TenneT DE | negative | 200 | 950 | 09:September-14:September | |
| 50H_AVA_CR_STW | 50Hertz | negative | 253 | 950 | 10:September-13:September | |
| Lippendorf | 50Hertz | Konventionell | negative | 188 | 941 | 05:September-10:September |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 247 | 926 | 09:September-13:September |
| 50H_TEN_CR_S1_ATF | 50Hertz | negative | 185 | 925 | 09:September-14:September | |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 182 | 910 | 09:September-14:September |
| GERSTEINW_DTG2 (KapRes) | Amprion | Konventionell | positive | 129 | 906 | 10:September-17:September |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 274 | 891 | 09:September-12:September |
| 50H OWP Wikinger | 50Hertz | negative | 175 | 873 | 08:September-13:September | |
| LAUSWARD_GUDF | Amprion | Konventionell | positive | 129 | 839 | 08:September-14:September |
| 50H OWP Windanker | 50Hertz | negative | 167 | 833 | 08:September-13:September | |
| KNAPSACK_20 | Amprion | Konventionell | positive | 273 | 818 | 11:September-14:September |
| WALSUM_10 | Amprion | Konventionell | negative | 133 | 766 | 12:September-17:September |
| Börse | TransnetBW | Sonstiges | negative | 78 | 700 | 10:September-22:September |
| 50H UW Bertikow | 50Hertz | negative | 113 | 676 | 08:September-14:September | |
| 50H OWP Arcadis Ost 1 | 50Hertz | negative | 115 | 574 | 08:September-13:September | |
| GERSTEINW_GTG1 (KapRes) | Amprion | Konventionell | positive | 41 | 547 | 04:September-17:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 154 | 538 | 06:September-14:September |
| Emsland Block D | Amprion | Konventionell | negative | 48 | 530 | 04:September-17:September |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.52M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-09-28?
On 2026-09-28, estimated redispatch costs were approximately €1.74 million. This includes €0.36M for renewable curtailment compensation and €1.12M for conventional ramp-up costs.
Which power plants were most affected on 2026-09-28?
The most affected plant was WEISWEILER_H (Amprion) with 8,986 MWh of positive redispatch.
What was the electricity spot price on 2026-09-28?
The EPEX Day-Ahead spot price for DE_LU ranged from 114 to 391 €/MWh with an average of 198 €/MWh.