2,256MWh Curtailed
1,668MWh Ramped Up
€0.65MEst. Cost
167 MWPeak Positive
Day-Ahead Spot: -6-167 €/MWh (avg 72)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 9 | 10,569 |
| TenneT DE | positive | 2 | 2,440 |
| Amprion | positive | 3 | 2,405 |
| 50Hertz | negative | 8 | 1,778 |
| 50Hertz | positive | 6 | 632 |
| Amprion | negative | 2 | 313 |
| TransnetBW | positive | 2 | 81 |
| TransnetBW | negative | 1 | 18 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| AVA Cluster Voslapp | TenneT DE | negative | 258 | 2,962 | 05:July-16:July | |
| UW Emden-Ost | TenneT DE | negative | 240 | 2,516 | 07:July-18:July | |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 144 | 2,408 | 05:July-22:July |
| Emsland Block C | Amprion | Konventionell | positive | 245 | 1,960 | 22:July-06:July |
| UW Emden-Ost | TenneT DE | negative | 231 | 1,327 | 12:July-17:July | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 172 | 1,033 | 22:July-06:July |
| 50H_EDIS_CR_WU_NORD | 50Hertz | negative | 136 | 920 | 07:July-14:July | |
| UW Dörpen-West | TenneT DE | negative | 212 | 848 | 04:July-08:July | |
| UW Dörpen-West | TenneT DE | negative | 207 | 828 | 12:July-16:July | |
| UW Diele | TenneT DE | negative | 298 | 595 | 16:July-18:July | |
| Emsland Block C | Amprion | Konventionell | positive | 194 | 388 | 04:July-06:July |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 133 | 333 | 19:July-22:July |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | positive | 140 | 279 | 08:July-10:July |
| Datteln_4 | Amprion | Konventionell | negative | 138 | 275 | 16:July-18:July |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 132 | 264 | 02:July-06:July |
| Jänschwalde (Standort) | 50Hertz | Konventionell | positive | 112 | 224 | 08:July-10:July |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 95 | 190 | 04:July-06:July |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 184 | 184 | 05:July-06:July |
| UW Büttel | TenneT DE | negative | 102 | 127 | 20:July-21:July | |
| Schkopau | 50Hertz | Konventionell | positive | 109 | 109 | 00:July-01:July |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 51 | 102 | 04:July-06:July |
| WALSUM_10 | Amprion | Konventionell | positive | 57 | 57 | 18:July-19:July |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 53 | 53 | 22:July-23:July |
| Börse | TransnetBW | Sonstiges | positive | 28 | 42 | 07:July-22:July |
| Börse | TransnetBW | Sonstiges | positive | 13 | 40 | 22:July-21:July |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 38 | 38 | 22:July-23:July |
| Börse | Amprion | Konventionell | negative | 75 | 38 | 06:July-06:July |
| Braunschweig HKWN GT | TenneT DE | Konventionell | positive | 16 | 32 | 08:July-10:July |
| 50H BASF Schwarzheide | 50Hertz | Konventionell | negative | 4 | 27 | 00:July-11:July |
| Börse | TransnetBW | Sonstiges | negative | 24 | 18 | 23:July-17:July |
| Lippendorf | 50Hertz | Konventionell | positive | 10 | 10 | 20:July-21:July |
| Börse | 50Hertz | Sonstiges | positive | 34 | 8 | 17:July-17:July |
| 50H Erfurt-Ost HKW GuD | 50Hertz | Konventionell | positive | 2 | 2 | 22:July-23:July |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.2M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-07-19?
On 2026-07-19, estimated redispatch costs were approximately €0.65 million. This includes €0.23M for renewable curtailment compensation and €0.17M for conventional ramp-up costs.
Which power plants were most affected on 2026-07-19?
The most affected plant was AVA Cluster Voslapp (TenneT DE) with 2,962 MWh of negative redispatch.
What was the electricity spot price on 2026-07-19?
The EPEX Day-Ahead spot price for DE_LU ranged from -6 to 167 €/MWh with an average of 72 €/MWh.