3,133MWh Curtailed
3,317MWh Ramped Up
€1.06MEst. Cost
172 MWPeak Positive

Day-Ahead Spot: 98-177 €/MWh (avg 139)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 5 10,472
Amprion positive 4 2,603
50Hertz negative 8 2,185
TransnetBW positive 3 799
Amprion negative 6 771
TransnetBW negative 2 195

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 553 8,012 23:July-22:July
HERDECKE_H6 Amprion Konventionell positive 211 2,106 23:July-22:July
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 156 972 13:July-20:July
50H_EDIS_CR_WU_NORD 50Hertz Erneuerbar negative 206 875 10:July-15:July
Börse TransnetBW Sonstiges positive 104 701 23:July-21:July
50H Berlin Marzahn 50Hertz Konventionell negative 91 639 23:July-22:July
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 150 638 11:July-16:July
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 150 638 11:July-16:July
HAMMUENTROP_20 Amprion Konventionell positive 205 308 07:July-09:July
Jänschwalde (Standort) 50Hertz Konventionell negative 300 300 08:July-09:July
HAMMUENTROP_20 Amprion Konventionell negative 189 236 23:July-00:July
WEISWEILER_G Amprion Konventionell negative 81 222 15:July-18:July
WEISWEILER_H Amprion Konventionell negative 78 215 15:July-18:July
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 50 212 11:July-16:July
NIEHL-II Amprion Konventionell positive 180 180 08:July-09:July
Börse TransnetBW Sonstiges negative 95 142 09:July-19:July
50H_EDIS_CR_LV_WU 50Hertz Erneuerbar negative 92 138 12:July-14:July
WALSUM_10 Amprion Konventionell negative 82 82 14:July-15:July
Börse TransnetBW Sonstiges positive 46 80 13:July-19:July
50H Berlin Marzahn 50Hertz Konventionell negative 76 76 08:July-09:July
50H_EDIS_CR_WU_SUED 50Hertz Erneuerbar negative 100 75 10:July-11:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 54 54 08:July-09:July
Börse TransnetBW Sonstiges negative 18 53 23:July-14:July
Schkopau 50Hertz Konventionell negative 110 28 07:July-08:July
Heizkraftwerk_Pforzheim TransnetBW Konventionell positive 18 18 17:July-18:July
BIBLIS_GT (bnBm) Amprion Konventionell positive 7 9 07:July-09:July
INFRA_HOE_GTX3 Amprion Konventionell negative 10 8 15:July-15:July
INFRA_HOE_GTX2 Amprion Konventionell negative 10 8 15:July-15:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.32M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-17?

On 2026-07-17, estimated redispatch costs were approximately €1.06 million. This includes €0.31M for renewable curtailment compensation and €0.56M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-17?

The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 8,012 MWh of negative redispatch.

What was the electricity spot price on 2026-07-17?

The EPEX Day-Ahead spot price for DE_LU ranged from 98 to 177 €/MWh with an average of 139 €/MWh.