← 2026-08-31

Tuesday, September 1, 2026

2026-09-02 →
3,398MWh Curtailed
3,663MWh Ramped Up
€1.22MEst. Cost
239 MWPeak Positive

Day-Ahead Spot: 22-237 €/MWh (avg 145)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 19 23,306
Amprion positive 19 16,699
50Hertz negative 22 8,142
TenneT DE positive 7 4,606
TransnetBW negative 3 3,537
TransnetBW positive 5 1,965
Amprion negative 4 581

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
UW Dörpen-West TenneT DE Erneuerbar negative 299 4,337 04:September-18:September
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 531 4,247 14:September-22:September
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 390 3,895 22:September-08:September
UW Diele TenneT DE Erneuerbar negative 274 3,840 04:September-18:September
Börse TenneT DE Sonstiges positive 681 3,234 03:September-17:September
Grosskraftwerk Mannheim Block 9 TransnetBW Konventionell negative 167 2,964 22:September-22:September
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 259 2,329 22:September-07:September
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 313 2,266 14:September-22:September
WEISWEILER_G Amprion Konventionell positive 172 2,148 07:September-22:September
illwerke vkw AG TransnetBW Sonstiges positive 172 1,719 22:September-08:September
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,700 07:September-16:September
Emsland Block C Amprion Konventionell positive 210 1,470 22:September-05:September
Emsland Block B Amprion Konventionell positive 210 1,470 22:September-05:September
Emsland Block C Amprion Konventionell positive 178 1,425 08:September-16:September
AVA Cluster Voslapp TenneT DE Erneuerbar negative 169 1,269 09:September-17:September
Rostock Kohlekraftwerk 50Hertz Konventionell negative 155 1,241 00:September-08:September
50H_EDIS_CR_WU_NORD 50Hertz Erneuerbar negative 178 1,069 08:September-14:September
Boxberg (Standort) 50Hertz Konventionell negative 322 966 02:September-16:September
Jänschwalde (Standort) 50Hertz Konventionell negative 219 876 02:September-09:September
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 100 850 07:September-16:September
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 100 850 07:September-16:September
WEISWEILER_H Amprion Konventionell positive 155 812 00:September-11:September
WEISWEILER_G Amprion Konventionell positive 167 795 04:September-09:September
NIEDERAUSSEM_K Amprion Konventionell positive 202 758 10:September-14:September
GUD_HERNE_6 Amprion Konventionell positive 254 698 12:September-15:September
Börse 50Hertz Sonstiges negative 152 646 10:September-14:September
UW Dörpen-West TenneT DE Erneuerbar negative 108 645 22:September-04:September
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 213 640 07:September-15:September
SW München KW-Pool TenneT DE Sonstiges positive 148 516 22:September-01:September
Boxberg (Standort) 50Hertz Konventionell negative 200 450 09:September-17:September
Emsland Block B Amprion Konventionell positive 210 420 04:September-06:September
STUMMHAFEN_10 Amprion Konventionell positive 158 396 08:September-12:September
BIBLIS_GT (bnBm) Amprion Konventionell positive 189 378 11:September-14:September
Emsland Block C Amprion Konventionell positive 249 374 08:September-10:September
UW Büttel TenneT DE Erneuerbar negative 123 369 04:September-07:September
Boxberg (Standort) 50Hertz Konventionell negative 175 350 07:September-09:September
Börse TransnetBW Sonstiges negative 196 344 13:September-18:September
50H_EDIS_CR_EH 50Hertz Erneuerbar negative 205 308 13:September-15:September
UW Büttel TenneT DE Erneuerbar negative 201 301 18:September-20:September
UW Diele TenneT DE Erneuerbar negative 93 280 22:September-01:September
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 135 270 08:September-10:September
Börse TenneT DE Sonstiges positive 262 262 18:September-19:September
Emsland Block B Amprion Konventionell positive 210 262 20:September-22:September
50H OWP Arkona 50Hertz Erneuerbar negative 129 258 08:September-10:September
AVA Cluster Helmstedt TenneT DE Erneuerbar negative 100 250 09:September-12:September
WALSUM_10 Amprion Konventionell negative 122 244 18:September-21:September
Irsching 5 TenneT DE Konventionell positive 97 242 22:September-00:September
UW Höpfingen TransnetBW Erneuerbar negative 58 230 08:September-12:September
HUCKINGEN_B Amprion Konventionell positive 100 200 16:September-18:September
HUCKINGEN_A Amprion Konventionell positive 100 200 16:September-18:September

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.37M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-09-01?

On 2026-09-01, estimated redispatch costs were approximately €1.22 million. This includes €0.34M for renewable curtailment compensation and €0.64M for conventional ramp-up costs.

Which power plants were most affected on 2026-09-01?

The most affected plant was UW Dörpen-West (TenneT DE) with 4,337 MWh of negative redispatch.

What was the electricity spot price on 2026-09-01?

The EPEX Day-Ahead spot price for DE_LU ranged from 22 to 237 €/MWh with an average of 145 €/MWh.