← 2026-07-27

Tuesday, July 28, 2026

2026-07-29 →
2,885MWh Curtailed
2,833MWh Ramped Up
€0.88MEst. Cost
236 MWPeak Positive

Day-Ahead Spot: 0-238 €/MWh (avg 117)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 5 7,265
50Hertz negative 8 2,290
TenneT DE positive 2 1,635
Amprion positive 3 514
TransnetBW positive 1 362
TransnetBW negative 1 107
Amprion negative 1 72
50Hertz positive 1 30

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 250 2,250 08:July-17:July
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 250 2,250 08:July-17:July
Börse TenneT DE Sonstiges negative 333 1,415 22:July-02:July
ReserveKW Staudinger 5 TenneT DE Konventionell positive 333 1,415 22:July-02:July
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 100 900 08:July-17:July
Boxberg (Standort) 50Hertz Konventionell negative 441 882 06:July-08:July
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 160 600 07:July-11:July
BAG NWAK-Cluster 12 Pirach-Simbach TenneT DE Erneuerbar negative 50 450 08:July-17:July
Datteln_4 Amprion Konventionell positive 430 430 07:July-08:July
illwerke vkw AG TransnetBW Sonstiges positive 181 362 06:July-08:July
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 187 327 06:July-08:July
Braunschweig HKWM GT31 TenneT DE Konventionell positive 52 220 04:July-08:July
50H_EDIS_CR_LHG 50Hertz Erneuerbar negative 94 212 08:July-10:July
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 94 212 08:July-10:July
Börse TransnetBW Sonstiges negative 43 107 01:July-08:July
Börse Amprion Konventionell negative 143 72 15:July-15:July
Börse Amprion Konventionell positive 143 72 15:July-15:July
50H Berlin Marzahn 50Hertz Konventionell negative 33 33 07:July-08:July
50H Berlin Marzahn 50Hertz Konventionell positive 30 30 06:July-07:July
50H Berlin Lichterfelde 50Hertz Konventionell negative 12 22 06:July-08:July
BIBLIS_GT (bnBm) Amprion Konventionell positive 10 12 12:July-14:July
50H UW Putlitz 50Hertz Erneuerbar negative 9 2 07:July-07:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.26M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-28?

On 2026-07-28, estimated redispatch costs were approximately €0.88 million. This includes €0.29M for renewable curtailment compensation and €0.42M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-28?

The most affected plant was BAG NWAK-Cluster 15 Pleinting (TenneT DE) with 2,250 MWh of negative redispatch.

What was the electricity spot price on 2026-07-28?

The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 238 €/MWh with an average of 117 €/MWh.