← 2026-07-18

Sunday, July 19, 2026

2026-07-20 →
2,256MWh Curtailed
1,668MWh Ramped Up
€0.65MEst. Cost
167 MWPeak Positive

Day-Ahead Spot: -6-167 €/MWh (avg 72)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 9 10,569
TenneT DE positive 2 2,440
Amprion positive 3 2,405
50Hertz negative 8 1,778
50Hertz positive 6 632
Amprion negative 2 313
TransnetBW positive 2 81
TransnetBW negative 1 18

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
AVA Cluster Voslapp TenneT DE Erneuerbar negative 258 2,962 05:July-16:July
UW Emden-Ost TenneT DE Erneuerbar negative 240 2,516 07:July-18:July
Hannover-Linden GuD TenneT DE Konventionell positive 144 2,408 05:July-22:July
Emsland Block C Amprion Konventionell positive 245 1,960 22:July-06:July
UW Emden-Ost TenneT DE Erneuerbar negative 231 1,327 12:July-17:July
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 172 1,033 22:July-06:July
50H_EDIS_CR_WU_NORD 50Hertz Erneuerbar negative 136 920 07:July-14:July
UW Dörpen-West TenneT DE Erneuerbar negative 212 848 04:July-08:July
UW Dörpen-West TenneT DE Erneuerbar negative 207 828 12:July-16:July
UW Diele TenneT DE Erneuerbar negative 298 595 16:July-18:July
Emsland Block C Amprion Konventionell positive 194 388 04:July-06:July
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 133 333 19:July-22:July
Schwarze Pumpe (Standort) 50Hertz Konventionell positive 140 279 08:July-10:July
Datteln_4 Amprion Konventionell negative 138 275 16:July-18:July
Jänschwalde (Standort) 50Hertz Konventionell negative 132 264 02:July-06:July
Jänschwalde (Standort) 50Hertz Konventionell positive 112 224 08:July-10:July
Jänschwalde (Standort) 50Hertz Konventionell negative 95 190 04:July-06:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 184 184 05:July-06:July
UW Büttel TenneT DE Erneuerbar negative 102 127 20:July-21:July
Schkopau 50Hertz Konventionell positive 109 109 00:July-01:July
50H Berlin Marzahn 50Hertz Konventionell negative 51 102 04:July-06:July
WALSUM_10 Amprion Konventionell positive 57 57 18:July-19:July
50H Berlin Marzahn 50Hertz Konventionell negative 53 53 22:July-23:July
Börse TransnetBW Sonstiges positive 28 42 07:July-22:July
Börse TransnetBW Sonstiges positive 13 40 22:July-21:July
Rostock Kohlekraftwerk 50Hertz Konventionell negative 38 38 22:July-23:July
Börse Amprion Konventionell negative 75 38 06:July-06:July
Braunschweig HKWN GT TenneT DE Konventionell positive 16 32 08:July-10:July
50H BASF Schwarzheide 50Hertz Konventionell negative 4 27 00:July-11:July
Börse TransnetBW Sonstiges negative 24 18 23:July-17:July
Lippendorf 50Hertz Konventionell positive 10 10 20:July-21:July
Börse 50Hertz Sonstiges positive 34 8 17:July-17:July
50H Erfurt-Ost HKW GuD 50Hertz Konventionell positive 2 2 22:July-23:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.2M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-19?

On 2026-07-19, estimated redispatch costs were approximately €0.65 million. This includes €0.23M for renewable curtailment compensation and €0.17M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-19?

The most affected plant was AVA Cluster Voslapp (TenneT DE) with 2,962 MWh of negative redispatch.

What was the electricity spot price on 2026-07-19?

The EPEX Day-Ahead spot price for DE_LU ranged from -6 to 167 €/MWh with an average of 72 €/MWh.