2,597MWh Curtailed
3,432MWh Ramped Up
€1.09MEst. Cost
550 MWPeak Positive

Day-Ahead Spot: 11-545 €/MWh (avg 141)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 8 11,836
50Hertz negative 23 10,300
Amprion positive 10 7,481
TenneT DE positive 4 3,098
TransnetBW positive 3 681
TransnetBW negative 1 514
50Hertz positive 10 377
Amprion negative 2 24

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 14 Schwandorf TenneT DE Erneuerbar negative 325 2,600 07:June-15:June
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 275 2,200 07:June-15:June
Emsland Block C Amprion Konventionell positive 282 2,044 03:June-11:June
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 250 2,000 07:June-15:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 654 1,962 06:June-09:June
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 296 1,924 07:June-14:June
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 200 1,600 07:June-15:June
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,600 07:June-15:June
Börse Amprion Konventionell positive 489 1,467 19:June-22:June
BAG NWAK-Cluster 12 Pirach-Simbach TenneT DE Erneuerbar negative 150 1,200 07:June-15:June
50H PV Witznitz 50Hertz Erneuerbar negative 202 1,061 07:June-14:June
Emsland Block B Amprion Konventionell positive 163 939 03:June-09:June
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 132 927 05:June-13:June
WALSUM_10 Amprion Konventionell positive 245 795 07:June-10:June
50H OWP Arkona 50Hertz Erneuerbar negative 127 760 07:June-13:June
LAUSWARD_GUDF Amprion Konventionell positive 199 745 06:June-16:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 166 705 03:June-08:June
50H OWP Wikinger 50Hertz Erneuerbar negative 105 658 06:June-13:June
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 102 610 07:June-13:June
Lippendorf 50Hertz Konventionell negative 221 608 05:June-08:June
BAG NWAK-Cluster 13 Etzenricht TenneT DE Erneuerbar negative 100 600 09:June-15:June
Boxberg (Standort) 50Hertz Konventionell negative 90 586 03:June-16:June
Hannover-Linden GuD TenneT DE Konventionell positive 68 530 07:June-14:June
Börse TransnetBW Sonstiges negative 158 514 07:June-16:June
WEISWEILER_H Amprion Konventionell positive 228 512 06:June-08:June
HAMMUENTROP_20 Amprion Konventionell positive 325 488 07:June-09:June
Boxberg (Standort) 50Hertz Konventionell negative 237 474 07:June-09:June
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 203 457 07:June-10:June
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 189 425 08:June-11:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 148 371 14:June-16:June
50H PV Bartow 50Hertz Erneuerbar negative 62 358 07:June-13:June
GUD_HERNE_6 Amprion Konventionell positive 218 272 07:June-08:June
Marbach GT 4 (bnBm) TransnetBW Konventionell positive 216 270 10:June-12:June
50H PV Witznitz 50Hertz Erneuerbar negative 182 228 10:June-12:June
illwerke vkw AG TransnetBW Sonstiges positive 113 226 07:June-11:June
Hannover-Linden GuD TenneT DE Konventionell positive 94 187 07:June-09:June
Börse TransnetBW Sonstiges positive 106 185 06:June-13:June
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 73 183 19:June-22:June
50H UW Bertikow 50Hertz Erneuerbar negative 45 146 07:June-11:June
Jänschwalde (Standort) 50Hertz Konventionell negative 76 114 06:June-08:June
50H Berlin Marzahn 50Hertz Konventionell negative 28 84 06:June-09:June
50H UW Schönewalde 50Hertz Erneuerbar negative 17 69 08:June-13:June
50H_EDIS_CR_HND 50Hertz Erneuerbar negative 30 68 10:June-13:June
50H PV Bartow 50Hertz Erneuerbar negative 57 42 11:June-11:June
Ahrensfelde C (KapRes) 50Hertz Konventionell positive 16 41 14:June-16:June
Ahrensfelde D (KapRes) 50Hertz Konventionell positive 16 41 14:June-16:June
Thyrow A (KapRes) 50Hertz Konventionell positive 16 41 14:June-16:June
Thyrow B (KapRes) 50Hertz Konventionell positive 16 41 14:June-16:June
Thyrow D (KapRes) 50Hertz Konventionell positive 16 41 14:June-16:June
Thyrow E (KapRes) 50Hertz Konventionell positive 16 41 14:June-16:June

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.33M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-06-18?

On 2026-06-18, estimated redispatch costs were approximately €1.09 million. This includes €0.26M for renewable curtailment compensation and €0.59M for conventional ramp-up costs.

Which power plants were most affected on 2026-06-18?

The most affected plant was BAG NWAK-Cluster 14 Schwandorf (TenneT DE) with 2,600 MWh of negative redispatch.

What was the electricity spot price on 2026-06-18?

The EPEX Day-Ahead spot price for DE_LU ranged from 11 to 545 €/MWh with an average of 141 €/MWh.