2,907MWh Curtailed
2,984MWh Ramped Up
€0.96MEst. Cost
326 MWPeak Positive
Day-Ahead Spot: 0-352 €/MWh (avg 126)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| Amprion | positive | 8 | 7,654 |
| TenneT DE | negative | 4 | 5,359 |
| Amprion | negative | 3 | 1,743 |
| TransnetBW | negative | 3 | 628 |
| 50Hertz | negative | 4 | 573 |
| 50Hertz | positive | 1 | 6 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| GERSTEINW_DTG2 (KapRes) | Amprion | Konventionell | positive | 153 | 3,669 | 22:July-22:July |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 250 | 2,125 | 07:July-16:July | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 250 | 2,125 | 07:July-16:July | |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 238 | 2,083 | 22:July-07:July |
| LAUSWARD_GUDF | Amprion | Konventionell | negative | 156 | 1,400 | 22:July-07:July |
| GERSTEINW_GTG1 (KapRes) | Amprion | Konventionell | positive | 42 | 1,008 | 22:July-22:July |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 850 | 07:July-16:July | |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | negative | 128 | 542 | 22:July-03:July |
| GUD_HERNE_6 | Amprion | Konventionell | positive | 333 | 500 | 06:July-08:July |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 278 | 418 | 06:July-08:July |
| Datteln_4 | Amprion | Konventionell | negative | 73 | 309 | 17:July-22:July |
| Irsching 4 | TenneT DE | Konventionell | negative | 86 | 259 | 23:July-02:July |
| GERSTEINW_GTG1 (KapRes) | Amprion | Konventionell | positive | 40 | 169 | 17:July-22:July |
| GERSTEINW_DTG2 (KapRes) | Amprion | Konventionell | positive | 70 | 140 | 20:July-22:July |
| Lippendorf | 50Hertz | Konventionell | negative | 112 | 112 | 07:July-08:July |
| Börse | TransnetBW | Sonstiges | negative | 23 | 73 | 22:July-09:July |
| WEISWEILER_H | Amprion | Konventionell | positive | 58 | 73 | 06:July-08:July |
| 50H PV Witznitz | 50Hertz | negative | 143 | 36 | 08:July-08:July | |
| CHEMIEPARK_MARL_KRAFTWERKE | Amprion | Konventionell | negative | 34 | 34 | 22:July-23:July |
| illwerke vkw AG | TransnetBW | Sonstiges | negative | 10 | 12 | 12:July-14:July |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 10 | 12 | 12:July-14:July |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 29 | 7 | 08:July-08:July |
| Börse | 50Hertz | Sonstiges | positive | 24 | 6 | 16:July-16:July |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.29M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-07-29?
On 2026-07-29, estimated redispatch costs were approximately €0.96 million. This includes €0.29M for renewable curtailment compensation and €0.47M for conventional ramp-up costs.
Which power plants were most affected on 2026-07-29?
The most affected plant was GERSTEINW_DTG2 (KapRes) (Amprion) with 3,669 MWh of positive redispatch.
What was the electricity spot price on 2026-07-29?
The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 352 €/MWh with an average of 126 €/MWh.