3,021MWh Curtailed
3,305MWh Ramped Up
€1.01MEst. Cost
218 MWPeak Positive
Day-Ahead Spot: 1-222 €/MWh (avg 123)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 7 | 7,596 |
| Amprion | negative | 7 | 5,469 |
| Amprion | positive | 8 | 5,110 |
| 50Hertz | negative | 12 | 4,091 |
| TransnetBW | positive | 7 | 1,816 |
| TenneT DE | positive | 1 | 180 |
| 50Hertz | positive | 5 | 179 |
| TransnetBW | negative | 1 | 12 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Datteln_4 | Amprion | Konventionell | negative | 149 | 2,572 | 22:July-18:July |
| GERSTEINW_DTG2 (KapRes) | Amprion | Konventionell | positive | 107 | 2,172 | 22:July-18:July |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 250 | 2,125 | 07:July-16:July | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 250 | 2,125 | 07:July-16:July | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 257 | 1,608 | 02:July-08:July |
| Datteln_4 | Amprion | Konventionell | negative | 116 | 1,478 | 08:July-22:July |
| NEURATH_F | Amprion | Konventionell | negative | 216 | 1,132 | 03:July-08:July |
| 50H PV Witznitz | 50Hertz | negative | 300 | 900 | 11:July-14:July | |
| GERSTEINW_GTG1 (KapRes) | Amprion | Konventionell | positive | 42 | 850 | 22:July-18:July |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 850 | 07:July-16:July | |
| Emsland Block B | Amprion | Konventionell | positive | 150 | 822 | 03:July-09:July |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 270 | 810 | 11:July-14:July |
| Schkopau | 50Hertz | Konventionell | negative | 159 | 714 | 03:July-08:July |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 210 | 630 | 06:July-09:July |
| Lippendorf | 50Hertz | Konventionell | negative | 203 | 608 | 05:July-08:July |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 120 | 540 | 04:July-09:July |
| 50H PV Bartow | 50Hertz | negative | 118 | 500 | 08:July-13:July | |
| WEISWEILER_G | Amprion | Konventionell | positive | 191 | 429 | 06:July-08:July |
| AVA Cluster Voslapp | TenneT DE | negative | 150 | 338 | 05:July-07:July | |
| WEISWEILER_H | Amprion | Konventionell | positive | 168 | 337 | 07:July-09:July |
| UW Büttel | TenneT DE | negative | 300 | 300 | 17:July-18:July | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 300 | 300 | 17:July-18:July |
| WEISWEILER_H | Amprion | Konventionell | positive | 127 | 254 | 06:July-08:July |
| AVA Cluster Helmstedt | TenneT DE | negative | 100 | 250 | 14:July-16:July | |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 96 | 216 | 12:July-15:July |
| 50H_EDIS_CR_SOW_Sued | 50Hertz | negative | 50 | 212 | 08:July-13:July | |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 200 | 200 | 07:July-08:July |
| STUMMHAFEN_10 | Amprion | Konventionell | negative | 241 | 181 | 15:July-15:July |
| Braunschweig HKWM GT31 | TenneT DE | Konventionell | positive | 40 | 180 | 04:July-09:July |
| 50H OWP Baltic Eagle | 50Hertz | negative | 165 | 165 | 08:July-09:July | |
| Heizkraftwerk_Pforzheim | TransnetBW | Konventionell | positive | 30 | 90 | 11:July-14:July |
| NEURATH_G | Amprion | Konventionell | negative | 39 | 78 | 07:July-09:July |
| 50H_EDIS_CR_PAS | 50Hertz | negative | 50 | 75 | 19:July-21:July | |
| Heizkraftwerk_Pforzheim | TransnetBW | Konventionell | positive | 23 | 69 | 04:July-07:July |
| 50H Berlin Lichterfelde | 50Hertz | Konventionell | positive | 52 | 52 | 07:July-08:July |
| Thyrow D (SysRel) | 50Hertz | Konventionell | positive | 21 | 43 | 06:July-08:July |
| 50H Dresden-Reick | 50Hertz | Konventionell | positive | 20 | 39 | 05:July-07:July |
| 50H PV Witznitz | 50Hertz | negative | 31 | 38 | 08:July-09:July | |
| 50H Chemnitz | 50Hertz | Konventionell | positive | 19 | 38 | 05:July-07:July |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 12 | 37 | 00:July-03:July |
| KMW_KW5 | Amprion | Konventionell | positive | 10 | 30 | 04:July-07:July |
| NIEDERAUSSEM_H | Amprion | Konventionell | negative | 80 | 20 | 14:July-15:July |
| illwerke vkw AG | TransnetBW | Sonstiges | negative | 10 | 12 | 12:July-14:July |
| Börse | 50Hertz | Sonstiges | negative | 49 | 12 | 16:July-16:July |
| CHEMIEPARK_MARL_KRAFTWERKE | Amprion | Konventionell | negative | 30 | 8 | 14:July-15:July |
| Börse | 50Hertz | Sonstiges | positive | 26 | 7 | 11:July-11:July |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 20 | 5 | 15:July-15:July |
| Börse | TransnetBW | Sonstiges | positive | 3 | 2 | 04:July-06:July |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.3M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-07-30?
On 2026-07-30, estimated redispatch costs were approximately €1.01 million. This includes €0.3M for renewable curtailment compensation and €0.51M for conventional ramp-up costs.
Which power plants were most affected on 2026-07-30?
The most affected plant was Datteln_4 (Amprion) with 2,572 MWh of negative redispatch.
What was the electricity spot price on 2026-07-30?
The EPEX Day-Ahead spot price for DE_LU ranged from 1 to 222 €/MWh with an average of 123 €/MWh.