2,322MWh Curtailed
1,979MWh Ramped Up
€0.74MEst. Cost
155 MWPeak Positive

Day-Ahead Spot: -5-154 €/MWh (avg 81)

TSO Breakdown

TSODirectionMeasuresTotal MWh
Amprion positive 24 29,563
TenneT DE negative 10 26,537
TenneT DE positive 3 19,468
50Hertz negative 11 4,098
TransnetBW positive 5 2,257
Amprion negative 3 951
50Hertz positive 2 352
TransnetBW negative 1 173

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 894 11,619 00:July-22:July
Börse TenneT DE Sonstiges positive 932 7,221 22:July-22:July
UW Dörpen-West TenneT DE Erneuerbar negative 368 6,258 04:July-22:July
WEISWEILER_G Amprion Konventionell positive 345 6,212 04:July-22:July
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 497 5,711 22:July-20:July
UW Büttel TenneT DE Erneuerbar negative 640 4,478 06:July-21:July
UW Dörpen-West TenneT DE Erneuerbar negative 653 3,916 22:July-04:July
Emsland Block C Amprion Konventionell positive 254 2,156 13:July-22:July
LAUSWARD_GUDF Amprion Konventionell positive 323 2,102 22:July-04:July
WEISWEILER_G Amprion Konventionell positive 256 2,052 22:July-06:July
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,900 07:July-17:July
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,900 07:July-17:July
HERDECKE_H6 Amprion Konventionell positive 218 1,857 22:July-06:July
WEISWEILER_G Amprion Konventionell positive 233 1,809 01:July-18:July
HAMMUENTROP_20 Amprion Konventionell positive 250 1,751 15:July-22:July
Emsland Block C Amprion Konventionell positive 176 1,719 23:July-22:July
Emsland Block C Amprion Konventionell positive 236 1,655 22:July-05:July
LAUSWARD_GUDF Amprion Konventionell positive 266 1,465 15:July-21:July
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 173 1,425 00:July-08:July
GERSTEINW_G (KapRes) Amprion Konventionell positive 135 1,247 12:July-22:July
GERSTEINW_F (KapRes) Amprion Konventionell positive 133 1,226 12:July-22:July
HERDECKE_H6 Amprion Konventionell positive 215 1,021 17:July-22:July
50H_EDIS_CR_WU_NORD 50Hertz Erneuerbar negative 125 972 09:July-17:July
UW Diele TenneT DE Erneuerbar negative 225 900 14:July-18:July
HAMMUENTROP_20 Amprion Konventionell positive 147 774 22:July-06:July
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 137 755 13:July-19:July
NEURATH_G Amprion Konventionell negative 217 706 04:July-07:July
HAMMUENTROP_20 Amprion Konventionell positive 165 701 17:July-22:July
Hannover-Linden GuD TenneT DE Konventionell positive 105 628 14:July-20:July
illwerke vkw AG TransnetBW Sonstiges positive 152 608 18:July-22:July
Rostock Kohlekraftwerk 50Hertz Konventionell negative 98 589 22:July-22:July
Knapsack 1 Amprion Konventionell positive 158 552 13:July-16:July
AVA Cluster Voslapp TenneT DE Erneuerbar negative 100 550 16:July-22:July
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 50 475 07:July-17:July
50H_EDIS_CR_LV_WU 50Hertz Erneuerbar negative 78 470 08:July-14:July
SHN Cluster Heide West T411 T412 TenneT DE Erneuerbar negative 225 450 17:July-19:July
Rostock Kohlekraftwerk 50Hertz Konventionell negative 133 400 19:July-22:July
50H Berlin Marzahn 50Hertz Konventionell negative 76 379 22:July-22:July
LAUSWARD_GUDF Amprion Konventionell positive 286 358 20:July-22:July
GERSTEINW_F (KapRes) Amprion Konventionell positive 143 322 22:July-00:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 71 284 01:July-05:July
NEURATH_G Amprion Konventionell negative 112 223 05:July-07:July
Emsland Block B Amprion Konventionell positive 54 216 18:July-22:July
Schkopau 50Hertz Konventionell positive 93 186 04:July-06:July
Börse TransnetBW Sonstiges negative 115 173 22:July-18:July
Börse Amprion Konventionell positive 225 169 16:July-17:July
Börse 50Hertz Sonstiges positive 74 166 02:July-04:July
50H Berlin Marzahn 50Hertz Konventionell negative 45 135 04:July-07:July
Heizkraftwerk Stuttgart-Münster GT 88 TransnetBW Konventionell positive 47 94 17:July-19:July
Datteln_4 Amprion Konventionell positive 91 91 07:July-08:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.22M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-18?

On 2026-07-18, estimated redispatch costs were approximately €0.74 million. This includes €0.23M for renewable curtailment compensation and €0.22M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-18?

The most affected plant was Börse (TenneT DE) with 11,619 MWh of positive redispatch.

What was the electricity spot price on 2026-07-18?

The EPEX Day-Ahead spot price for DE_LU ranged from -5 to 154 €/MWh with an average of 81 €/MWh.