3,191MWh Curtailed
3,611MWh Ramped Up
€1.12MEst. Cost
284 MWPeak Positive

Day-Ahead Spot: 82-340 €/MWh (avg 160)

TSO Breakdown

TSODirectionMeasuresTotal MWh
50Hertz negative 18 9,407
TenneT DE negative 5 5,796
TransnetBW positive 7 3,569
Amprion positive 6 3,030
Amprion negative 6 2,042
TenneT DE positive 3 806
TransnetBW negative 2 180
50Hertz positive 2 20

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Lippendorf 50Hertz Konventionell negative 333 3,078 06:July-15:July
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 300 2,850 07:July-17:July
HAMMUENTROP_20 Amprion Konventionell positive 273 1,976 07:July-15:July
illwerke vkw AG TransnetBW Sonstiges positive 263 1,974 06:July-15:July
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,900 07:July-17:July
Rostock Kohlekraftwerk 50Hertz Konventionell negative 176 1,274 07:July-15:July
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 100 950 07:July-17:July
50H PV Witznitz 50Hertz Erneuerbar negative 215 860 08:July-12:July
Datteln_4 Amprion Konventionell negative 189 755 09:July-13:July
Boxberg (Standort) 50Hertz Konventionell negative 198 595 07:July-12:July
Hannover-Linden GuD TenneT DE Konventionell positive 97 559 06:July-11:July
Jänschwalde (Standort) 50Hertz Konventionell negative 239 537 07:July-09:July
50H_TEN_CR_M2_VIB 50Hertz Erneuerbar negative 226 508 09:July-11:July
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 156 469 09:July-12:July
50H_MNS_CR_PUL 50Hertz Erneuerbar negative 225 450 08:July-10:July
BASF-GESAMTEINSPEISG Amprion Konventionell positive 109 435 10:July-14:July
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 113 422 08:July-12:July
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 200 400 10:July-12:July
Heizkraftwerk Stuttgart-Münster GT 87 TransnetBW Konventionell positive 56 394 08:July-15:July
GUD_HERNE_6 Amprion Konventionell negative 98 394 10:July-15:July
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 66 393 07:July-13:July
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 186 372 08:July-10:July
WALSUM_10 Amprion Konventionell negative 175 350 10:July-12:July
WALSUM_10 Amprion Konventionell negative 112 335 14:July-17:July
50H_TEN_CR_M2_VIB 50Hertz Erneuerbar negative 224 280 08:July-10:July
50H Berlin Marzahn 50Hertz Konventionell negative 87 260 13:July-16:July
50H_MNS_CR_LAU_Nord 50Hertz Erneuerbar negative 147 220 09:July-11:July
50H Berlin Marzahn 50Hertz Konventionell negative 31 219 07:July-17:July
Börse TransnetBW Sonstiges negative 64 175 06:July-17:July
WEISWEILER_H Amprion Konventionell negative 57 170 15:July-18:July
Braunschweig HKWM GT31 TenneT DE Konventionell positive 45 157 06:July-10:July
Heizkraftwerk_Pforzheim TransnetBW Konventionell positive 20 140 08:July-15:July
50H_MNS_CR_PUL 50Hertz Erneuerbar negative 80 120 09:July-11:July
GUD_HERNE_6 Amprion Konventionell positive 101 101 08:July-09:July
WEISWEILER_H Amprion Konventionell positive 80 100 07:July-09:July
50H_MNS_CR_LAU_Sued 50Hertz Erneuerbar negative 100 100 09:July-10:July
illwerke vkw AG TransnetBW Sonstiges positive 48 97 16:July-18:July
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 72 90 08:July-09:July
50H_AVA_CR_STW 50Hertz Erneuerbar negative 150 75 09:July-09:July
Börse TransnetBW Sonstiges positive 20 72 07:July-15:July
50H_TEN_CR_M1_EI 50Hertz Erneuerbar negative 50 50 09:July-10:July
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 50 50 10:July-11:July
Eltmann TenneT DE Konventionell negative 37 46 07:July-09:July
WEISWEILER_G Amprion Konventionell negative 17 38 14:July-17:July
WEISWEILER_G Amprion Konventionell positive 50 25 08:July-09:July
Börse 50Hertz Sonstiges positive 26 13 00:July-13:July
Börse 50Hertz Sonstiges negative 37 9 14:July-14:July
Börse 50Hertz Sonstiges positive 26 7 13:July-13:July
HKW Aalen TransnetBW Konventionell negative 5 5 13:July-14:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.34M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-16?

On 2026-07-16, estimated redispatch costs were approximately €1.12 million. This includes €0.32M for renewable curtailment compensation and €0.69M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-16?

The most affected plant was Lippendorf (50Hertz) with 3,078 MWh of negative redispatch.

What was the electricity spot price on 2026-07-16?

The EPEX Day-Ahead spot price for DE_LU ranged from 82 to 340 €/MWh with an average of 160 €/MWh.