3,006MWh Curtailed
2,675MWh Ramped Up
€0.96MEst. Cost
187 MWPeak Positive

Day-Ahead Spot: 0-195 €/MWh (avg 104)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 8 8,336
50Hertz negative 5 770
Amprion negative 3 681
TransnetBW positive 2 388
Amprion positive 2 131
50Hertz positive 2 59
TenneT DE positive 1 34

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 300 2,700 08:July-17:July
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,800 08:July-17:July
UW Büttel TenneT DE Erneuerbar negative 450 1,124 04:July-19:July
Irsching 4 TenneT DE Konventionell negative 158 1,067 14:July-21:July
UW Büttel TenneT DE Erneuerbar negative 268 670 01:July-04:July
AVA Cluster Voslapp TenneT DE Erneuerbar negative 71 462 09:July-16:July
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 50 450 08:July-17:July
Datteln_4 Amprion Konventionell negative 177 353 16:July-18:July
illwerke vkw AG TransnetBW Sonstiges positive 143 286 04:July-18:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 225 281 15:July-16:July
WALSUM_10 Amprion Konventionell negative 124 248 16:July-18:July
50H_EDIS_CR_WU_NORD 50Hertz Erneuerbar negative 100 200 13:July-15:July
50H Berlin Marzahn 50Hertz Konventionell negative 42 169 05:July-16:July
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 41 122 04:July-07:July
Heizkraftwerk_Pforzheim TransnetBW Konventionell positive 26 102 04:July-08:July
50H_WEMA_CR_PMS 50Hertz Erneuerbar negative 50 100 15:July-17:July
NIEDERAUSSEM_K Amprion Konventionell negative 107 80 16:July-16:July
SHN Cluster Süderdonn T411 TenneT DE Erneuerbar negative 62 62 04:July-05:July
50H InfraLeuna IKW 50Hertz Konventionell positive 50 50 04:July-05:July
Eltmann TenneT DE Konventionell positive 23 34 03:July-05:July
50H_EDIS_CR_HND 50Hertz Erneuerbar negative 27 20 12:July-15:July
50H BASF Schwarzheide 50Hertz Konventionell positive 9 9 04:July-05:July
BIBLIS_GT (bnBm) Amprion Konventionell positive 7 9 12:July-14:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.29M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-20?

On 2026-07-20, estimated redispatch costs were approximately €0.96 million. This includes €0.3M for renewable curtailment compensation and €0.36M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-20?

The most affected plant was BAG NWAK-Cluster 15 Pleinting (TenneT DE) with 2,700 MWh of negative redispatch.

What was the electricity spot price on 2026-07-20?