← 2026-06-18

Friday, June 19, 2026

2026-06-20 →
2,340MWh Curtailed
2,690MWh Ramped Up
€0.88MEst. Cost
216 MWPeak Positive

Day-Ahead Spot: 10-213 €/MWh (avg 107)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 15 17,804
TenneT DE positive 3 2,778
Amprion positive 1 510
Amprion negative 5 505
50Hertz negative 2 213
TransnetBW positive 1 16
50Hertz positive 1 7

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 14 Schwandorf TenneT DE Erneuerbar negative 350 2,800 07:June-15:June
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 300 2,400 07:June-15:June
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 250 2,000 07:June-15:June
Börse TenneT DE Sonstiges negative 325 1,788 16:June-22:June
ReserveKW Staudinger 4 TenneT DE Konventionell positive 350 1,750 17:June-22:June
BAG NWAK-Cluster 02 Oberhaid-Redwitz TenneT DE Erneuerbar negative 200 1,600 07:June-15:June
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 1,600 07:June-15:June
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 200 1,600 07:June-15:June
BAG NWAK-Cluster 12 Pirach-Simbach TenneT DE Erneuerbar negative 150 1,200 07:June-15:June
Börse TenneT DE Sonstiges negative 369 1,015 22:June-00:June
ReserveKW Staudinger 4 TenneT DE Konventionell positive 369 1,015 22:June-00:June
BAG NWAK-Cluster 13 Etzenricht TenneT DE Erneuerbar negative 100 800 07:June-15:June
AVA Cluster Voslapp TenneT DE Erneuerbar negative 168 588 23:June-02:June
BIBLIS_GT (bnBm) Amprion Konventionell positive 136 510 02:June-10:June
BAG NWAK-Cluster 04 Aschaffenburg TenneT DE Erneuerbar negative 50 400 07:June-15:June
GUD_HERNE_6 Amprion Konventionell negative 100 250 02:June-07:June
50H_WEMA_CR_PMS 50Hertz Erneuerbar negative 94 188 11:June-13:June
KMW_KW3 Amprion Konventionell negative 100 125 02:June-07:June
NIEHL-31-GUD Amprion Konventionell negative 100 125 02:June-07:June
50H_EDIS_CR_HND 50Hertz Erneuerbar negative 20 25 11:June-13:June
Börse TransnetBW Sonstiges positive 4 16 23:June-04:June
ReserveKW Staudinger 4 TenneT DE Konventionell positive 50 12 16:June-16:June
Börse 50Hertz Sonstiges positive 14 7 23:June-23:June
CHEMIEPARK_MARL_KRAFTWERKE Amprion Konventionell negative 5 5 07:June-08:June
UW Dörpen-West TenneT DE Erneuerbar negative 1 4 23:June-04:June
UW Diele TenneT DE Erneuerbar negative 1 4 23:June-04:June
UW Emden-Ost TenneT DE Erneuerbar negative 1 4 23:June-04:June
EGM_DTS Amprion Sonstiges negative 2 0 10:June-10:June

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.26M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-06-19?

On 2026-06-19, estimated redispatch costs were approximately €0.88 million. This includes €0.23M for renewable curtailment compensation and €0.37M for conventional ramp-up costs.

Which power plants were most affected on 2026-06-19?

The most affected plant was BAG NWAK-Cluster 14 Schwandorf (TenneT DE) with 2,800 MWh of negative redispatch.

What was the electricity spot price on 2026-06-19?

The EPEX Day-Ahead spot price for DE_LU ranged from 10 to 213 €/MWh with an average of 107 €/MWh.